Abstract:
A method, apparatus, and program product automatically generate a surface network for an oilfield production system, e.g., as a new surface network or as an addition to an existing surface network. Candidate surface networks are generated from control vectors proposed by an optimization engine to optimize based upon an objective function that is based at least upon one or more geographical cost functions and one or more boundary conditions.
Abstract:
A method of optimizing production of wells using choke control includes generating, for each well, an intermediate solution to optimize the production of each well. The generating includes using an offline model that includes a mixed-integer nonlinear program solver and includes using production curves based on a choke state and a given wellhead pressure. The method further includes calculating, using a network model and the intermediate solution of each well, a current online wellhead pressure for each well. The method further includes setting the intermediate solution as a final solution based on determining that a difference between the current online wellhead pressure of each well and a prior online wellhead pressure of each well is less than a tolerance amount. The method further includes adjusting, using the final solution of each well, at least one operating parameter of the wells.
Abstract:
A method of optimizing production of wells using choke control includes generating, for each well, an intermediate solution to optimize the production of each well. The generating includes using an offline model that includes a mixed-integer nonlinear program solver and includes using production curves based on a choke state and a given wellhead pressure. The method further includes calculating, using a network model and the intermediate solution of each well, a current online wellhead pressure for each well. The method further includes setting the intermediate solution as a final solution based on determining that a difference between the current online wellhead pressure of each well and a prior online wellhead pressure of each well is less than a tolerance amount. The method further includes adjusting, using the final solution of each well, at least one operating parameter of the wells.