-
公开(公告)号:US06920934B2
公开(公告)日:2005-07-26
申请号:US10713711
申请日:2003-11-14
CPC分类号: E21B33/04 , E21B23/00 , E21B23/04 , E21B33/14 , E21B43/10 , E21B43/103 , E21B43/105 , E21B43/106
摘要: The present invention provides a liner hanger and a method of hanging a liner in a wellbore. In one aspect, a process for setting a liner in a wellbore is provided in which a tubular having a slip formed on an outer diameter of the tubular at a first location and a preformed bypass for circulating a fluid disposed at a second location is set and expanded into substantial contact with an inner diameter of the wellbore, a casing, or another liner. In another aspect, a process for setting a liner in a wellbore is provided in which a tubular having a slip formed on an outer diameter of the tubular at a first location is placed in the wellbore, a bypass for circulating a fluid is formed downhole, the liner is set and expanded into substantial contact with an inner diameter of the wellbore, a casing, or another liner. In yet another aspect, a process for creating a liner top seal is provided in which the liner is set by expanding a protrusion in an upper end of a tubular into substantial contact with an inner diameter of the wellbore, and the upper end of the tubular is then reformed and expanded into substantial contact with the inner diameter of the wellbore.
摘要翻译: 本发明提供一种衬管悬挂器和将衬管悬挂在井眼中的方法。 一方面,提供了一种用于在井筒中设置衬套的方法,其中设置在第一位置处形成在管状物的外径上的滑动件和用于使布置在第二位置处的流体循环的预制旁路的管状物, 膨胀成与井筒的内径,壳体或另一衬管的实质接触。 在另一方面,提供了一种用于在井眼中设置衬套的方法,其中在第一位置处形成在管状物的外径上的滑块的管状物放置在井眼中,用于在井下形成用于循环流体的旁路, 衬套被固定并膨胀成与井眼,壳体或另一衬套的内径基本接触。 在另一方面,提供了一种用于产生衬里密封件的方法,其中衬套通过使管状件的上端中的突起膨胀成与井筒的内径基本接触而形成,并且管状物的上端 然后重新形成并膨胀成与井眼的内径充分接触。
-
公开(公告)号:US07048065B2
公开(公告)日:2006-05-23
申请号:US11168803
申请日:2005-06-28
IPC分类号: E21B43/10
CPC分类号: E21B33/04 , E21B23/00 , E21B23/04 , E21B33/14 , E21B43/10 , E21B43/103 , E21B43/105 , E21B43/106
摘要: The present invention provides a liner hanger and a method of hanging a liner in a wellbore. In one aspect, a process for setting a liner in a wellbore is provided in which a tubular having a slip formed on an outer diameter of the tubular at a first location and a preformed bypass for circulating a fluid disposed at a second location is set and expanded into substantial contact with an inner diameter of the wellbore, a casing, or another liner. In another aspect, a process for setting a liner in a wellbore is provided in which a tubular having a slip formed on an outer diameter of the tubular at a first location is placed in the wellbore, a bypass for circulating a fluid is formed downhole, the liner is set and expanded into substantial contact with an inner diameter of the wellbore, a casing, or another liner. In yet another aspect, a process for creating a liner top seal is provided in which the liner is set by expanding a protrusion in an upper end of a tubular into substantial contact with an inner diameter of the wellbore, and the upper end of the tubular is then reformed and expanded into substantial contact with the inner diameter of the wellbore.
-