TUBBING HAVING A THERMOPLASTIC SEALING LAYER
    1.
    发明申请
    TUBBING HAVING A THERMOPLASTIC SEALING LAYER 审中-公开
    具有热塑性密封层的管道

    公开(公告)号:US20140193204A1

    公开(公告)日:2014-07-10

    申请号:US14206519

    申请日:2014-03-12

    IPC分类号: E21D11/38 E21D11/00

    摘要: For a tubbing made of concrete for lining a tunnel, such as a traffic tunnel, the tubbing can have a convexly curved outer surface and a concavely curved inner surface opposite the outer surface. The tubbing can be provided with a thermoplastic sealing layer on the outer surface of the concrete tubbing. The thermoplastic sealing layer can also be arranged on all sides of the outside surfaces facing the outer surface. The tubbing can, for example, have a recess that extends around the outer surface in a frame shape, and the sealing layer engages in the recess.

    摘要翻译: 对于用于衬砌隧道(例如交通隧道)的混凝土制成的桶,桶可以具有凸曲面的外表面和与外表面相对的凹曲的内表面。 所述桶体可在所述混凝土桶的外表面上设置有热塑性密封层。 热塑性密封层也可以布置在面向外表面的外表面的所有侧面上。 所述容器可以例如具有围绕所述外表面以框架形状延伸的凹部,并且所述密封层与所述凹部接合。

    FORMWORK ELEMENT
    2.
    发明申请

    公开(公告)号:US20130279991A1

    公开(公告)日:2013-10-24

    申请号:US13918231

    申请日:2013-06-14

    IPC分类号: E02D31/02

    CPC分类号: E02D31/02 E02D29/16 E02D31/04

    摘要: A method for sealing piles in foundations in the construction field, wherein a hollow-body formwork element is used. The method includes: 1) applying a barrier layer to the foundation; 2) introducing a pile into the foundation, the pile being arranged so as to penetrate the barrier layer; 3) applying a hollow-body formwork element along the central longitudinal axis of the pile, the hollow-body formwork element surrounding the pile; 4) introducing mineral binding agents into the intermediate space between the pile and the hollow-body formwork element; 5) connecting the barrier layer and the hollow-body formwork element. The hollow-body formwork element has on the side facing the pile a contact layer, which includes a composite layer of a porous material and/or a sealant. The hollow-body formwork element can remain as a part of the structure and thus can perform a sealing function.

    摘要翻译: 一种用于在施工现场的地基中密封桩的方法,其中使用中空体模板元件。 该方法包括:1)向基础施加阻挡层; 2)将桩引入基础中,将桩布置成穿过阻挡层; 3)沿着桩的中心纵向轴线施加中空体模板元件,围绕桩的中空体模板元件; 4)将矿物结合剂引入桩和中空体模板元件之间的中间空间; 5)连接阻挡层和中空体模板元件。 中空体模板元件在面向桩的一侧上具有接触层,该接触层包括多孔材料和/或密封剂的复合层。 中空体模板元件可以保持为结构的一部分,从而可以执行密封功能。