-
公开(公告)号:US11763243B2
公开(公告)日:2023-09-19
申请号:US16835546
申请日:2020-03-31
Applicant: YOKOGAWA ELECTRIC CORPORATION
Inventor: Yuta Machida , Ryosuke Kashiwa , Hirotsugu Gotou , Tomoya Hoshino
IPC: G06Q10/067 , G06F30/20 , G06N5/04 , G06Q10/0637 , G06Q50/06 , G06F111/10 , G06Q50/26
CPC classification number: G06Q10/067 , G06F30/20 , G06N5/04 , G06Q10/06375 , G06Q50/06 , G06F2111/10 , G06Q50/26
Abstract: A plant operation support system supports an operation of a plant. The plant operation support system includes a fluctuation prediction device configured to predict a fluctuation of an element which is input to the plant, and a simulation device configured to simulate a behavior of the plant using a fluctuation of the element predicted by the fluctuation prediction device and data which is obtained from the plant.
-
公开(公告)号:US12292730B2
公开(公告)日:2025-05-06
申请号:US17895580
申请日:2022-08-25
Applicant: YOKOGAWA ELECTRIC CORPORATION
Inventor: Ryosuke Kashiwa , Toshiaki Omata , Nobuaki Ema , Yoshitaka Yoshida
IPC: G05B19/418
Abstract: When a worker executes an operation on an actual plant, an information processing device generates a first calculation result obtained by calculating a behavior of the actual plant after execution of the operation using a virtual plant following an operational status of the actual plant and generates each second calculation result obtained by calculating a behavior of the actual plant with respect to each of operation pattern plans corresponding to a state of the actual plant. The information processing device evaluates the operation that is executed by the worker based on the first calculation result and the second calculation result.
-
公开(公告)号:US10768590B2
公开(公告)日:2020-09-08
申请号:US15176543
申请日:2016-06-08
Applicant: YOKOGAWA ELECTRIC CORPORATION
Inventor: Ryosuke Kashiwa , Azusa Takenaka , Toshiaki Omata , Shin Ishimaru , Makoto Nakaya
IPC: G05B17/02
Abstract: A plant operation support device for simulating an operation of a plant based on information obtained from the plant, includes: an operation condition setting part that sets an operation condition of the plant and a timing for applying the operation condition; and a transient state prediction part that predicts a transient state of the plant from a specific time point to the future in a case in which the operation condition of the plant set by the operation condition setting part is applied at the timing.
-
4.
公开(公告)号:US11893869B2
公开(公告)日:2024-02-06
申请号:US17824422
申请日:2022-05-25
Applicant: YOKOGAWA ELECTRIC CORPORATION
Inventor: Ryosuke Kashiwa , Toshiaki Omata , Nobuaki Ema , Yoshitaka Yoshida
IPC: G08B21/02 , G05B19/418
CPC classification number: G08B21/02 , G05B19/41885
Abstract: An information processing device uses models generated under different conditions, and predicts alarms occurring in the case in which each of a plurality of operation patterns, which is virtually generated in relation to the operation of an actual plant by a worker, is implemented with respect to the actual plant. Then, the information processing device sets the degree of reliability of the prediction result regarding each of the plurality of operation patterns. Subsequently, based on the degree of reliability of the prediction result, the information processing device performs display control with respect to the alarms.
-
公开(公告)号:US11353835B2
公开(公告)日:2022-06-07
申请号:US15861181
申请日:2018-01-03
Applicant: YOKOGAWA ELECTRIC CORPORATION
Inventor: Ryousuke Kobayashi , Makoto Nakaya , Ryosuke Kashiwa , Shin Ishimaru , Azusa Takenaka , Naoto Takano
Abstract: Provided is a plant operation support apparatus including a plant simulator, a predictor, and a predicted KPI deriver. The plant simulator simulates a state at a current time or a predetermined time of a plant based on information obtained from the plant, to output an estimated value at the current time or the predetermined time of process data in the plant. The predictor predicts a state at a predetermined future time of the plant based on the estimated value and outputs a predicted value of the process data in the plant. The predicted KPI deriver derives a predicted KPI which is an index for monitoring the state at the future time of a task to be monitored in plant operation based on the predicted value.
-
-
-
-