-
公开(公告)号:US11144020B2
公开(公告)日:2021-10-12
申请号:US16692346
申请日:2019-11-22
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Michael J. Wenzel , John H. Burroughs
IPC: G05B17/02
Abstract: A method for operating equipment according to sequence of operation using geometric models including obtaining a first geometric model for a first set of equipment and a second geometric model for a second set of equipment, the first set of equipment and the second set of equipment defined by the sequence of operation for the equipment, locating, on the first geometric model, a first nearest operating point based on a desired operating point, generating a first modified geometric model by removing one or more operating points that do not satisfy the first nearest operating point, generating a merged geometric model by merging the first modified geometric model with the second geometric model, locating a second nearest operating point based on a modified desired operating point, and operating the equipment in accordance with the first nearest operating point and the second nearest operating point.
-
公开(公告)号:US11099530B2
公开(公告)日:2021-08-24
申请号:US16549931
申请日:2019-08-23
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , John H. Burroughs , Michael J. Wenzel
Abstract: A method for operating a subplant included in a central plant includes obtaining instruction-based equipment models associated with devices included in the subplant and comprises operating points that define an operation of the devices, generating, for each instruction-based equipment models, a geometric equipment model using the operating points from a particular instruction-based equipment model, the geometric equipment model defining at least one operating domain associated with the particular device, merging geometric equipment models to form a geometric subplant model, the geometric subplant model defining an operation of the subplant comprising devices associated with the geometric equipment models, receiving a desired operating point comprising a load value, determining, relative to the desired operating point, a nearest operating point on the geometric subplant model, setting the nearest operating point on the geometric subplant model as an actual operating point, and operating the subplant at the actual operating point for the subplant.
-
公开(公告)号:US10955800B2
公开(公告)日:2021-03-23
申请号:US16415170
申请日:2019-05-17
Applicant: Johnson Controls Technology Company
Inventor: John H. Burroughs , Andrew J. Przybylski , Michael J. Wenzel , Matthew J. Ellis
IPC: G05B13/04 , F24F11/49 , H04L12/28 , G05B19/418 , G05B15/02
Abstract: Granular assets of a building are identified. Each granular asset represents one or more devices of that operate to produce, consume, or store resources in the building. General assets are defined by grouping the granular assets into groups. A non-granular optimization is performed to determine a non-granular allocation of the resources among the general assets. Non-granular allocation defines an amount of each of the resources consumed, produced, or stored by each of the general assets at each time step in a time period. A granular optimization is performed for each general asset to determine a granular allocation of the resources among the granular assets. The granular allocation defines an amount of each resource consumed, produced, or stored by the granular assets at each time step in the time period. The equipment of the building are operated to consume, produce, or store the amount of each resource defined by granular allocation.
-
公开(公告)号:US20200241491A1
公开(公告)日:2020-07-30
申请号:US16775966
申请日:2020-01-29
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Michael J. Wenzel , John H. Burroughs , Matthew J. Ellis
Abstract: A method for controlling production of one or more refined resources by an energy provider includes predicting a demand for the refined resources by one or more consumers of the refined resources as a function of an incentive offered by the energy provider. The method further includes performing an optimization of an objective function subject to a constraint based on the predicted demand for the refined resources to determine an amount of the refined resources for the energy provider to produce and a value of the incentive at multiple times within a time period. The method also includes providing setpoints for equipment of the energy provider that cause the equipment to produce the amount of the refined resources determined by performing the optimization.
-
25.
公开(公告)号:US20180260101A1
公开(公告)日:2018-09-13
申请号:US15896745
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Todd Schluechtermann , John H. Burroughs , Jon T. Mueller , Michael J. Wenzel , Matthew J. Ellis
IPC: G06F3/0484 , H04L12/28 , G06F3/0481
Abstract: A building management system for generating a building model for a building and operating building equipment of the building based on the building model. The system includes a processing circuit configured to receive a context, wherein the context includes metadata defining the building model for the building and generate a building model editor interface for viewing and editing the received context, wherein the building model interface includes building elements for the building model, wherein the building elements are based on the received context and represent the building equipment. The processing circuit is configured to receive user edits of the context via the building model interface, wherein the user edits include edits to the building elements, generate an updated context based on the user edits of the context, and deploy the updated context to control environmental conditions of the building with the building equipment based on the updated context.
-
公开(公告)号:US12270561B2
公开(公告)日:2025-04-08
申请号:US16513054
申请日:2019-07-16
Applicant: Johnson Controls Technology Company
Inventor: Matthew J. Ellis , Mohammad N. Elbsat , Anas W. I. Alanqar , Michael J. Wenzel , John H. Burroughs
IPC: G05B13/04 , F24F11/47 , F24F11/54 , F24F11/64 , F24F11/65 , G05B13/02 , G06F17/18 , G06Q50/163 , F24F110/10 , F24F110/20 , F24F110/50 , F24F140/50
Abstract: A controller for performing automated system identification. The controller includes processors and non-transitory computer-readable media storing instructions that, when executed by the processors, cause the processors to perform operations including generating a predictive model to predict system dynamics of a space of a building based on environmental condition inputs and including performing an optimization of a cost function of operating building equipment over a time duration to determine a setpoint for the building equipment. The optimization is performed based on the predictive model. The operations include operating the building equipment based on the setpoint to affect a variable state or condition of the space and include monitoring prediction error metrics over time. The operations include, in response to detecting one of the prediction error metrics exceeds a threshold value, updating the predictive model.
-
公开(公告)号:US11675320B2
公开(公告)日:2023-06-13
申请号:US17205215
申请日:2021-03-18
Applicant: Johnson Controls Technology Company
Inventor: John H. Burroughs , Andrew J. Przybylski , Michael J. Wenzel , Matthew J. Ellis
IPC: G05B13/04 , F24F11/49 , H04L12/28 , G05B19/418 , G05B15/02
CPC classification number: G05B13/041 , F24F11/49 , G05B13/04 , G05B15/02 , G05B19/418 , H04L12/28
Abstract: A method for controlling equipment includes grouping a plurality of granular assets to form one or more general assets and generating models of the general assets based on the granular assets that form the general assets. Each model corresponds to a general asset and defines a relationship between resources produced by the general asset and resources consumed by the general asset. The method includes performing a first control process using the models of the general assets to determine a first allocation of resources among the general assets. The first allocation defines amounts of the resources to be consumed, produced, or stored by each of the general assets. The method includes operating the equipment to consume, produce, or store the resources in accordance with the first allocation.
-
公开(公告)号:US11416796B2
公开(公告)日:2022-08-16
申请号:US16860781
申请日:2020-04-28
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Michael J. Wenzel , John H. Burroughs
Abstract: A method for controlling an energy production and distribution system includes identifying sources that supply input resources, subplants that produce output resources using the input resources, and sinks that consume the output resources. The method includes obtaining a cost function including a cost of producing the output resources and generating a transit time constraint that requires the input resources be sent from the sources to the subplants at a first departure time that occurs before a first arrival time at which the input resources are predicted to be used by the subplants. The method includes solving an optimization problem to determine an amount of the output resources to produce at each of multiple time steps within a time period. Solving the optimization problem includes performing an optimization of the cost function subject to the transit time constraint.
-
公开(公告)号:US11408626B2
公开(公告)日:2022-08-09
申请号:US16737579
申请日:2020-01-08
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Graeme Willmott , John H. Burroughs
IPC: F24F11/46 , F24F11/64 , F24F11/65 , G05B15/02 , F24F140/60 , F24F140/50 , H04L12/28
Abstract: A controller for a plurality of heating, ventilation, or air conditioning (HVAC) devices includes a processing circuit that includes one or more processors and memory. The controller detects a change in condition that affects an operating status of a first HVAC device of the plurality of HVAC devices. The controller uses schematic relationships between the plurality of HVAC devices to determine a reduced subset of the plurality of HVAC devices for which operating parameters are to be generated based on the operating status of the first HVAC device. The controller generates operating parameters for the reduced subset of the plurality of HVAC devices and operates the plurality of HVAC devices using the operating parameters.
-
公开(公告)号:US20210055702A1
公开(公告)日:2021-02-25
申请号:US16692346
申请日:2019-11-22
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Michael J. Wenzel , John H. Burroughs
IPC: G05B17/02
Abstract: A method for operating equipment according to sequence of operation using geometric models including obtaining a first geometric model for a first set of equipment and a second geometric model for a second set of equipment, the first set of equipment and the second set of equipment defined by the sequence of operation for the equipment, locating, on the first geometric model, a first nearest operating point based on a desired operating point, generating a first modified geometric model by removing one or more operating points that do not satisfy the first nearest operating point, generating a merged geometric model by merging the first modified geometric model with the second geometric model, locating a second nearest operating point based on a modified desired operating point, and operating the equipment in accordance with the first nearest operating point and the second nearest operating point.
-
-
-
-
-
-
-
-
-