公开(公告)号:US20230178985A1
公开(公告)日:2023-06-08
申请号:US18101247
申请日:2023-01-25
申请人: 8ME NOVA, LLC
发明人: Leigh Zanone , Thomas Buttgenbach , Lukas Hansen , Philippe Garneau-Halliday , Emily Arnold , Stephanie Perry , Julia Perrier
IPC分类号: H02J3/00 , H02S10/20 , H02S40/38 , G06Q10/04 , G06Q50/06 , H02S50/00 , H02J3/32 , G05B19/042 , H02J3/38
CPC分类号: H02J3/007 , H02S10/20 , H02S40/38 , G06Q10/04 , G06Q50/06 , H02J3/004 , H02S50/00 , H02J3/32 , G05B19/042 , H02J3/381 , H02J2300/24 , H02J2300/28 , G05B13/02
摘要: Methods for implementing power delivery transactions between a buyer and a seller of electrical energy supplied to an electrical grid by an integrated renewable energy source (RES) and energy storage system (ESS) of a RES-ESS facility are provided. Estimated total potential output of the RES is compared to a point of grid interconnect (POGI) limit to identify potential RES overgeneration, and the buyer is charged if potential RES overgeneration is less than potential overgeneration during one or more retrospective time windows. The method provides a basis for the RES-ESS facility owner to be paid for an estimated amount of energy that did not get stored as a result of a grid operator not fully discharging an ESS prior to the start of a new day.
-
公开(公告)号:US11621566B1
公开(公告)日:2023-04-04
申请号:US17960338
申请日:2022-10-05
申请人: 8ME NOVA, LLC
发明人: Thomas Buttgenbach
IPC分类号: H02J3/38 , H02J3/32 , G05B19/042 , H02J3/00
摘要: An REPP may include a renewable energy source (RES), a first meter associated with a first load, a second meter associated with a second load, a first ESS electrically coupled to the RES and the first meter, a second ESS electrically coupled to the RES and the first meter through a switch, and a controller configured to set a first charge/discharge for the first ESS and a second charge/discharge for the second ESS such that the REPP delivers power to the first load longer than the RES produces power, in response to a trigger condition, actuate the switch such that the second ESS is electrically coupled to the second meter, and set a fourth charge/discharge for the second ESS such that the second ESS maintains a portion of its charge in reserve for the second load.
-
公开(公告)号:US11604499B1
公开(公告)日:2023-03-14
申请号:US17945569
申请日:2022-09-15
申请人: 8ME NOVA, LLC
发明人: Lukas Hansen , Nadim Kanan
IPC分类号: G06F1/20 , G06F1/3212 , G06F1/16
摘要: The present disclosure provides systems and methods for managing a temperature of a battery energy storage system (“BESS”). A method may comprise obtaining a charge/discharge schedule for a battery energy storage system (BESS) for a first time period; identifying, from the charge/discharge schedule, a charge or discharge time period of the BESS within the first time period; calculating a beginning time of a temperature control time period in which equipment operates to control a temperature of the BESS to reach a target temperature by a beginning time of the charge or discharge time period; and controlling the equipment operating to control the temperature of the BESS for the temperature control time period such that the temperature of the BESS reaches the target temperature by the beginning time of the charge or discharge time period.
-
公开(公告)号:US11482864B1
公开(公告)日:2022-10-25
申请号:US17857522
申请日:2022-07-05
申请人: 8ME NOVA, LLC
发明人: Nadim Kanan , Gautham Ramesh , Lukas Mercer Hansen
摘要: An illustrative embodiment disclosed herein is method for power distribution optimization. In some embodiments, the method includes determining an efficiency for each power block of a plurality of power blocks of a power distribution optimization system, determining a characteristic for each power block, determining a power to provide, selecting a first percentage of the power that a first power block is to provide and a second percentage of the power that a second power block is to provide at least based on the efficiency for each power block, the characteristic for each power block, and the power to provide, wherein the first percentage of the power is greater than the second percentage of the power, and sending a dispatch command to cause the first power block to provide the first percentage of the power and the second power block to provide the second percentage of the power.
-
公开(公告)号:US11481010B1
公开(公告)日:2022-10-25
申请号:US17853652
申请日:2022-06-29
申请人: 8ME NOVA, LLC
发明人: Lukas Hansen , Nadim Kanan
IPC分类号: G06F1/20 , G06F1/3212 , G06F1/16
摘要: The present disclosure provides systems and methods for managing a temperature of a battery energy storage system (“BESS”). A method may comprise obtaining a charge/discharge schedule for a battery energy storage system (BESS) for a first time period; identifying, from the charge/discharge schedule, a charge or discharge time period of the BESS within the first time period; calculating a beginning time of a temperature control time period in which equipment operates to control a temperature of the BESS to reach a target temperature by a beginning time of the charge or discharge time period; and controlling the equipment operating to control the temperature of the BESS for the temperature control time period such that the temperature of the BESS reaches the target temperature by the beginning time of the charge or discharge time period.
-
公开(公告)号:US20240353805A1
公开(公告)日:2024-10-24
申请号:US18374915
申请日:2023-09-29
申请人: 8ME NOVA, LLC
CPC分类号: G05B13/04 , H02J3/003 , H02J3/32 , H02J7/0048 , H02J2300/20
摘要: A system for controlling power distribution between a renewable energy source (RES) that generates electrical power, a power grid, an energy storage system (ESS) coupled to and configured to store electrical power from the RES and the power grid, and a behind-the-meter (BTM) load coupled to and configured to receive electrical power from the RES, the ESS, and the power grid includes a controller. The controller includes a processor and a non-transitory computer readable storage medium comprising instructions stored thereon that, upon execution by the processor, cause the controller to determine a prioritization mode and control the flow of electrical power in the system based on the prioritization mode.
-
公开(公告)号:US12061451B2
公开(公告)日:2024-08-13
申请号:US17683864
申请日:2022-03-01
申请人: 8ME NOVA, LLC
CPC分类号: G05B17/02 , H02J3/004 , H02J3/32 , H02J3/381 , H02J2300/24 , H02J2300/28
摘要: The present disclosure describes a method of operating a power plant, comprising: obtaining an energy production forecast for a forecast period; generating a plurality of simulation results associated with simulated operation of the power plant for the forecast period, wherein the plurality of simulation results are generated by simulating operation of the power plant using a plurality of control algorithms; assigning a score to each of the plurality of control algorithms based on the generated plurality of simulation results; selecting a control algorithm from the plurality of control algorithms for the forecast period based on the assigned score for the control algorithm; and operating the power plant in accordance with the control algorithm for a duration of the forecast period.
-
公开(公告)号:US11962159B1
公开(公告)日:2024-04-16
申请号:US18120549
申请日:2023-03-13
申请人: 8me Nova, LLC
发明人: Thomas Buttgenbach
IPC分类号: H02J3/38 , G05B15/02 , G05B19/042 , H02J3/00 , H02J3/32
CPC分类号: H02J3/381 , G05B15/02 , G05B19/042 , H02J3/003 , H02J3/32 , G05B2219/2639 , H02J2300/22
摘要: An REPP may include a renewable energy source (RES), a first meter associated with a first load, a second meter associated with a second load, a first ESS electrically coupled to the RES and the first meter, a second ESS electrically coupled to the RES and the first meter through a switch, and a controller configured to set a first charge/discharge for the first ESS and a second charge/discharge for the second ESS such that the REPP delivers power to the first load longer than the RES produces power, in response to a trigger condition, actuate the switch such that the second ESS is electrically coupled to the second meter, and set a fourth charge/discharge for the second ESS such that the second ESS maintains a portion of its charge in reserve for the second load.
-
19.
公开(公告)号:US11923682B1
公开(公告)日:2024-03-05
申请号:US18467988
申请日:2023-09-15
申请人: 8ME NOVA, LLC
发明人: Nadim Kanan
CPC分类号: H02J3/0075 , H02J3/32 , H02J3/381 , H02J2203/10 , H02J2300/20
摘要: The present disclosure describes a system that includes a behind-the-meter load, a switching system, and a controller. The controller can be configured to receive, from the REPP controller of each of the plurality of REPPs, energy data regarding available energy of the REPP; determine first energy data received from a first REPP controller of a first REPP of the plurality of REPPs satisfies a condition; and responsive to the determination, adjust a switching position of the switching system to a first switching position to enable the first REPP to provide energy to the behind-the-meter load.
-
公开(公告)号:US11848560B2
公开(公告)日:2023-12-19
申请号:US18119067
申请日:2023-03-08
申请人: 8me Nova, LLC
发明人: Thomas Buttgenbach
CPC分类号: H02J3/381 , H02J3/004 , H02J2203/10 , H02J2300/22 , H02J2300/28 , H02J2300/40
摘要: A method described delivers power to a first load and a second load from networked power plants. The method may include receiving a power delivery profile for the first load, receiving a power delivery profile for a second load, determining a power output capability of a first renewable energy power plant (REPP), and determining a power output capability of a second REPP. The method may also include setting a power output for the first REPP and a power output for the second REPP based on the power delivery profile for the first and second loads and the power output capabilities of the first and second REPPs. The method may also include allocating a combined power output of the first and second REPPs to the first and second loads and delivering the allocated combined power output to the first and second loads.
-
-
-
-
-
-
-
-
-