摘要:
In a method for leaching gold from copper sulfides, the sulfide ores are first subjected to leaching of copper, thereby producing a leaching residue having 7.9% or less of the copper content. This leaching residue is mixed with a leach liquor, which contains the chloride ion and ferric ion and has 1.9 or less of pH.Gold and copper can be effectively leached from the copper sulfide ores. Ordinarily used oxidizing reagents such as hydrogen peroxide or nitric acid are not used. The gold, copper and iron can, therefore, be leached in a single process and by using an identical leaching liquor. The rate of gold leaching reaction can be enhanced by the co-presence of either copper or bromide ion or both together with the chloride and iron ion.
摘要:
A method of obtaining copper from sulfide ore including copper (hereinafter referred to as feedstock) includes: providing feedstock into acid solution, the acid solution including chloride and bromide of one of alkali metal and alkali earth metal, and one of chloride of copper and iron and bromide of copper and iron; leaching monovalent copper and divalent copper from the feedstock with use of oxidizing power of at least one of iron ion and copper ion in the acid solution, with air being blown into the acid solution under an atmospheric pressure at a temperature less than a boiling point of the acid solution; solid-liquid separating the acid solution after the leaching; blowing air into the solution after the solid-liquid separation; oxidizing copper in the solution; coprecipitating iron and impurity that are leached into the acid solution from the feedstock; extracting copper from the solution after the oxidizing from which deposition including the coprecipitate is separated; obtaining the extracted copper into sulfuric acid solution as copper sulfate; obtaining copper from the copper sulfate; and recycling hydrochloric acid generated in the extracting in another copper leaching.
摘要:
A small-size scroll compressor is provided wherein strength of key portions has been enhanced without increasing ring width, ring diameter or key widths of an Oldham's ring. In the Oldham's ring 31, a rotated elliptical ring 31b is formed on x- and y-axes of coordinates by rotating an elliptical ring 31a having axes of coordinates of the major axis and the minor axis respectively in a first radial direction (X-axis) and in a second radial direction (Y-axis) by a predetermined angle in a direction reverse to the direction of revolution of the shaft, and first keys 34, 35 and second keys 37, 38 are respectively opposingly disposed in the first radial direction and in the second radial direction on the rotated elliptical ring 31b. By employing this configuration, the ring width, ring diameter or key widths of the Oldham's ring 31 do not need to be increased, and the length of arm from the point of stress concentration on the bases of the key portions can be shortened, thus relieving the bending moments of the keys and resulting in the control of vibration during high-speed, high-pressure operation and in the improvement of the durability of the key portions.
摘要:
A scroll compressor includes stationary and orbiting scroll members in engagement with each other. The stationary scroll member includes a stationary end plate having first and second end surfaces opposite to each other, a stationary scroll wrap protruding axially from the first end surface of the stationary end plate, a discharge port defined in the stationary end plate in the proximity of a center thereof, and a recess defined in the stationary end plate on the second surface thereof. A check valve is received in the recess so as to open or close the discharge port. The recess has a shape substantially identical to the shape of the check valve and also has a depth greater than a maximum lift of the check valve.
摘要:
A scroll compressor includes a back pressure chamber oil-feeding path for feeding lubricating oil from a high-pressure region to a back pressure chamber, and a compression chamber oil-feeding path for feeding lubricating oil from the back pressure chamber to a compression chamber. One phase in which the back pressure chamber oil-feeding path is communicated from the high-pressure region to the back pressure chamber and another phase in which the compression chamber oil-feeding path is communicated from the back pressure chamber to the compression chamber are shifted from each other, so that the back pressure chamber oil-feeding path and the compression chamber oil-feeding path are never put into the communicating state simultaneously. Thus, after a halt of the compressor, under-communication oil-feeding of the lubricating oil from the high-pressure region via the back pressure chamber to the compression chamber can be prevented.
摘要:
A process of leaching gold can be inexpensively and efficiently carried out from a mixture containing sulfur and gold, typically from the material containing sulfur and gold that is an intermediate product recovered by the flotation method in the hydrometallurgical method. Specifically, the mixture containing elemental sulfur and gold and an aqueous solution of hydroxide of one or more of metals of alkali metals and alkaline earth metals are combined, the hydroxides reacting with elemental sulfur to form thiosulfate of alkali and/or alkaline earth metal, and the gold thereby being leached by reaction with the thiosulfate.
摘要:
The copper sulfide ore is leached in the halide bath without using a special oxidant but with the use of only air. The copper and gold in the copper sulfide ore can be leached at high leaching ratio.The treating steps are as follows. (1) Copper leaching process (CL). The raw material is charged into the first acidic aqueous solution, which contains cupric chloride, ferric chloride, 7 g/L of hydrochloric acid, and sodium chloride. The post-leach liquor contains copper in cuprous state ions and copper in cupric state ions. (2) Solid-Liquid separation step. The resultant solid and liquid of CL step are separated. (3) Air oxidation step (OX). Air is blown into the post solid-liquid separation liquor. The copper in cuprous state ions are oxidized to the copper in cupric state ions. The iron leached in the step (1) is oxidized. Simultaneously, the impurities leached in the step (2) are precipitated. (4) Copper extracting step (CEX). The copper is recovered from the post-liquor of the step (3) (5) Gold recovering step (AL). The residue separated in the step (2) is added to the leach liquor similar to that of the step (1). The steps (1) and (5) are carried out under the atmospheric pressure and at the temperature of boiling point or lower, while blowing air into the leach liquor.
摘要:
A process of leaching gold comprising the steps of: a) leaching copper from copper sulfide ore material that contains gold or contains silicate ore containing gold until the copper grade is reduced to 7.9 wt % or less; b) mixing the resulting material having a copper grade of 7.9 wt % or less with a gold leaching solution selected from the group consisting of a first solution containing chloride ions and ferric ions, and a second solution containing chloride ions and iron ions, the iron ions having been oxidized to trivalent ferric ions by air bubbled into the second solution; c) adjusting the pH of the gold leaching solution to 1.9 or less with stirring to leach at least gold in the material into the gold leaching solution by the oxidative activity of the ferric ions contained in the gold leaching solution, wherein the concentration of gold is reduced by selectively removing gold from part or all of the gold leaching solution during gold leaching. This process efficiently leaches at least copper and gold from a copper sulfide ore.
摘要:
A scroll compressor includes stationary and orbiting scroll members in engagement with each other. The stationary scroll member includes a stationary end plate having first and second end surfaces opposite to each other, a stationary scroll wrap protruding axially from the first end surface of the stationary end plate, a discharge port defined in the stationary end plate in the proximity of a center thereof, a generally horseshoe-shaped partition wall protruding axially from the second end surface of the stationary end plate, and spaced apart mounting legs protruding axially from the second end surface of the stationary end plate and continuous with the partition wall in such a manner that the partition wall extends between the mounting legs. Each of the mounting legs has a thickness greater than that of the partition wall and also has a height slightly greater than that of the partition wall.
摘要:
Disclosed is a method of leaching copper and gold from sulfide ores, which includes Process (1) of bringing a first aqueous acidic solution which contains chlorine ion, copper ion and iron ion, but no bromine ion, into contact with sulfide ores under supply of an oxidizing agent, so as to leach copper component contained in the sulfide ores; Process (2) of separating, by solid-liquid separation, a leaching reaction liquid obtained in Process (1), into a leaching residue and a leachate; and Process (3) of bringing a second aqueous acidic solution which contains chlorine ion, bromine ion, copper ion and iron ion, into contact with the leaching residue obtained in Process (2) under supply of an oxidizing agent, so as to leach gold contained in the leaching residue.