-
公开(公告)号:US20180259949A1
公开(公告)日:2018-09-13
申请号:US15896675
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Jon T. Mueller , Todd Schluechtermann
IPC: G05B19/418 , H04L12/28
CPC classification number: F24F11/52 , F24F11/32 , F24F11/47 , F24F11/88 , G05B15/02 , G05B19/0426 , G05B19/41885 , G05B2219/2614 , G05B2219/2642 , G06F3/04817 , G06F3/0484 , G06F3/04842 , G06F3/04847 , G06F8/20 , G06F8/34 , G06F8/35 , G06F8/45 , G06F8/60 , G06F9/28 , G06F9/4494 , G06F9/451 , G06F9/45512 , G06F9/5016 , G06F9/505 , G06F9/5066 , G06F2209/522 , G06F2212/1044 , H04L12/2803 , H04L12/2809 , H04L12/2812 , H04L12/2816 , H04L12/2818 , H04L12/2823 , H04L12/2825 , H04L12/283 , H04L12/2834 , H04L41/22 , H04L67/10 , H04L67/12 , H04L67/125 , H04L67/327 , H04L2012/285 , Y02D10/22 , Y02D10/36
Abstract: A method for verifying and running a script for a building management system of a building includes receiving, by the building management system, the script, wherein the script indicates one or more operations to be performed with one or more data points of a data model of the building, determining, by the building management system, whether there is unit cohesion within the received script, wherein the unit cohesion indicates that a result value of executing the script with the one or more data points include units that match desired units, and determining, by the building management system, the result value by executing the script with the one or more data points in response to determining that there is unit cohesion.
-
公开(公告)号:US20180259927A1
公开(公告)日:2018-09-13
申请号:US15896726
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Todd Schluechtermann
IPC: G05B19/042 , G06F3/0484 , H04L12/28 , G06F9/451
CPC classification number: F24F11/52 , F24F11/32 , F24F11/47 , F24F11/88 , G05B15/02 , G05B19/0426 , G05B19/41885 , G05B2219/2614 , G05B2219/2642 , G06F3/04817 , G06F3/0484 , G06F3/04842 , G06F3/04847 , G06F8/20 , G06F8/34 , G06F8/35 , G06F8/45 , G06F8/60 , G06F9/28 , G06F9/4494 , G06F9/451 , G06F9/45512 , G06F9/5016 , G06F9/505 , G06F9/5066 , G06F2209/522 , G06F2212/1044 , H04L12/2803 , H04L12/2809 , H04L12/2812 , H04L12/2816 , H04L12/2818 , H04L12/2823 , H04L12/2825 , H04L12/283 , H04L12/2834 , H04L41/22 , H04L67/10 , H04L67/12 , H04L67/125 , H04L67/327 , H04L2012/285 , Y02D10/22 , Y02D10/36
Abstract: A method for generating and updating a live dashboard of a building management system for a building includes generating a dashboard designer interface and causing the dashboard designer interface to be displayed on a user device of a user, receiving a graphic element from the user, wherein the graphic file supports animation and user interaction, generating a widget by binding the graphic element received from the user to a widget of the live dashboard, binding a data point to the widget based on a user selection via the dashboard designer interface, wherein the data point being a data point of building equipment of the building, receiving a value for the data point from the building equipment, and displaying the widget in the live dashboard, the widget including an indication of the value for the data point.
-
公开(公告)号:US11226126B2
公开(公告)日:2022-01-18
申请号:US15896726
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Todd Schluechtermann
IPC: G06F3/048 , F24F11/52 , F24F11/32 , F24F11/88 , H04L12/28 , G06F8/41 , G05B15/02 , G06F9/50 , F24F11/47 , G06F8/34 , G06F9/455 , G06F8/60 , G06F8/35 , G06F8/20 , H04L29/06 , H04L29/08 , G06F3/0481 , G06F3/0484 , G06F9/28 , G06F9/451 , G05B19/042 , G05B19/418 , G06F9/448 , H04L12/24 , G06F9/46
Abstract: A method for generating and updating a live dashboard of a building management system for a building includes generating a dashboard designer interface and causing the dashboard designer interface to be displayed on a user device of a user, receiving a graphic element from the user, wherein the graphic file supports animation and user interaction, generating a widget by binding the graphic element received from the user to a widget of the live dashboard, binding a data point to the widget based on a user selection via the dashboard designer interface, wherein the data point being a data point of building equipment of the building, receiving a value for the data point from the building equipment, and displaying the widget in the live dashboard, the widget including an indication of the value for the data point.
-
4.
公开(公告)号:US20180260101A1
公开(公告)日:2018-09-13
申请号:US15896745
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Todd Schluechtermann , John H. Burroughs , Jon T. Mueller , Michael J. Wenzel , Matthew J. Ellis
IPC: G06F3/0484 , H04L12/28 , G06F3/0481
Abstract: A building management system for generating a building model for a building and operating building equipment of the building based on the building model. The system includes a processing circuit configured to receive a context, wherein the context includes metadata defining the building model for the building and generate a building model editor interface for viewing and editing the received context, wherein the building model interface includes building elements for the building model, wherein the building elements are based on the received context and represent the building equipment. The processing circuit is configured to receive user edits of the context via the building model interface, wherein the user edits include edits to the building elements, generate an updated context based on the user edits of the context, and deploy the updated context to control environmental conditions of the building with the building equipment based on the updated context.
-
5.
公开(公告)号:US10767885B2
公开(公告)日:2020-09-08
申请号:US15896745
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Todd Schluechtermann , John H. Burroughs , Jon T. Mueller , Michael J. Wenzel , Matthew J. Ellis
IPC: G06F3/0481 , G06F3/0484 , H04L12/28 , F24F11/52 , F24F11/32 , F24F11/88 , G06F8/41 , G05B15/02 , G06F9/50 , F24F11/47 , G06F8/34 , G06F9/455 , G06F8/60 , G06F8/35 , G06F8/20 , G06F9/28 , H04L29/08 , G06F9/451 , G05B19/042 , G05B19/418 , G06F9/448 , H04L12/24
Abstract: A building management system for generating a building model for a building and operating building equipment of the building based on the building model. The system includes a processing circuit configured to receive a context, wherein the context includes metadata defining the building model for the building and generate a building model editor interface for viewing and editing the received context, wherein the building model interface includes building elements for the building model, wherein the building elements are based on the received context and represent the building equipment. The processing circuit is configured to receive user edits of the context via the building model interface, wherein the user edits include edits to the building elements, generate an updated context based on the user edits of the context, and deploy the updated context to control environmental conditions of the building with the building equipment based on the updated context.
-
公开(公告)号:US10648688B2
公开(公告)日:2020-05-12
申请号:US15896675
申请日:2018-02-14
Applicant: Johnson Controls Technology Company
Inventor: Andrew J. Przybylski , Jon T. Mueller , Todd Schluechtermann
IPC: G05B19/418 , H04L12/28 , F24F11/52 , F24F11/32 , F24F11/88 , G06F8/41 , G05B15/02 , G06F9/50 , F24F11/47 , G06F8/34 , G06F9/455 , G06F8/60 , G06F8/35 , G06F8/20 , G06F3/0481 , G06F3/0484 , G06F9/28 , H04L29/08 , G06F9/451 , G05B19/042 , G06F9/448 , H04L12/24
Abstract: A method for verifying and running a script for a building management system of a building includes receiving, by the building management system, the script, wherein the script indicates one or more operations to be performed with one or more data points of a data model of the building, determining, by the building management system, whether there is unit cohesion within the received script, wherein the unit cohesion indicates that a result value of executing the script with the one or more data points include units that match desired units, and determining, by the building management system, the result value by executing the script with the one or more data points in response to determining that there is unit cohesion.
-
-
-
-
-