-
公开(公告)号:US20240060484A1
公开(公告)日:2024-02-22
申请号:US17891551
申请日:2022-08-19
Applicant: Typhon Technology Solutions, LLC
Inventor: Connor Moore Sinclair , Valencia Loyd , Nicholas Fornicola , Lee Morgan
CPC classification number: F04B49/065 , F04B49/02 , F04B47/00 , E21B43/26 , F04B2201/0207 , F04B2205/09 , E21B2200/20
Abstract: Pump maintenance data associated with each of plural components of each of plural frac pumps of each of plural frac pump transports of a frac fleet is accessed. The pump maintenance data includes usage data of plural well completion operations performed by the frac fleet. The usage data indicates actual component life intervals of each of the plural components and corresponding operating conditions. The pump maintenance data is analyzed to generate a maintenance prediction model that is configured to output for each of the plural components, a predicted component life interval as a function of an operating condition. A current operating condition corresponding to a current well completion operation of the frac fleet is accessed. The maintenance prediction model is applied to generate the predicted component life intervals for each of the plurality of components of the frac fleet based on the current operating condition.
-
公开(公告)号:US20240061417A1
公开(公告)日:2024-02-22
申请号:US17891556
申请日:2022-08-19
Applicant: Typhon Technology Solutions, LLC
Inventor: Lee Morgan , Michael Garza-Pena , Connor Moore Sinclair , Matthew James Vahsholtz , Valencia Loyd , Nicholas Fornicola
CPC classification number: G05B23/0283 , G05B23/024 , E21B49/087
Abstract: Well completion design data for completing plural stages of a well completion operation is accessed. Predicted component life intervals for each of a plurality of components of a frac fleet are accessed. Remaining component life intervals for each of the plurality of components of the frac fleet are determined based on the predicted component life intervals. A continuous completion event for the well completion operation is set based on the remaining component life intervals for each of the plurality of components. The continuous completion event includes a continuous pumping block identifying one or more contiguous stages from among the plurality of stages during which the well completion operation is performed with the frac fleet, and a maintenance block identifying one or more of the plurality of frac pumps to be subject to predetermined maintenance operations upon completion of the one or more contiguous stages of the continuous pumping block.
-