PREFABRICATED, PRESTRESSED BRIDGE MODULE
    1.
    发明申请

    公开(公告)号:US20180135261A1

    公开(公告)日:2018-05-17

    申请号:US15813423

    申请日:2017-11-15

    申请人: Guy C. Nelson

    发明人: Guy C. Nelson

    IPC分类号: E01D19/12 E01D2/02

    摘要: A method for making a prefabricated, prestressed module includes arranging one or more steel beams atop a supporting formwork element in a direction transverse to the supporting formwork element and arranging one or more precast deck elements across the one or more steel beams to create a substantially continuous surface. The one or more precast deck elements have pockets for receiving connectors that protrude from the one or more steel beams. The method also includes arranging the supporting formwork element to allow the one or more steel beams to bend into a cambered shape to impart compressive stresses to a bottom flange of the one or more steel beams and tension stresses to a top flange of the one or more steel beams and inserting grout into the pockets to hold the cambered shape and to bond the one or more precast deck elements to the connectors and the top flange.

    BRIDGE ASSEMBLY AND METHOD
    2.
    发明申请
    BRIDGE ASSEMBLY AND METHOD 审中-公开
    桥梁装配和方法

    公开(公告)号:US20160340844A1

    公开(公告)日:2016-11-24

    申请号:US14714461

    申请日:2015-05-18

    申请人: Patrick Revenew

    发明人: Patrick Revenew

    IPC分类号: E01D19/12 E01D21/00 E01D2/02

    摘要: A bridge assembly includes a plurality of platform members which may be secured to support beams via individual platform chassis which are configured to allow tool-less attachment bolt heads thereto. A plurality of specially configured clamps are attached to the free ends of the bolts and the clamps are used to secure the platform members to the platform chassis. The platform chassis are each secured to the outer support beams via L-brackets that are mounted between the chassis and support beams. The support beams include flanged channels wherein the heads of a plurality of bolts may be attached without the need for tools. The platform members may be laid in either a parallel or perpendicular orientation with respect to the outer support beams with two different clamp styles being used depending on the orientation selected.

    摘要翻译: 桥组件包括多个平台构件,其可以经由单独的平台底座固定到支撑梁,所述平台构件被构造成允许无工具的安装螺栓头。 多个特殊构造的夹具附接到螺栓的自由端,并且夹具用于将平台构件固定到平台底盘。 平台底盘各自通过安装在底盘和支撑梁之间的L形支架固定到外支撑梁上。 支撑梁包括法兰通道,其中可以连接多个螺栓的头部而不需要工具。 根据所选择的方向,平台构件可以相对于外部支撑梁以平行或垂直取向放置,其中使用两种不同的夹紧方式。

    PRECAST CONCRETE BEAM
    3.
    发明申请
    PRECAST CONCRETE BEAM 有权
    预制混凝土梁

    公开(公告)号:US20160305077A1

    公开(公告)日:2016-10-20

    申请号:US15103829

    申请日:2014-12-10

    摘要: A precast concrete beam including a substantially planar web extending longitudinally between ends of the beam; a pair of flanges formed integrally with the web, each flange extending laterally from an elongate edge of the web and extending longitudinally between the ends of the beam so as to define a structure engaging surface of the beam; and a plurality of diaphragms formed integrally with the web and the flanges, each diaphragm spanning laterally between a side of the web and one of the flanges, wherein the diaphragms are spaced apart along the beam to thereby support the flanges.

    摘要翻译: 一种预制混凝土梁,包括在梁的端部之间纵向延伸的基本上平面的腹板; 一对与腹板一体形成的凸缘,每个凸缘从腹板的细长边缘横向延伸并且在梁的端部之间纵向延伸,以限定梁的结构接合表面; 以及与腹板和凸缘一体形成的多个隔膜,每个隔膜横向跨越腹板的一侧和凸缘中的一个之间,其中隔膜沿着梁间隔开,从而支撑凸缘。

    Continuous CFRP Decked Bulb T Beam Bridges For Accelerated Bridge Construction
    5.
    发明申请
    Continuous CFRP Decked Bulb T Beam Bridges For Accelerated Bridge Construction 有权
    连续CFRP甲板梁梁加速桥梁施工

    公开(公告)号:US20130269125A1

    公开(公告)日:2013-10-17

    申请号:US13858571

    申请日:2013-04-08

    申请人: Nabil F. Grace

    发明人: Nabil F. Grace

    IPC分类号: E01D19/12

    摘要: A pre-stressed concrete bridge using longitudinal load members of a single continuous beam including at least two types of concrete, one of which is ultra-high-performance concrete (UHPC) mix with a compressive strength exceeding 20 ksi and tensile strength exceeding 1.5 ksi in a region proximate to the support structure.

    摘要翻译: 一种预应力混凝土桥梁,其使用包括至少两种类型的混凝土的单个连续梁的纵向承载构件,其中之一是具有超过20ksi的抗压强度和超过1.5ksi的超高性能混凝土(UHPC)混合物 在靠近支撑结构的区域中。

    Upper Structure for Bridge
    6.
    发明申请
    Upper Structure for Bridge 有权
    桥梁上部结构

    公开(公告)号:US20130263392A1

    公开(公告)日:2013-10-10

    申请号:US13877149

    申请日:2011-09-29

    申请人: Man-Yop Han

    发明人: Man-Yop Han

    IPC分类号: E01D19/02

    CPC分类号: E01D19/02 E01D2/02

    摘要: An upper structure for a bridge includes a coping placed on the top of a pier, and girders held by the coping, wherein the coping has girder holding grooves. The girders are installed continuously without using bridge bearings, thereby reducing the construction cost. The coping and the girders behave in an integrated state, thereby realizing improved structural efficiency. The girders are held by being fitted into the grooves, so the coping is not excessively exposed to the outside, thereby realizing a good appearance of the bridge. The girders and the coping are thy-joined together in a prestressed state using prestressed steel strands, so that the strength of the girders and the resistance to a negative bending moment can be increased. Further, the girders and the coping can be integrated with each other without being processed by site work, thereby realizing improved structural efficiency and reducing the construction period.

    摘要翻译: 用于桥梁的上部结构包括放置在码头顶部的应力和通过应力保持的桁架,其中所述应力具有梁保持槽。 大梁连续安装而不使用桥式轴承,从而降低施工成本。 应对和大梁行为一体,从而提高结构效率。 大梁通过嵌入槽中保持,因此不会过度暴露于外部,从而实现了桥梁的良好外观。 在预应力状态下,使用预应力钢绞线将桁架和应力器连接在一起,从而可以提高桁材的强度和抵抗负弯矩的能力。 此外,桁架和应对可以彼此结合,而不必通过现场工作进行处理,从而实现了改进的结构效率并缩短了施工周期。

    Method of providing a parapet wall on a bridge
    7.
    发明授权
    Method of providing a parapet wall on a bridge 失效
    在桥上提供护栏墙的方法

    公开(公告)号:US08448280B2

    公开(公告)日:2013-05-28

    申请号:US13530531

    申请日:2012-06-22

    IPC分类号: E01D21/00

    摘要: A bridge replacement method is disclosed. The bridge includes a deck supported by a pair of abutments, each abutment having wing walls. The deck is removed, footings are cast in holes dug behind each abutment and a pier is provided on each footing. Substantially parallel and coplanar cambered beams are provided. Each beam spans between and is supported by the piers. A brace assembly reinforces the beam camber. On each adjacent pair of beams, precast deck elements are placed, such that each element of said plurality spans the beam pair, to define at least transverse gaps between the elements and put the upper surfaces of the elements in compression in a transverse direction. The gaps are grouted. After grout curing, the brace is adjusted to reduce the beam camber and cause the upper surface of the elements to also be put into compression in a direction parallel to the beams.

    摘要翻译: 披露了一种桥梁更换方法。 桥梁包括由一对基台支撑的甲板,每个基台具有翼壁。 甲板被拆除,脚下被埋在每个基台后方的孔中,每个基脚上都设有码头。 提供基本上平行和共面的弧形梁。 每个梁跨越并且由码头支撑。 支架组件加强了梁的弯度。 在每个相邻的一对梁上,放置预制甲板元件,使得所述多个的每个元件横跨梁对,以至少在元件之间限定横向间隙,并将元件的上表面横向压缩。 差距被灌浆。 在灌浆固化后,调节支柱以减小梁的外倾角,并使元件的上表面也沿与梁平行的方向进入压缩状态。

    BRIDGE CONSTRUCTION AND METHOD OF REPLACING BRIDGES
    9.
    发明申请
    BRIDGE CONSTRUCTION AND METHOD OF REPLACING BRIDGES 失效
    桥梁结构和桥梁替代方法

    公开(公告)号:US20120260439A1

    公开(公告)日:2012-10-18

    申请号:US13530531

    申请日:2012-06-22

    IPC分类号: E01D21/00

    摘要: A bridge replacement method is disclosed. The bridge includes a deck supported by a pair of abutments, each abutment having wing walls. The deck is removed, footings are cast in holes dug behind each abutment and a pier is provided on each footing. Substantially parallel and coplanar cambered beams are provided. Each beam spans between and is supported by the piers. A brace assembly reinforces the beam camber. On each adjacent pair of beams, precast deck elements are placed, such that each element of said plurality spans the beam pair, to define at least transverse gaps between the elements and put the upper surfaces of the elements in compression in a transverse direction. The gaps are grouted. After grout curing, the brace is adjusted to reduce the beam camber and cause the upper surface of the elements to also be put into compression in a direction parallel to the beams.

    摘要翻译: 披露了一种桥梁更换方法。 桥梁包括由一对基台支撑的甲板,每个基台具有翼壁。 甲板被拆除,脚下被埋在每个基台后方的孔中,每个基脚上都设有码头。 提供基本上平行和共面的弧形梁。 每个梁跨越并且由码头支撑。 支架组件加强了梁的弯度。 在每个相邻的一对梁上,放置预制甲板元件,使得所述多个的每个元件横跨梁对,以至少在元件之间限定横向间隙,并将元件的上表面横向压缩。 差距被灌浆。 在灌浆固化后,调节支柱以减小梁的外倾角,并使元件的上表面也沿与梁平行的方向进入压缩状态。

    FORM, SYSTEM AND METHOD FOR FORMING CONCRETE DIAPHRAGMS
    10.
    发明申请
    FORM, SYSTEM AND METHOD FOR FORMING CONCRETE DIAPHRAGMS 有权
    用于形成混凝土膜的形式,系统和方法

    公开(公告)号:US20110271636A1

    公开(公告)日:2011-11-10

    申请号:US12774096

    申请日:2010-05-05

    申请人: NATHAN A. KUREK

    发明人: NATHAN A. KUREK

    IPC分类号: E04G11/08 B28B7/20 E04G11/00

    摘要: A form or a series of forms for forming the bridge diaphragm from concrete material includes one or more bottom walls having an inner surface thereof abutting a bottom surface of the diaphragm. There is at least a pair of side walls upstanding on the inner surface of the bottom wall or walls at a respective longitudinal edge thereof and has an inner surface thereof abutting a respective side surface of the diaphragm. The at least the pair of side walls define each of a generally open top and a generally hollow interior of the form. There is also means for securely attaching each end of the form or series of forms to one of a side surface of at least one of the pair of longitudinal members and an end of another form for forming the diaphragm from the concrete material. Bracing of upper edges is also provided.

    摘要翻译: 用于从混凝土材料形成桥梁隔膜的形式或一系列形式包括一个或多个底壁,其内表面邻接隔膜的底表面。 至少一对侧壁在底壁的内表面上或其壁的相应纵向边缘处直立,并且其内表面邻接隔膜的相应侧表面。 至少一对侧壁限定了形状的大体上敞开的顶部和大致中空的内部。 还存在用于将形式或一系列形式的每个端部的每个端部牢固地附接到一对纵向构件中的至少一个的侧表面中的一个和用于从混凝土材料形成隔膜的另一形式的端部的装置。 还提供了上边缘的支撑。