-
公开(公告)号:US09068398B2
公开(公告)日:2015-06-30
申请号:US13149591
申请日:2011-05-31
申请人: Ronald Van Petegem , Kevin Quick , Egill Abrahamsen , Brian Michael Carline , Karsten Heidecke , Doyle Frederick Boutwell, Jr.
发明人: Ronald Van Petegem , Kevin Quick , Egill Abrahamsen , Brian Michael Carline , Karsten Heidecke , Doyle Frederick Boutwell, Jr.
IPC分类号: E21B17/01 , E21B7/124 , B63B25/28 , B63B35/00 , E21B15/02 , E21B19/00 , E21B19/09 , E21B19/14 , E21B19/15
CPC分类号: E21B7/124 , B63B25/28 , B63B35/00 , E21B15/02 , E21B17/012 , E21B17/015 , E21B19/002 , E21B19/09 , E21B19/143 , E21B19/15
摘要: Methods and apparatus for installing deepwater completions and performing well intervention from a vessel that can perform other duties while not running completions or performing interventions. The system for installing deepwater completions and performing well intervention may comprise a surface pipe handling and deployment package including a horizontally operated rig that may also be operated in a slanted mode. Deepwater completions may be deployed from the vessel via a buoyant horizontal riser (BHR), which may be supported by a submerged buoyant tensioning system (BTS). In this manner, the cost of performing completion or intervention operations may be significantly reduced compared to such operations run from a drilling rig.
摘要翻译: 用于安装深水完井和执行良好干预的方法和装置,可以在不运行完井或执行干预措施的情况下执行其他任务。 用于安装深水完井和进行良好干预的系统可以包括表面管道处理和展开包装,其包括也可以倾斜模式操作的水平操作的钻机。 深水完井可以通过浮动的水平提升管(BHR)从船舶部署,其可以由浸没式浮力张紧系统(BTS)支撑。 以这种方式,与从钻机运行的这种操作相比,执行完成或干预操作的成本可能显着降低。
-
公开(公告)号:US20110290499A1
公开(公告)日:2011-12-01
申请号:US13149591
申请日:2011-05-31
申请人: Ronald Van Petegem , Kevin Quick , Egill Abrahamsen , Brian Michael Carline , Karsten Heidecke , Doyle Frederick Boutwell, JR.
发明人: Ronald Van Petegem , Kevin Quick , Egill Abrahamsen , Brian Michael Carline , Karsten Heidecke , Doyle Frederick Boutwell, JR.
CPC分类号: E21B7/124 , B63B25/28 , B63B35/00 , E21B15/02 , E21B17/012 , E21B17/015 , E21B19/002 , E21B19/09 , E21B19/143 , E21B19/15
摘要: Methods and apparatus for installing deepwater completions and performing well intervention from a vessel that can perform other duties while not running completions or performing interventions. The system for installing deepwater completions and performing well intervention may comprise a surface pipe handling and deployment package including a horizontally operated rig that may also be operated in a slanted mode. Deepwater completions may be deployed from the vessel via a buoyant horizontal riser (BHR), which may be supported by a submerged buoyant tensioning system (BTS). In this manner, the cost of performing completion or intervention operations may be significantly reduced compared to such operations run from a drilling rig.
摘要翻译: 用于安装深水完井和执行良好干预的方法和装置,可以在不运行完井或执行干预措施的情况下执行其他任务。 用于安装深水完井和进行良好干预的系统可以包括表面管道处理和展开包装,其包括也可以倾斜模式操作的水平操作的钻机。 深水完井可以通过浮动的水平提升管(BHR)从船舶部署,其可以由浸没式浮力张紧系统(BTS)支撑。 以这种方式,与从钻机运行的这种操作相比,执行完成或干预操作的成本可能显着降低。
-