公开(公告)号:US10113666B2
公开(公告)日:2018-10-30
申请号:US15524577
申请日:2015-11-24
Applicant: ITREC B.V.
Inventor: Joop Roodenburg , Terence Willem August Vehmeijer
Abstract: A marine pipelaying system and method for lowering and/or raising an offshore pipeline and including one or more accessories thereto, includes a pipeline launch device, a pipeline clamp, an accessory connecting device and a controlled load hoisting device. An accessory handling device is provided including an accessory transport track and a cart adapted to engage and support one of the one or more accessories, such that the accessory handling device is adapted to engage said accessory at the engagement position, position the accessory in the pipeline connecting position in the firing line above the pipeline clamp. The accessory can be connected to the pipeline and support and allow displacement of the accessory between the engagement position and the pipeline connection position.
-
公开(公告)号:US09835268B2
公开(公告)日:2017-12-05
申请号:US14990240
申请日:2016-01-07
Applicant: ITREC B.V.
CPC classification number: F16L1/207 , B63B35/03 , F16L1/19 , F16L1/203 , F16L1/205 , F16L1/23 , F16L1/235
Abstract: A marine pipeline installation system for laying an offshore pipeline and/or installing a subsea riser includes a pipeline launch tower, a pipeline guide provided at an elevated position for guiding said pipeline to the pipeline launch trajectory along said tower, one or more tensioners, an abandonment and recovery (A&R) system including at least one A&R cable and associated A&R winch and a sheave arrangement with one or more sheaves supported by the pipeline launch tower at an upper position thereof. An auxiliary trolley is provided which is adapted to support the weight of the launched pipeline and which is movable along a rail in the pipeline launch trajectory when the one or more tensioner frames are in the retracted non-operable position, from a position above the uppermost tensioner to a position below the lowermost tensioner, the rail being supported by the pipeline launch tower.
-
公开(公告)号:US08956078B2
公开(公告)日:2015-02-17
申请号:US14105340
申请日:2013-12-13
Applicant: ITREC B.V.
Abstract: A method for reel-laying pipelines from a vessel includes reel laying a first pipeline by unwinding a first reel, and guiding the pipeline via a guide wheel through a tensioners and a hang off clamp into the sea; closing the hang off clamp to support the first pipeline; connecting an end portion of the first pipeline to a retaining system; replacing the first reel by a second reel; providing a temporary connection between an end portion of the second pipeline and the end portion of the first pipeline; disconnecting the first pipeline from the retaining system; opening the hang off clamp; continuing reel laying by unwinding the second reel; closing the hang off clamp; removing the temporary connection between the first and second pipeline; and connecting the first and second pipeline end to end between the tensioners and the hang off clamp.
Abstract translation: 一种用于从容器卷取管道的方法包括:通过展开第一卷轴来放置第一管道的卷轴,以及经由导轮将管道通过张紧器和悬挂夹具引导到海中; 关闭吊卡以支撑第一条管道; 将第一管道的端部连接到保持系统; 用第二卷轴代替第一卷轴; 在第二管道的端部和第一管道的端部之间提供临时连接; 将第一管道与保持系统断开连接; 打开吊卡; 通过展开第二卷轴继续卷轴; 关闭吊卡; 去除第一和第二管道之间的临时连接; 并且将第一和第二管道端部连接到张紧器和悬挂夹具之间。
-
公开(公告)号:US11939193B2
公开(公告)日:2024-03-26
申请号:US17608114
申请日:2020-05-01
Applicant: ITREC B.V.
Abstract: Providing energy to an energy consuming piece of equipment and/or tool during offshore operations. Use is made of a crane including a substructure, a boom mounted on the substructure, one or more hoist winches and cables, as well as an object suspension device suspended from the boom by the cables. A piece of equipment or tool is suspended from the object suspension device. An energy storage unit is provided on the object suspension device and has an input connector. The boom may be provided with an output connector of an energy charging unit and in a lower supply position of the object suspension device it is disconnected from the input connector of the energy storage unit. The piece of equipment or tool is then run on energy supplied by the energy storage unit. Moving the object suspension device to a charging position thereof by employing the hoist assembly of the crane brings the input connector of the energy storage unit in close proximity of the output connector of the energy charging unit which are then interconnected to charge the energy storage unit from a separate energy source.
-
公开(公告)号:US10648590B2
公开(公告)日:2020-05-12
申请号:US16329135
申请日:2017-08-28
Applicant: ITREC B.V.
Inventor: Jeroen Adrianus Joseph Donkers , Terence Willem August Vehmeijer , Stefan Cornells Van Ruyven , Joop Roodenburg , Wouter Johannes Slob
IPC: F16L1/23
Abstract: A marine pipelaying friction clamp device for frictionally retaining an offshore subsea pipeline to be launched into the sea includes a frame which includes a main frame structure that is adapted to be supported by the pipelaying vessel. The frame supports multiple annular arrays of clamping units adapted to simultaneously engage separate portions of the pipeline. The frame further includes one or more mobile subframes for one or more of said annular arrays of clamping units. Each of said one or more mobile subframes is movably supported by the main frame structure so as to be mobile relative to said main frame structure in said longitudinal direction of the clamp device, and each of said one or more mobile subframes is supported by a spring assembly.
-
16.
公开(公告)号:US10047878B2
公开(公告)日:2018-08-14
申请号:US15512335
申请日:2015-09-17
Applicant: ITREC B.V.
Inventor: Joop Roodenburg , Terence Willem August Vehmeijer , Ronny Lambertus Waltherus Nouwens , Jeroen Adrianus Joseph Donkers
Abstract: A marine pipeline installation vessel and a method are provided for laying an offshore rigid pipeline in the sea, the vessel at least being adapted to carry out the rigid reel lay method. The vessel includes at least one vertical storage reel for the storage of a spooled rigid pipeline. A left and right reel support structure are provided to support the weight of the at least one storage reel. The left and right support structures are embodied to form a pivoting structure allowing an angular adjustment of the horizontal reel axis about a vertical axis to alter the angular position of the at least one storage reel.
-
公开(公告)号:US09856995B2
公开(公告)日:2018-01-02
申请号:US15303986
申请日:2015-04-14
Applicant: ITREC B.V.
Abstract: A tubular installation system includes a J-lay tower structure for lowering and raising a tubular or an accessory along a firing line; a tubulars supply system; an accessory supply system; and a loader system configured for transporting a tubular and an accessory between the horizontal tubular supply position and the firing line, wherein the loader system comprises: a loader device with a base and a boom which is pivotable with respect to the base between a lowered position for gripping a tubular and an accessory in the horizontal accessory supply position, and a raised position for delivering then to the firing line; a line-up tool, wherein the line-up tool is configured to exchange a tubular and an accessory with the loader device and transport a tubular between the loader device and the firing line.
-
公开(公告)号:US12091831B2
公开(公告)日:2024-09-17
申请号:US17762898
申请日:2020-09-23
Applicant: ITREC B.V.
Inventor: Terence Willem August Vehmeijer , Hendrikus Jacobus Weterings , Stefan Cornelis Van Ruyven , Rene Corneille Losiriai Boelens
Abstract: A pile upending and holding system includes a support assembly configured to be mounted on the vessel and to provide compensation for wave-induced motion of the vessel to maintain a predetermined X-Y location of the pile holder independent of said motion, and a pile holder mounted on the support assembly to be tillable about a substantially horizontal tilt axis. The pile holder includes a lower ring and an upper ring, and a pile holder frame supporting the lower ring and upper ring, the upper ring longitudinally spaced from the lower ring. Each of the rings include pile engaging devices distributed about the circumference thereof, each pile engaging device being adapted to engage an exterior of the pile extending through the lower and upper ring. Each of the lower ring and upper ring includes a ring base fixed to the pile holder frame and one or more movable jaws, movable between a closed position for holding and guiding the pile and an opened position for entry of the pile. The pile holder is provided, below the lower ring thereof, with a pile foot end support for engaging a longitudinal end of the pile to limit longitudinal movement thereof.
-
公开(公告)号:US10184588B2
公开(公告)日:2019-01-22
申请号:US15575290
申请日:2016-05-18
Applicant: ITREC B.V.
Inventor: Terence Willem August Vehmeijer , Jeroen Adrianus Joseph Donkers , Joop Roodenburg , Jilles Mattheus De Klerk
Abstract: A tensioner pad assembly is adapted to be mounted on an endless track of a tensioner to frictionally clamp an elongated product supported and moved by the tensioner. The pad assembly includes a carrier member and a pair of gripping members, which gripping members can with their carrier member mating surfaces be mounted in multiple discrete gripping positions on gripping member mating surfaces of the carrier member. The mating surfaces form interlocking structures adapted to transfer a squeeze force from the carrier member to the gripping members. The interlocking structures provided on the carrier member define the multiple discrete gripping positions. The gripping member mating surfaces extend at an angle relative to each other, such that the multiple discrete gripping positions differ in their distance to the base portion as well as in their distance to the imaginary plane of the carrier member.
-
公开(公告)号:US09822906B2
公开(公告)日:2017-11-21
申请号:US15030829
申请日:2014-10-16
Applicant: ITREC B.V.
Inventor: Joop Roodenburg , Terence Willem August Vehmeijer
CPC classification number: F16L1/205 , F16L1/16 , F16L1/207 , F16L1/23 , F16L1/235 , F16L3/012 , F16L3/1218 , F16L3/1222
Abstract: A method is provided for installing a pipeline on the seabed from a marine pipelaying vessel, including initiation, pipelaying, and abandonment of the pipeline. An embodiment of the abandonment of the pipeline includes halting pipelaying and engaging a hang-off clamp with the pipeline at a position below one or more tensioners, transferring the weight onto the hang-off clamp and holding the seagoing pipeline in the firing line, severing the pipeline, connecting the initiation cable to the lower end of the pipeline held by the one or more tensioners, transferring pipeline tension onto the initiation cable, releasing the one or more tensioners, so that a section of the pipeline is held in the firing line between the pipeline diverter and the initiation cable, vacating the firing line by at least displacing both the pipeline diverter and the initiation cable sheave and thereby displacing said section of the pipeline from the firing line, arranging the A&R cable in the firing line, connecting the A&R cable to the upper end of the seagoing pipeline held in the firing line, releasing the hang-off clamp, and operating the A&R winch and thereby lowering the pipeline onto the seabed.
-
-
-
-
-
-
-
-
-