A computer-implemented method of performing project schedule forecasting based on stored project data includes receiving a first user input selecting a first plurality of work items in a project. Respective work items of the first plurality have respective work estimates. A second user input is received specifying one or more first work item attributes referencing historical work completion data. A first historical rate of work completion is determined in accordance with the historical work completion data referenced by the one or more first work item attributes. An estimated time of completion of the first plurality of work items is calculated in accordance with the first historical rate of work completion and provided for display.
摘要:
Systems and methods for providing multiple display modes for a pane in a graphical user interface are provided. In some implementations, a computer-implemented method for displaying a pane in a user interface, includes: in a first display mode: displaying the pane in the user interface, wherein display of the pane persists regardless of a position of a pointer icon in the user interface; and ceasing to display the pane in response to detecting selection of an indicator; and in a second display mode: displaying the pane in the user interface, wherein display of the pane persists while the pointer icon is positioned over the indicator or within the perimeter of the pane; and ceasing to display the pane in response to detecting that the pointer icon is no longer positioned over the indicator or within the perimeter of the pane.
摘要:
A method of managing agile software development includes displaying assets associated with an agile software development process. Selection of a first link corresponding to a respective asset of the displayed assets is detected; in response, one or more related assets associated with the respective asset are displayed. Selection of a second link corresponding to a first related asset of the one or more related assets is detected; in response, a user interface for editing attributes of the first related asset is displayed, wherein the user interface and the one or more related assets are displayed in a common window.
摘要:
A method of creating assets for agile software development includes detecting selection of an asset type for an asset template, receiving values of one or more attributes for the asset template, and creating the asset template. Upon detecting an action to select the asset template, creation of an asset of the selected asset type and having the received values is initiated.
摘要:
A method of managing tasks during agile software development includes detecting selection of a level in a project hierarchy. In response to said selection of the level, a table is displayed listing a plurality of assets associated with the level and showing tasks associated with respective assets of the plurality of assets. The table indicates a status of each task. A user action to update the status of a particular task is detected; in response, display of the particular task is updated to indicate an updated status of the particular task. Selection of one or more filter criteria is detected; in response, display of the table is updated based on the one or more filter criteria.
摘要:
A method for reporting build runs includes: obtaining code changes for a software product; identifying the code change as affecting a work item of a software product under development, the work item specifies a feature to be added to or a defect to be removed from the software product; generating (i) a plurality of build runs of the software product, respective build runs corresponding to one or more code changes; and (ii) data associating the work item with one or more build runs that each correspond to at least one of the one or more code changes specified as involving the work item; receiving a user input selecting the work item; and in response to the user input, displaying respective identifiers of at least one build run of the one or more build runs associated with the work item, including presenting an identifier of the at least one build run.
摘要:
A computer-implemented method of managing work items associated with agile software development includes displaying a first group of incomplete work items associated with a current iteration of an agile software development project. In response to a first user input, a first incomplete work item of the first group is transferred from the current iteration to a subsequent iteration of the agile software development project. A determination is made that no incomplete work items remain associated with the current iteration. The current iteration is closed and the subsequent iteration is activated.
摘要:
A computer-implemented method of displaying a pane in a user interface includes two display modes. In the first display mode, the pane is displayed in the user interface, wherein display of the pane persists regardless of a position of a pointer icon in the user interface, and display of the pane ceases in response to selection of an indicator. In the second display mode, the pane is displayed in the user interface, wherein display of the pane persists while the pointer icon is positioned over the indicator or within the perimeter of the pane, and display of the pane ceases in response to detecting that the pointer icon is no longer positioned over the indicator or within the perimeter of the pane.
摘要:
A computer-implemented method of developing software includes receiving successive code changes for a software product. Input is received specifying that one or more code changes involve a work item associated with development of the software product. A plurality of build runs of the software product is generated. Respective build runs of the plurality correspond to one or more of the successive code changes. Data is stored associating the work item with one or more build runs that each correspond to at least one of the one or more code changes specified as involving the work item. A user input selecting the work item is received; in response, respective identifiers of at least one build run of the one or more build runs associated with the work item are displayed.
摘要:
A method of managing agile software development includes displaying a group of assets associated with an agile software development process. The group has a particular type and the assets include a first set of attributes selected for display. In response to detecting a request by a first user, a group of available attributes is displayed including the first set. De-selection of an attribute from the first set is detected. For other users accessing respective groups of assets of the particular type, the first set of attributes is displayed for assets in the respective groups, wherein the first set does not include the deselected attribute.