BUILDING MANAGEMENT SYSTEM WITH MULTI-DIMENSIONAL ANALYSIS OF BUILDING ENERGY AND EQUIPMENT PERFORMANCE

    公开(公告)号:US20190033802A1

    公开(公告)日:2019-01-31

    申请号:US15821472

    申请日:2017-11-22

    Abstract: A building management system includes building equipment, a metrics engine, and a visualization module. The building equipment is configured to provide raw data samples of one or more data points. The metrics engine is configured to collect the raw data samples, and calculate a first metric, a second metric, and a third metric as a function of the raw data samples. The visualization module is configured to correlate the first metric to a first dimension value, the second metric to a second dimension value, and the third metric to a third dimension value. The visualization module is also configured to generate a graphical visualization in which the first dimension value is displayed as a first dimension of the graphical visualization, the second dimension value is displayed as a second dimension of the graphical visualization, and the third dimension value is displayed as a third dimension of the graphical visualization.

    BUILDING AUTOMATION SYSTEM WITH INTEGRATED BUILDING INFORMATION MODEL

    公开(公告)号:US20170115642A1

    公开(公告)日:2017-04-27

    申请号:US14919516

    申请日:2015-10-21

    Abstract: A building automation system (BAS) includes building equipment located within a building and a BAS network configured to facilitate communications between the building equipment. The building equipment operate to affect a variable state or condition within the building. The BAS includes a BAS-BIM integrator configured to receive BAS points from the BAS network and to integrate the BAS points with a building information model (BIM). The BIM includes a plurality of BIM objects representing the building equipment. The BAS includes an integrated BAS-BIM viewer configured to use the BIM with the integrated BAS points to generate a user interface. The user interface includes a graphical representation of the BIM objects and the BAS points integrated therewith.

Patent Agency Ranking