摘要:
A lifting arrangement for a construction machine comprises a main arm (3) which is provided with a pivot connector (4) at a proximate end thereof and an equipment connector (5) at a distal end thereof, a main arm support means (6) for pivotably supporting said pivot connector (4) of said main arm (3), wherein said main arm support means (6) is movable in a direction which includes at least a component in the front-rear direction with respect to said frame arrangement. Further a guiding means (7) is provided which is engaged to said main arm (3) at a guided portion (10) of said main arm (3) positioned between said pivot connector (4) and said equipment connector (5).
摘要:
A lift arm (9) is constructed from a first arm (11) and a second arm (12). A pivot joint portion (32) where the first arm (11) is pivoted on a bracket (8)stood at a vehicle side portion substantially corresponds to the rear end of an operation control portion. A rod (15) as a swing motion-limiting member is interposed between the bracket (8) and the second arm (12). An angle of bend formed by the first arm (11) and the second arm (12) is set to be large at a lowered position of the lift arm and small at a lifted position.
摘要:
A lifting arrangement for a construction machine comprises a main arm (3) which is provided with a pivot connector (4) at a proximate end thereof and an equipment connector (5) at a distal end thereof, a main arm support means (6) for pivotably supporting said pivot connector (4) of said main arm (3), wherein said main arm support means (6) is movable in a direction which includes at least a component in the front-rear direction with respect to said frame arrangement. Further a guiding means (7) is provided which is engaged to said main arm (3) at a guided portion (10) of said main arm (3) positioned between said pivot connector (4) and said equipment connector (5).
摘要:
In controlling a work vehicle including a boom supported by a vehicle body and configured to turn, and a bucket supported by a side, away from the vehicle body, of the boom and configured to turn according to an operation of an actuator, an operation amount for raising the boom or a rising speed of the boom, and an operable amount that the actuator is able to operate before the bucket reaches a stop position on the dump side based on the posture of the boom and the posture of the bucket, are obtained, and an operation amount of the actuator for causing the bucket to tilt is changed based on the operation amount for raising the boom or the rising speed of the boom to thereby cause the bucket to tilt according to the operable amount.
摘要:
An installation for shifting won minerals comprises a continuous conveyor in the form of a belt or chain conveyor, a machine frame (2) and a shovel (8) pivotally connected to extension arms (7) which pivot vertically on an oscillating crank (6) which is pivotally connected to the front end of the machine frame (2). The extension arms (7) and the oscillating crank (6) are connected by cylinder-piston units (20, 24) to the front end of the machine frame (2). In order to pour the won minerals into a discharge chute in the region of the front end of the continuous conveyor, the loading shovel (8) pivots about at least one essentially horizontal axis (26, 34). To obtain a compact construction and to improve the loading capacity while reducing the risk of tilting, the support of the cylinder-piston unit (20) for the oscillating crank (6) at the front end of the machine frame is arranged behind the support of the oscillating crank (6) at the front end of the machine frame (2), viewed from the side.
摘要:
A lifting arrangement for a construction machine comprises a main arm (3) which is provided with a pivot connector (4) at a proximate end thereof and an equipment connector (5) at a distal end thereof, a main arm support means (6) for pivotably supporting said pivot connector (4) of said main arm (3), wherein said main arm support means (6) is movable in a direction which includes at least a component in the front-rear direction with respect to said frame arrangement. Further a guiding means (7) is provided which is engaged to said main arm (3) at a guided portion (10) of said main arm (3) positioned between said pivot connector (4) and said equipment connector (5).
摘要:
In controlling a work vehicle including a boom supported by a vehicle body and configured to turn, and a bucket supported by a side, away from the vehicle body, of the boom and configured to turn according to an operation of an actuator, an operation amount for raising the boom or a rising speed of the boom, and an operable amount that the actuator is able to operate before the bucket reaches a stop position on the dump side based on the posture of the boom and the posture of the bucket, are obtained, and an operation amount of the actuator for causing the bucket to tilt is changed based on the operation amount for raising the boom or the rising speed of the boom to thereby cause the bucket to tilt according to the operable amount.
摘要:
A lifting arrangement for a construction machine is provided which includes a main arm (3) which is provided with a pivot connector (4). The pivot connector (4) is pivotably supported on a main arm support means (6). The main arm support means (6) is moveable in a direction which includes at least a component in the front-rear direction with respect to a frame arrangement of a construction machine to which the lifting arrangement can be applied. Based on a control of a main arm actuating element (11) and an auxiliary actuating element (21), a path of an equipment connector (5) upon moving said main arm (3) between a lowered position and a lifted position can be achieved which follows a predetermined path.
摘要:
Un dispositif de transport de minerais exploités comprend un engin de manutention continue formé par un transporteur à chaîne ou à bande, un bâti (2) et une pelle (8) reliée de manière pivotable à des flèches (7) verticalement pivotables sur une bascule (6) reliée de manière pivotable à l'extrémité antérieure du bâti (2). Les flèches (7) et la bascule (6) sont reliées par des ensembles piston-cylindre (20, 24) à l'extrémité antérieure du bâti (2). Afin de rejeter les minerais exploités dans une goulotte de chargement agencée à l'extrémité antérieure de l'engin de manutention continue, la pelle de chargement (8) est montée de manière pivotable autour d'au moins un axe (26, 34) sensiblement horizontal. Afin d'obtenir une structure compacte avec une meilleure capacité de chargement, tout en réduisant les risques de renversement, le support des ensembles piston-cylindre pour la bascule (6) à l'extrémité antérieure du bâti (2) est agencé, vu de côté, derrière le support de la bascule (6) à l'extrémité antérieure du bâti (2).