TUNNEL CONSTRUCTION LARGE-SCALE INTEGRATED GEOPHYSICAL ADVANCED DETECTION MODEL TEST DEVICE
    1.
    发明申请
    TUNNEL CONSTRUCTION LARGE-SCALE INTEGRATED GEOPHYSICAL ADVANCED DETECTION MODEL TEST DEVICE 有权
    隧道施工大规模集成地球物理高级检测模型试验装置

    公开(公告)号:US20150338549A1

    公开(公告)日:2015-11-26

    申请号:US14397547

    申请日:2014-01-26

    CPC classification number: G01V99/005 G01V1/30 G01V3/165 G01V3/17 G01V11/00

    Abstract: The present invention discloses a tunnel construction large-scale integrated geophysical advanced detection model test device. The model test device includes a tunnel surrounding rock, a main tunnel model, a model test case, a water-containing geological structure device, a numerical control automated construction device and a main control chamber. The model test device is a large-scale integrated geophysical advanced detection model test device meeting the detection using a seismic wave method, an electromagnetic method and a direct-current electric method. By using the geophysical advanced detection model test device, the geophysical response features of the water-containing geological structure device in front of a tunnel face may be studied, multiple geophysical advanced detection forward and inversion methods for the water-containing geological structure device are verified, and the relationship between some geophysical detection method results and water burst quantity is studied, so as to lay a test foundation for the advanced prediction and water burst quantity prediction of the water-containing geological construction device in actual engineering.

    Abstract translation: 本发明公开了一种隧道建设大型综合地球物理高级检测模型试验装置。 模型试验装置包括岩石隧道,主隧道模型,模型试验箱,含水地质结构装置,数控自动化施工装置和主控室。 模型试验装置是利用地震波法,电磁法和直流电法满足检测的大规模综合地球物理高级检测模型试验装置。 通过使用地球物理高级检测模型试验装置,可以研究隧道前面含水地质构造装置的地球物理响应特征,验证含水地质结构装置的多种地球物理进展检测正向和反演方法 研究了一些地球物理检测方法结果与水爆量之间的关系,为实际工程中含水地质施工装置的先进预测和水爆量预测奠定了考察基础。

Patent Agency Ranking