METHODS AND SYSTEMS FOR ENHANCING CONTROL OF POWER PLANT GENERATING UNITS
    2.
    发明申请
    METHODS AND SYSTEMS FOR ENHANCING CONTROL OF POWER PLANT GENERATING UNITS 有权
    增强发电厂发电单位控制的方法和系统

    公开(公告)号:US20150185716A1

    公开(公告)日:2015-07-02

    申请号:US14587682

    申请日:2014-12-31

    Abstract: A control method for optimizing or enhancing an operation of a power plant that includes thermal generating units for generating electricity. The power plant may include multiple possible operating modes differentiated by characteristics of operating parameters. The method may include tuning a power plant model so to configure a tuned power plant model. The method may further include simulating proposed operating modes of the power plant with the tuned power plant model. The simulating may include a simulation procedure that includes: defining a second operating period; selecting the proposed operating modes from the possible operating modes; with the tuned power plant model, performing a simulation run for each of the proposed operating modes whereby the operation of the power plant during the second operating period is simulated; and obtaining simulation results from each of the simulation runs.

    Abstract translation: 一种用于优化或增强包括发电单元的发电厂的运行的控制方法。 发电厂可以包括通过操作参数的特性区分的多种可能的操作模式。 该方法可以包括调整发电厂模型以配置调谐的发电厂模型。 该方法还可以包括利用调谐的发电厂模型来模拟所提出的发电厂的运行模式。 模拟可以包括模拟过程,其包括:定义第二操作周期; 从可能的操作模式中选择所提出的操作模式; 利用调谐发电厂模型,对所提出的运行模式进行模拟运行,由此模拟在第二运行期间的发电厂的运行; 并从每个模拟运行中获取仿真结果。

    METHODS AND SYSTEMS FOR ENHANCING CONTROL OF POWER PLANT GENERATING UNITS
    3.
    发明申请
    METHODS AND SYSTEMS FOR ENHANCING CONTROL OF POWER PLANT GENERATING UNITS 审中-公开
    增强发电厂发电单位控制的方法和系统

    公开(公告)号:US20150184549A1

    公开(公告)日:2015-07-02

    申请号:US14555161

    申请日:2014-11-26

    Abstract: A control method for optimizing an operation of a power plant fleet. The power plant fleet may include multiple operating configurations differentiated by a manner in which assets are engaged. The method may include the steps of: sensing and collecting measured values of the operating parameters for the operating of each of the assets; tuning asset models so to configure a tuned asset model for each of the assets; simulating proposed operating configurations of the power plant fleet using the tuned asset models; and obtaining simulation results from each of the simulation runs, each of the simulation results including a predicted value for a performance indicator.

    Abstract translation: 一种优化电厂车队运行的控制方法。 发电厂船队可能包括以资产所属方式区分的多种经营配置。 该方法可以包括以下步骤:感测和收集每个资产的操作的操作参数的测量值; 调整资产模型,以便为每个资产配置调整后的资产模型; 使用调整后的资产模型模拟电厂车队的运营配置; 并且从每个模拟运行中获得模拟结果,每个模拟结果包括性能指标的预测值。

Patent Agency Ranking