公开(公告)号:US11953265B2
公开(公告)日:2024-04-09
申请号:US17279866
申请日:2019-09-04
Applicant: SMS GROUP GMBH
Inventor: Thomas Pasch , Harmen Johannes Oterdoom , Mesut Göcoglu , Ralf Nörthemann
CPC classification number: F27B3/28 , C21C5/527 , F27B3/085 , F27D19/00 , H05B1/023 , C21C2005/5288 , C21C2300/06 , F27D2019/0003
Abstract: A method for operating an electric arc furnace having at least one electrode, the method including the following steps: introducing material that is to be melted in the form of an actual mass flow into the electric arc furnace and feeding electrical energy via at least one electrode into the electric arc furnace in order to melt the introduced material depending on a previously determined, necessary electrical energy input. The necessary electrical energy input into the arc furnace is determined depending on the mass flow input into the furnace.