Multi-well time-lapse nodal analysis of transient production systems
    3.
    发明授权
    Multi-well time-lapse nodal analysis of transient production systems 有权
    瞬时生产系统的多时间延时节点分析

    公开(公告)号:US08788252B2

    公开(公告)日:2014-07-22

    申请号:US13281152

    申请日:2011-10-25

    IPC分类号: G06G7/48

    CPC分类号: E21B43/00

    摘要: A method, apparatus and program product utilize an analytical reservoir simulator to perform inflow simulation for a node during nodal analysis in a multi-well petroleum production system. By doing so, time-lapse nodal analysis may be performed of a transient production system in a multi-well context, often taking into account production history and the transient behavior of a reservoir system. Moreover, in some instances, an interference effect from different wells in a multi-well production system may be considered, and in some instances nodal analysis may be performed simultaneously for multiple wells. Multi-layer nodal analysis may also be performed in some instances to account for the pressure loss in a wellbore between multiple layers.

    摘要翻译: 一种方法,装置和程序产品利用分析储层模拟器在多井石油生产系统中的节点分析期间对节点进行流入模拟。 通过这样做,可以在多井环境中对瞬时生产系统进行延时节点分析,通常考虑到油藏系统的生产历史和瞬态特性。 此外,在一些情况下,可以考虑来自多井生产系统中的不同井的干扰效应,并且在一些情况下,可以针对多个井同时进行节点分析。 在某些情况下也可以执行多层节点分析,以解决多层之间的井眼中的压力损失。

    SYSTEM AND METHOD FOR CONTROLLING AN ADVANCING FLUID FRONT OF A RESERVOIR
    5.
    发明申请
    SYSTEM AND METHOD FOR CONTROLLING AN ADVANCING FLUID FRONT OF A RESERVOIR 失效
    控制储层流体前端的系统和方法

    公开(公告)号:US20120016649A1

    公开(公告)日:2012-01-19

    申请号:US12837550

    申请日:2010-07-16

    IPC分类号: G06G7/48

    CPC分类号: E21B43/12

    摘要: A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan.

    摘要翻译: 提供了一种用于控制储存器中朝前向井眼前进的水面的系统和方法。 该系统具有生产控制单元。 生产控制单元具有用于产生储存器模型的储存器单元和用于产生生产路径模型的生产路径单元,所述生产路径模型在井筒的寿命期间确定关于井筒的至少一个压力参数。 生产控制单元具有用于生产优化井场功能的井计划的生产优化器单元。 生产控制单元可以用于利用至少一个控制装置来控制储存器中的前进流体前部,并且其中基于井计划构建生产路径。

    System and method for controlling an advancing fluid front of a reservoir
    6.
    发明授权
    System and method for controlling an advancing fluid front of a reservoir 失效
    用于控制储存器前进流体前部的系统和方法

    公开(公告)号:US08700371B2

    公开(公告)日:2014-04-15

    申请号:US12837550

    申请日:2010-07-16

    CPC分类号: E21B43/12

    摘要: A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan.

    摘要翻译: 提供了一种用于控制储存器中朝前向井眼前进的水面的系统和方法。 该系统具有生产控制单元。 生产控制单元具有用于产生储存器模型的储存器单元和用于产生生产路径模型的生产路径单元,所述生产路径模型在井筒的寿命期间确定关于井筒的至少一个压力参数。 生产控制单元具有用于生产优化井场功能的井计划的生产优化器单元。 生产控制单元可以用于利用至少一个控制装置来控制储存器中的前进流体前部,并且其中基于井计划构建生产路径。