METHODS FOR OPERATING WIND TURBINE SYSTEM HAVING DYNAMIC BRAKE
    1.
    发明申请
    METHODS FOR OPERATING WIND TURBINE SYSTEM HAVING DYNAMIC BRAKE 审中-公开
    具有动态制动风力涡轮机系统的操作方法

    公开(公告)号:WO2014194464A1

    公开(公告)日:2014-12-11

    申请号:PCT/CN2013/076688

    申请日:2013-06-04

    IPC分类号: F03D9/00 H02J3/38 H02P9/00

    摘要: Methods for operating a wind turbine system are provided. In one embodiment, a method includes adjusting a threshold direct current (DC) bus voltage for a dynamic brake in a wind turbine power converter above a reference DC bus voltage based on at least one system condition. The method further includes gating the dynamic brake on when an experienced DC bus voltage is equal to or greater than the threshold DC bus voltage, and inputting a dynamic brake condition into a controller when the dynamic brake is gated on. The method further includes determining if a grid fault has occurred, reducing power generation of the wind turbine if no grid fault has occurred, and blocking the power converter if a grid fault has occurred. The method further includes gating the dynamic brake off when the experienced DC bus voltage is less than the threshold DC bus voltage.

    摘要翻译: 提供了用于操作风力涡轮机系统的方法。 在一个实施例中,一种方法包括基于至少一个系统状况,将风力涡轮机功率转换器中的动态制动器的阈值直流(DC)母线电压调整到基准直流母线电压以上。 该方法还包括当有经验的直流母线电压等于或大于阈值直流母线电压时门控动态制动,以及当动态制动器选通时将动态制动条件输入到控制器中。 该方法还包括确定是否发生电网故障,如果没有发生电网故障,则减少风力涡轮机的发电,并且如果发生电网故障则阻塞电力转换器。 该方法还包括当有经验的直流母线电压小于阈值直流母线电压时选通动态制动器。

    DUAL-SAMPLING MAXIMUM POWER POINT TRACKING WITH DYNAMIC POWER LIMITING FOR POWER SYSTEMS

    公开(公告)号:WO2019178795A1

    公开(公告)日:2019-09-26

    申请号:PCT/CN2018/079933

    申请日:2018-03-22

    摘要: A method for operating a PV system (14) that is integrated into a power system (10) connected to a power grid (22) includes determining a voltage operating point for the PV system (14) based on a maximum power point tracking (MPPT) algorithm (102). If an available power output of the PV system (14) can be provided to the power grid (22), the method includes operating the PV system (14) based on the voltage operating point (106). If the maximum available power output of the PV system (14) cannot be provided to the power grid (22), the method includes applying a voltage step to the voltage operating point to drive a power output of the PV system (14) towards an external power constraint (108).And a hybrid power system connected to a power grid is disclosed.

    SYSTEMS AND METHODS FOR OPTIMIZING WIND TURBINE PERFORMANCE DURING NOISE REDUCED OPERATION

    公开(公告)号:WO2023077263A1

    公开(公告)日:2023-05-11

    申请号:PCT/CN2021/128151

    申请日:2021-11-02

    IPC分类号: F03D7/02 F03D17/00 F03D80/50

    摘要: A system for optimizing performance of a wind turbine during noise reduced operation includes a supervisory controller and a converter controller. The converter controller is configured to perform a plurality of operations including operating the wind turbine at a first optimization mode or a second optimization mode. The first optimization mode includes actively adjusting a power output of the wind turbine based on grid parameter (s) so as to maximize energy production of the wind turbine without accelerating consumption of life of component (s) thereof. The second optimization mode includes operating the wind turbine at a maximum power output rating while tracking remaining life of the component (s) based on a plurality of parameters. When the remaining life of the component (s) exceeds a predetermined threshold, the converter controller generates a notification to indicate that a maintenance action is needed.