-
公开(公告)号:US06679482B2
公开(公告)日:2004-01-20
申请号:US09946275
申请日:2001-09-05
申请人: Dwight Allenbaugh
发明人: Dwight Allenbaugh
IPC分类号: E04G2132
CPC分类号: E04G21/3233 , E04G21/3242 , Y10S256/06
摘要: The present invention is an improved construction perimeter guard stanchion. A dual adjustment system performs both coarse and fine adjustments to tightly clamp a pair of jaws at the lower end of the stanchion upon the edge of a floor slab in an elevated, unfinished building structure. A coarse jaw adjustment sleeve formed of a short section of hollow steel tubing is coaxially disposed about an outboard support member in sliding engagement therewith. The coarse adjustment sleeve has one or more perforations therethrough so that a locking pin can be passed through it and through aligned openings in the outboard support member. A fine adjustment screw member is disposed coaxially within a vertical rail support tube and may be rotated by lever arms to move the upper jaw closer to or further from the lower jaw. Adjustment of the fine positioning mechanism is performed by manipulating handles at the top of the vertical rail support tube. A workman installing the stanchion thereby does not have to stoop over to operate a clamp located down near the concrete slab.
摘要翻译: 本发明是一种改进的施工周边防护支柱。 双调节系统执行粗调和精细调整,以在升高的未完成的建筑结构中的地板的边缘上紧紧地夹紧在支柱的下端的一对钳口。 由短的中空钢管形成的粗颚调节套筒与外部支撑构件同轴地设置,与其滑动接合。 粗调套筒具有穿过其中的一个或多个穿孔,使得锁定销可以穿过它并且穿过外侧支撑构件中的对准的开口。 微调螺丝构件同轴地设置在垂直导轨支撑管内,并且可以通过杠杆臂旋转以使上钳口更靠近或更远离下钳口。 精细定位机构的调整是通过在垂直导轨支撑管的顶部操纵手柄来进行的。 因此,安装支柱的工人不必弯腰操作位于混凝土板附近的夹具。