-
公开(公告)号:US10936493B2
公开(公告)日:2021-03-02
申请号:US16445830
申请日:2019-06-19
Applicant: Hewlett Packard Enterprise Development LP
Inventor: Robert C. Elliott , James A. Fuxa
IPC: G06F12/0831 , G06F12/0815
Abstract: An example memory system may include a central processing unit (CPU) comprising a CPU cache, a storage class memory, a volatile memory and a memory controller. The memory controller is to store, in the storage class memory, a first cache line including first data and a first directory tag corresponding to the first data. The memory controller is to further store, in the storage class memory, a second cache line including second data and a second directory tag corresponding to the second data. The memory controller is to store, in the volatile memory, a third cache line that comprises the first directory tag and the second directory tag, the third cache line excluding the first data and the second data.
-
公开(公告)号:US10175742B2
公开(公告)日:2019-01-08
申请号:US15314733
申请日:2014-09-05
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: Edgar Hance , James A. Fuxa , Justin H. Park , David K. Altobelli , Marc W. Galloway
Abstract: A backup power and load discovery system can include a shared backup power supply controlled by a backup power control module, and a node coupled to the shared backup power supply, wherein the node supports a plurality of loads and includes system firmware to determine a subset of the plurality of loads that are to be protected by the shared backup power supply; and the system firmware to communicate the subset between the node and the shared backup power control module.
-
公开(公告)号:US20170212569A1
公开(公告)日:2017-07-27
申请号:US15328375
申请日:2014-10-31
Applicant: HEWLETT PACKARD ENTERPRISE DEVELOPMENT LP
Inventor: David C. Valdez , Han Wang , James A. Fuxa
Abstract: Example implementations relate to load discovery. For example, a load discovery system can include a shared backup power supply controlled by a backup power control module, and a node coupled to the shared backup power supply, wherein the node supports a plurality of loads, and the shared backup power supply powers the plurality of loads when the node is powered off, and a baseboard management control (BMC) unit coupled to the node, the BMC unit to discover the plurality of loads.
-
-