-
公开(公告)号:US4178672A
公开(公告)日:1979-12-18
申请号:US906823
申请日:1978-05-17
申请人: Raymond F. Amico , Peter J. Amico
发明人: Raymond F. Amico , Peter J. Amico
CPC分类号: B23P19/04 , Y10T29/49829 , Y10T29/4987 , Y10T29/53365 , Y10T29/53374 , Y10T29/53387 , Y10T29/53422 , Y10T29/53426 , Y10T29/53478 , Y10T29/53657
摘要: An automatic machine for assembling and banding together the components making up an expansion shell so that the assembly can be conveniently packaged and shipped. In one embodiment, the machine contains a series of work stations arranged to assemble the bolt components within a die. The expansion shell halves are staked to a common strap and the components then passed through a combination forming gage and banding mechanism which aligns the parts in assembly and bands them together using a plastic sleeve. In a second embodiment of the invention, the expansion shells are staked to the strap prior to being loaded into the die.
摘要翻译: 一种用于将构成扩展壳的部件组装和捆扎在一起的自动机器,使得组件可以方便地被包装和运输。 在一个实施例中,机器包含一系列工作站,其被布置成在模具内组装螺栓部件。 将膨胀壳半部分固定在共同的带子上,然后元件通过组合形成量具和捆扎机构,使组件中的部件对准,并使用塑料套管将它们带到一起。 在本发明的第二实施例中,在装入模具之前,将膨胀壳放在带上。
-
公开(公告)号:US4257153A
公开(公告)日:1981-03-24
申请号:US32144
申请日:1979-04-23
申请人: Peter J. Amico , Raymond F. Amico
发明人: Peter J. Amico , Raymond F. Amico
CPC分类号: B23P11/00 , B23P19/04 , Y10T29/49829 , Y10T29/49901 , Y10T29/49915 , Y10T29/5337 , Y10T29/53522
摘要: Method and apparatus for automatically assembling and banding together the component parts of an expansion shell of the type typically used in a mine bolt assembly. The parts are loaded into a die position in a first work station wherein a tapered wedge is supported within a central hole passing through the die and two shell sections are seated on inclined sides located on opposite sides of the hole. A thin metal U-shaped strap is placed between die mounted guides so that the legs of the strap are positioned between raised ears carried by the shell segments and the base of the strap passes over the wedge. The die is advanced into a second work station where the ears are coined against the strap. The die is then returned to the first station where an ejection tool is passed upwardly through the hole in the die to force the wedge, and thus the other components, upwardly through a forming gauge and a banding block wherein the parts are conformed into a compact final configuration and bound together by means of a resilient band.
摘要翻译: 用于将通常用于矿用螺栓组件的类型的膨胀壳体的部件自动组装和捆扎在一起的方法和装置。 部件在第一工位中被加载到模具位置,其中锥形楔形件被支撑在通过模具的中心孔内,并且两个壳体部分位于位于孔的相对侧上的倾斜侧上。 将薄金属U形带放置在模具安装的引导件之间,使得带的腿定位在由壳段承载的凸起的耳朵之间,并且带的基部穿过楔形物。 模具前进到第二个工作站,耳朵被压在表带上。 然后将模具返回到第一工位,其中喷射工具向上通过模具中的孔,以迫使楔形物,并因此将其它部件向上通过成形计量器和条带块,其中部件被配合成紧凑型 最终配置并通过弹性带绑定在一起。
-