Method of controlling operation of nuclear reactor
    21.
    发明授权
    Method of controlling operation of nuclear reactor 失效
    控制核反应堆运行的方法

    公开(公告)号:US4368171A

    公开(公告)日:1983-01-11

    申请号:US210168

    申请日:1980-11-25

    IPC分类号: G21C7/00 G21C7/08

    摘要: A method of operating a nuclear reactor adapted to use cross-shaped control rods. The control rods are grouped into a plurality of groups having a first group consisting of a control rod located at the center of the core, a second group consisting of 8 control rods surrounding the control rod of the first group, a third group consisting of control rods located adjacent to and outside of the control rods of the second group, and other groups determined successively in the same manner as in the third group. During the operation period other than the period in which the number of the control rods to be inserted for realizing the critical condition of said nuclear reactor is less than 6, the nuclear reactor is operated with control rod patterns in which the inserted control rods are selected from control rods of alternate or every other groups of said groups so as to include at least a pair of control rods which are located in a similar manner to that of the KNIGHT's movement on a chess board.

    摘要翻译: 一种操作适于使用十字形控制棒的核反应堆的方法。 控制杆被分组成多个组,其具有第一组,第一组由位于芯的中心的控制棒组成,第二组由围绕第一组的控制棒的8个控制棒组成,第三组包括控制 位于第二组的控制棒附近和外侧的杆,以及与第三组相同的方式连续确定的其他组。 在操作期间,为了实现上述核反应堆的临界状态而插入的控制杆的数量少于6的期间,核反应堆以选择插入的控制棒的控制杆模式进行操作 从所述组的交替或其他组的控制棒中,至少包括一对控制棒,其以类似于在棋盘上的KNIGHT的运动的方式定位。

    Method of operating nuclear reactors
    22.
    发明授权
    Method of operating nuclear reactors 失效
    运行核反应堆的方法

    公开(公告)号:US4248667A

    公开(公告)日:1981-02-03

    申请号:US936922

    申请日:1978-08-25

    IPC分类号: G21C7/00 G21C7/08

    摘要: A method of operating a nuclear reactor wherein the reactor is operated for more than 50% of its operating period with the control rod patterns in which, in the central region of the reactor core accounting for at least 50% thereof, the control rods inserted from the bottom of the reactor core are at the depths of between 16/24 and 21/24 of the height of the reactor core with eight control rods surrounding each of said inserted control rods being fully withdrawn.

    摘要翻译: 一种操作核反应堆的方法,其中反应器的操作时间超过其操作周期的50%,其中控制杆模式在反应堆芯的中心区域占其至少50%,控制棒从 反应堆芯的底部处于反应堆堆芯的高度的16/24和21/24之间的深度,八个控制杆围绕着每个插入的控制杆被完全拉出。