-
1.
公开(公告)号:US20180100352A1
公开(公告)日:2018-04-12
申请号:US15323104
申请日:2015-06-23
Applicant: SOUTHWEST PETROLEUM UNIVERSITY
Inventor: Wei LI , Hongxiang LEI , Qingyou LIU , Shihong XIAO , Xu SI , Tieshan ZHANG , Qing TU , Xiao TAN , Fanyao JIN , Xingming WANG , Yuan ZHONG , Hang LI , Jianchuan WU , Dengwei LI
IPC: E21B7/06
Abstract: Disclosed is a rotation guidance apparatus belonging to the technical field of oil drilling equipment. An end part of a lower connector (3) has a ball-socketed ball-joint rod (12), and a drill bit (1) is connected to the ball-socketed ball-joint rod (12); several circumferentially and evenly distributed piston holes are provided in a side wall of the lower connector (3), a piston matches each piston hole, and a piston rod (11) connected to the piston is movably connected to the ball-socketed ball-joint rod (12); and a eccentrically-placed valve core (17) is connected to a controller provided in an upper connector (4), a working face of the eccentrically-placed valve core (17) is opposite to the piston holes, and rotation of the eccentrically-placed valve core (17) makes the pistons in the piston holes move to control the rotation guidance of the ball-socketed ball-joint rod (12).
-
公开(公告)号:US20240376820A1
公开(公告)日:2024-11-14
申请号:US18746950
申请日:2024-06-18
Applicant: Southwest Petroleum University
Inventor: Xiandong JIANG , Nutao WANG , Chengyang ZHANG , Hang LI , Min WEI
Abstract: A method for determining well wall collapse of a single well for a fractured-vuggy reservoir is provided. The method includes following steps: S1, treating the single well of the fractured-vuggy reservoir as an isolated reservoir; S2, calculating a water influx rate for the fractured-vuggy reservoir; S3, substituting a formula of the water influx rate into a material balance equation; S4, calculating a change of an oil productivity index without considering the well wall collapse; S5, establishing an optimizing model for obtaining the oil productivity index; S6, calculating the formation pressure at any time in production through step S3; S7, calculating the oil productivity index at any time through the formation pressure, and establishing an optimal objective function; and S8, calculating a difference between the oil productivity index at any time and the theoretically calculated oil productivity index at any time, and determining whether the difference meets an accuracy requirement.
-