公开(公告)号:US10655467B2
公开(公告)日:2020-05-19
申请号:US15869944
申请日:2018-01-12
Applicant: Taiyuan University of Technology
Inventor: Muqin Tian , Chunyu Xu , Jiancheng Song , Wen Chai , Long Zhao
Abstract: A method for implementing a centralized control platform of a hydraulic support on a fully mechanized mining working face in underground coal mines, which is used for safety production in the underground coal mines. A Siemens PLC S7-300, a C8051F020 single chip microcomputer, a PowerBuilder tool, an SQLServer database and a multi-protocol communication platform are selected to form the centralized control platform, wherein the PowerBuilder tool is used as a front-end development platform; the Siemens PLC S7-300 and the C8051F020 single chip microcomputer are used as a real-time control platform; the PLC is connected to an electro-hydraulic control system, and a communication protocol thereof is a TCP/IP MODBUS protocol; the PLC acts as a client; the electro-hydraulic control system acts as a server end; an infrared transmission apparatus is mounted on a coal mining machine; a receiving apparatus is embedded into a support controller of the electro-hydraulic control system; and after receiving infrared information, the support controller transmits the information to an explosion-proof computer of the electro-hydraulic control system. The method may satisfy control functions required by an unattended or nearly unattended working face; can reliably complete various control functions based on operation of an adjacent support; can remotely transmit various pieces of information to a ground monitoring center in real time; and can monitor various failures in coal mining process in real time.
-
公开(公告)号:US10378352B2
公开(公告)日:2019-08-13
申请号:US15752361
申请日:2016-06-01
Applicant: TAIYUAN UNIVERSITY OF TECHNOLOGY
Inventor: Jiancheng Song , Muqin Tian , Chunyu Xu , Lingyan Lin , Jun Guo , Yayun Yu , Zexin Geng
IPC: E21C35/24 , E21F13/06 , G05B19/042 , G05B23/02
Abstract: A method for realizing a centralized control platform for large fully-mechanized coal mining face equipment is provided. In the method, on the basis of a coal cutter system, a hydraulic support system, a coal mining face transportation system, an emulsion pump station system, a mobile transformer substation system and a video monitoring system of the large fully-mechanized coal mining face equipment, real-time monitoring, centralized coordination control and information communication network are realized by a high-speed embedded computer UNO-3072A, a high-speed data acquisition card PCI-1716, a PowerBuilder front-end development platform, an SQLServer database, a Modbus TCP/IP communication protocol and an industrial Ethernet, thereby realizing centralized control over the large underground fully-mechanized coal mining face equipment. Automated production of fully-mechanized coal mining faces is realized.
-