摘要:
The invention relates to a method for moulding a part (100), comprising the following steps: placing at least one prestressing device in a first element; placing the first element (20, 60) such that it faces a second element (1); prestressing of the at least one prestressing device; introducing ultra-high performance fibre-reinforced concrete (51) into the receiving space; controlling a progressive modification of one of the elements (20); and demoulding the tubular element (20).
摘要:
Method of manufacturing a large-scale shell construction, wherein a form is sprayed with a setting construction material, such as concrete. The method comprises rotating the form about a rotation axis while applying said construction material. Preferably it also comprises suspending the form from above in a point through which the rotation axis runs. Furthermore, the method can comprise floating the form on a body of water.
摘要:
The invention concerns a mould comprising at least two inflatable structures (2, 3) linked to each other by means maintaining in position and shape their moulding surfaces (21, 13, T) so as to define between them an inflated volume wherein the moulding material can be introduced, the demoulding being carried out, after the material has set, by deflating the structure. The invention is applicable in the building industry and public works.
摘要:
A system and a method for molding a part from fiber cement, or fibrocement, slurry are provided. The molding is preferably made by pressure injection of the slurry. The slurry comprises cementitious material, additives, fibers and water. The fibers can include polypropylene, polyethylene, polyacrylic, cellulose, and/or asbestos fibers. First and second molding sections define, at least partially, a chamber. The second molding section comprises at least one evacuating channel. The system includes a slurry inlet communicating with the chamber, for inserting the slurry. A bladder covers the first molding section, the bladder being inflatable for compressing the slurry between the bladder and the second molding section. A filter covers the second molding section and allows water contained in the slurry to pass through while retaining the cementitious material and fibers within the chamber. A pressurized fluid inlet port communicates with at least one conduit for inflating the bladder.
摘要:
Hollowcore apparatus for forming a concrete hollowcore slab, comprises a casting bed 1, side wall elements 2 extending longitudinally of the casting bed 1 for defining sides of a casting mould, at least one non-sacrificial inflatable core former 23, at least one, preferably non-sacrificial sleeve 24 for substantially receiving the core former 23, the core former 23 and the sleeve 24 being interconnected and the in use sleeve being turnable inside out by removal of the core former 23 from the casting bed 1, and at least one holder 57 for preventing or limiting uplift of the in use inflated core former 23 and sleeve 24 relative to the casting bed 1. A method and hollowcore slab are also provided.