Abstract:
A method of treating a subterranean formation via well bore may include introducing a plurality of particles into the subterranean formation via the well bore, each particle having a substrate and a layer of cement on the substrate. The cement may be in a state of suspended hydration and the method may include introducing moisture to the subterranean formation via the well bore. The method may also include allowing the particles and the moisture to contact one another. Contact between the particles and the moisture may cause the cement to move from a state of suspended hydration to a state of secondary hydration.
Abstract:
A method of treating a subterranean formation may include preparing a mortar slurry, injecting the mortar slurry into the subterranean formation at a pressure sufficient to create a fracture in the subterranean formation, allowing the mortar slurry to set, forming a mortar in the fracture, and providing a pulse of pressure sufficient to reopen the fracture and thereby provide cracks in the set mortar. The mortar slurry may be designed to form a pervious mortar, to crack under fracture closure pressure, or both.