MULTILATERAL INTELLIGENT WELL COMPLETION METHODOLOGY AND SYSTEM

    公开(公告)号:US20230066633A1

    公开(公告)日:2023-03-02

    申请号:US17760009

    申请日:2021-02-02

    Abstract: A technique facilitates improving a completion architecture for a multilateral intelligent well completion (IWC). Effectively, a new and enhanced completion design and deployment approach is provided for multilateral IWCs. According to an embodiment, lower completion equipment is initially deployed downhole into a lower lateral borehole and lower section of a primary borehole. An intermediate completion may then be run downhole and into engagement with the lower completion equipment. Subsequently, an upper lateral borehole (or boreholes) may be drilled and completed. After drilling and completing the one or more upper lateral boreholes, an upper completion is deployed downhole and coupled with the intermediate completion in a manner which enables signal communication with downhole sections of the well.

    Hydraulic landing nipple
    3.
    发明授权

    公开(公告)号:US12134944B2

    公开(公告)日:2024-11-05

    申请号:US17422559

    申请日:2020-01-13

    Abstract: A hydraulic landing nipple assembly includes a control line port located at an outer surface of a tubular member having a bore therethrough, an upper seal recess positioned above the control line port, and a lower seal recess positioned below the control line port. The upper seal recess and the lower seal recess each define locations within the bore to receive an upper locking mandrel and a lower locking mandrel of a subsurface safety valve.

    Multilateral intelligent well completion methodology and system

    公开(公告)号:US11959363B2

    公开(公告)日:2024-04-16

    申请号:US17760009

    申请日:2021-02-02

    CPC classification number: E21B41/0035 E21B43/08

    Abstract: A technique facilitates improving a completion architecture for a multilateral intelligent well completion (IWC). Effectively, a new and enhanced completion design and deployment approach is provided for multilateral IWCs. According to an embodiment, lower completion equipment is initially deployed downhole into a lower lateral borehole and lower section of a primary borehole. An intermediate completion may then be run downhole and into engagement with the lower completion equipment. Subsequently, an upper lateral borehole (or boreholes) may be drilled and completed. After drilling and completing the one or more upper lateral boreholes, an upper completion is deployed downhole and coupled with the intermediate completion in a manner which enables signal communication with downhole sections of the well.

    HYDRAULIC LANDING NIPPLE
    8.
    发明申请

    公开(公告)号:US20220098944A1

    公开(公告)日:2022-03-31

    申请号:US17422559

    申请日:2020-01-13

    Abstract: A hydraulic landing nipple assembly includes a control line port located at an outer surface of a tubular member having a bore therethrough, an upper seal recess positioned above the control line port, and a lower seal recess positioned below the control line port. The upper seal recess and the lower seal recess each define locations within the bore to receive an upper locking mandrel and a lower locking mandrel of a subsurface safety valve.

Patent Agency Ranking