Construction method of nuclear reactor reinforced concrete containment
vessel and diaphragm floor structure of nuclear reactor reinforced
concrete containment vessel
    3.
    发明授权
    Construction method of nuclear reactor reinforced concrete containment vessel and diaphragm floor structure of nuclear reactor reinforced concrete containment vessel 失效
    核反应堆钢筋混凝土遏制容器和隔膜地板结构的核反应堆钢筋混凝土遏制船的施工方法

    公开(公告)号:US5748690A

    公开(公告)日:1998-05-05

    申请号:US614390

    申请日:1996-03-12

    摘要: In a method of construction of a reinforced concrete diaphragm floor of a nuclear reactor reinforced concrete containment vessel, a bottom surface of the diaphragm floor is provided in the form of an iron plate. The iron plate, an iron bar beam portion for supporting the load provided by concrete during a concrete pouring time, and a reinforcing bar member to be buried in the concrete of the diaphragm floor are assembled outside of a building in which the nuclear reactor is to be embodied. The above members are carried using lifting machinery and are set in a permanent receiving member which is provided on both a main body of the nuclear reactor pressure vessel and a steel member serving as a concrete mold frame of an outer wall of the nuclear reactor reinforced concrete vessel. A concrete pouring is carried out in stages so as to form successive layers of concrete during plural pouring times. After a first concrete layer has completed and the strength of the concrete layer has been established after hardening, the second concrete layer is poured on the first layer, which aids in supporting the weight of the poured concrete.

    摘要翻译: 在建造核反应堆钢筋混凝土遏制容器的钢筋混凝土隔膜地板的方法中,隔膜地板的底面以铁板的形式提供。 铁板,用于支撑在混凝土浇注时间期间由混凝土提供的载荷的铁棒梁部分和要埋在隔膜地板的混凝土中的钢筋构件组装在核反应堆所在的建筑物的外部 体现。 上述构件由起重机械承载,并且设置在设置在核反应堆压力容器的主体和作为核反应堆钢筋混凝土的外壁的混凝土模框的钢构件的永久性接收构件中 船只。 混凝土浇注分阶段进行,以便在多次浇注时间内形成连续的混凝土层。 在第一个混凝土层完成后,硬化后建立了混凝土层的强度,将第二个混凝土层倒在第一层上,有助于支撑浇注混凝土的重量。