Abstract:
An object storage system, a migration control device, and a migration control method are provided. The migration control method includes observing a plurality of total target input/output (I/O) throughputs, inferring a plurality of reference I/O throughputs by using a first neural network, observing a plurality of target I/O throughputs with respect to an i-th storage device, determining a target object to be migrated and a target storage device, in which the target object will be stored, by using a second neural network, and generating a command instructing to migrate the target object to the target storage device.
Abstract:
A terminal apparatus included in a contents centric network and a communication method thereof are provided, the communication method including receiving an interest packet regarding a specific content from an external terminal apparatus, adjusting a window size of the interest packet based on at least one of a requesting frequency of the specific content corresponding to the interest packet and a communication status, and after adjusting the window size, transmitting the interest packet to surrounding terminal apparatuses.