METHOD FOR DETERMINING WELL WALL COLLAPSE OF SINGLE WELL FOR FRACTURED-VUGGY RESERVOIR

    公开(公告)号:US20240376820A1

    公开(公告)日:2024-11-14

    申请号:US18746950

    申请日:2024-06-18

    Abstract: A method for determining well wall collapse of a single well for a fractured-vuggy reservoir is provided. The method includes following steps: S1, treating the single well of the fractured-vuggy reservoir as an isolated reservoir; S2, calculating a water influx rate for the fractured-vuggy reservoir; S3, substituting a formula of the water influx rate into a material balance equation; S4, calculating a change of an oil productivity index without considering the well wall collapse; S5, establishing an optimizing model for obtaining the oil productivity index; S6, calculating the formation pressure at any time in production through step S3; S7, calculating the oil productivity index at any time through the formation pressure, and establishing an optimal objective function; and S8, calculating a difference between the oil productivity index at any time and the theoretically calculated oil productivity index at any time, and determining whether the difference meets an accuracy requirement.

Patent Agency Ranking