METHODS OF ASSEMBLY OF PREFABRICATED TRUSS CONSTRUCTION MODULES

    公开(公告)号:US20240140693A1

    公开(公告)日:2024-05-02

    申请号:US18409024

    申请日:2024-01-10

    IPC分类号: B65D88/12 B65D90/00 B65G65/30

    摘要: The disclosure provides a method that includes providing or assembling a rectangular horizontal member, joining a vertical member to the rectangular horizontal member such that the vertical member bisects a length of the horizontal member and forms a T-junction at the horizontal member, joining first and second sloped members to the rectangular horizontal member and vertical member such that the first and second sloped members span from a top of the vertical member to opposing ends of the horizontal member, and joining first and second support members such that the first and second support members span from the T-junction between the vertical member and horizontal member to work points on an underside of each of the first and second sloped members. The structure thus formed can be assembled from prefabricated units shipped together in parallel planar orientation in a shipping container to provide a roof truss unit.

    Material application system with vibrating sail plate

    公开(公告)号:US11006587B2

    公开(公告)日:2021-05-18

    申请号:US16555496

    申请日:2019-08-29

    申请人: DHG, Inc.

    摘要: A material application system includes a hopper assembly and a conveyor assembly. The hopper assembly includes an upper portion and a downcomer portion. Bulk material is loaded into the upper portion and passes through the downcomer portion. The downcomer portion may include a sail plate for agitating the bulk material to inhibit the formation of clogs in the bulk material.

    Grain storehouse and grain loading method thereof

    公开(公告)号:US10961064B2

    公开(公告)日:2021-03-30

    申请号:US16693398

    申请日:2019-11-25

    摘要: A grain storehouse includes a granary, a grain loading system, and a grain unloading system. The granary includes multiple storages arranged in a network format. The bottom of each storage is a tapered structure with a tapered surface downward, and the bottom of the tapered structure provides a switchable blanking exit. The grain loading system includes a lattice girder structure, a plurality of conveyors and multiple hoppers. The grain unloading system includes at least one conveyor that is located under the blanking exit. The present invention improves the automaticity and efficiency of grain loading and unloading of the grain storehouse, so that the grain can be transferred quickly.

    Method for Delivery of Proppant to a Frac Site
    10.
    发明申请
    Method for Delivery of Proppant to a Frac Site 审中-公开
    支撑剂运送到压裂部位的方法

    公开(公告)号:US20160159567A1

    公开(公告)日:2016-06-09

    申请号:US15044872

    申请日:2016-02-16

    申请人: SandCan, LLC

    发明人: John M. Sheesley

    摘要: A cargo container is modified to carry a fracing proppant such as sand from a quarry or source to the frac site. Openings are cut in the top and bottom of a cargo container and hydraulically operated sliding doors are placed there under. A hopper module with the walls being inclined to approximately the angle of repose for the proppant is installed inside the cargo container. The hopper module is sealed inside the cargo container so that a proppant enters through the top opening at the quarry and flows out through the bottom opening at the fracing site. Once transported to the frac site, the modified cargo container is lifted, emptied and set aside.

    摘要翻译: 货物容器被修改为将采石场或源头的边缘支撑剂(例如沙子)运送到压裂部位。 开口在货物集装箱的顶部和底部切割,液压操作的滑动门放置在下面。 在货物集装箱内装有一个料斗模块,其中墙壁倾斜至约为支撑剂的休止角。 料斗模块被密封在货物集装箱内,使得支撑剂通过采石场的顶部开口进入,并通过在边缘部位的底部开口流出。 一旦运送到压裂场地,改装的货物集装箱被提起,倒空并放在一边。