Systems and methods for filling a proppant silo

    公开(公告)号:US12221299B1

    公开(公告)日:2025-02-11

    申请号:US18584231

    申请日:2024-02-22

    Abstract: A system includes a base configured to be positioned on a ground. The base includes a funnel configured to be positioned under a knife gate. The base also includes a first conveyor positioned under the funnel. The funnel is configured to direct a material from the knife gate onto a middle portion of the first conveyor. The system also includes a derrick having a first end that is coupled to the base. The derrick includes a second conveyor configured to receive the material from the first conveyor and to convey the material upward when the system is in an unfolded state. The derrick also includes a drum motor positioned proximate to an end of the derrick and configured to provide power to the second conveyor. The system also includes a first arm having a first end that is coupled to the end of the derrick.

    Systems and methods for filling a proppant silo

    公开(公告)号:US11858760B1

    公开(公告)日:2024-01-02

    申请号:US18325391

    申请日:2023-05-30

    Abstract: A system includes a base configured to be positioned on a ground. The base includes a first conveyor configured to convey a granular material. The system also includes a derrick coupled to the base. The derrick is configured to be oriented substantially horizontally when the system is in a folded state. The derrick is configured to be oriented substantially vertically when the system is in an unfolded state. The derrick includes a second conveyor configured to receive the granular material from the first conveyor and to convey the granular material. The system also includes a first arm coupled to the derrick. The first arm includes a third conveyor configured to receive the granular material from the second conveyor and to convey the granular material.

Patent Agency Ranking