公开(公告)号:US20240411951A1
公开(公告)日:2024-12-12
申请号:US18333313
申请日:2023-06-12
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , William Bailey , Bertrand Theuveny
IPC: G06F30/20
Abstract: Embodiments presented provide for a clean-up apparatus and method for wellbore environments. In embodiments, a design for wellbore clean-up is chosen and then the design is modeled to perform operations on the wellbore and produce results related to an efficiency of clean-up and time to achieve this clean-up. The design may be optimized during the analysis.
-
公开(公告)号:US11543560B2
公开(公告)日:2023-01-03
申请号:US17047131
申请日:2019-04-15
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid
IPC: G01V99/00 , G06F30/20 , G06F17/18 , G06F111/08
Abstract: A method, computer program product, and computing system are provided for receiving reservoir data associated with the reservoir. A simulation may be performed on the reservoir data to generate simulated reservoir data. A subset of realizations including a minimal number of realizations from a plurality of realizations may be determined based upon, at least in part, one or more statistical moments of the simulated reservoir data. An optimized reservoir model associated with an objective may be generated based upon, at least in part, the subset of realizations including the minimal number of realizations.
-
公开(公告)号:US20240328289A1
公开(公告)日:2024-10-03
申请号:US18683812
申请日:2022-09-08
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , Agustin Gambaretto
CPC classification number: E21B43/122 , E21B49/087
Abstract: A method can include receiving a number of samples of liquid production values and associated gas-lift injection rates for one of one or more wells; determining a prospective optimal gas-lift injection rate for the one of the one or more wells via a regression that fits the number of samples; responsive to the prospective optimal gas-lift injection rate satisfying one or more gas-lift injection rate criteria, issuing an instruction to implement the prospective optimal gas-lift injection rate for the one of the one or more wells; receiving a new sample as a measured liquid production value for the implemented prospective optimal gas-lift injection rate and responsive to satisfaction of one or more compliance criteria; and replacing one of the number of samples with the new sample.
-
公开(公告)号:US20210397764A1
公开(公告)日:2021-12-23
申请号:US17309217
申请日:2019-11-08
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , Hamza Keurti , Rodney William Lessard , Trevor Graham Tonkin
Abstract: A physical pipeline network is decomposed into multiple subnetworks. The subnetworks include upstream subnetworks and at least one downstream subnetwork. A network solver is executed on the upstream subnetworks in parallel to obtain a set of boundary conditions and a set of control device settings. The set of boundary conditions and a set of control device settings are then used to execute the network solver on the downstream subnetwork and obtain a result having another set of control device settings. The network solver may repeat executions until convergence is achieved. When convergence is achieved, the result is presented.
-
公开(公告)号:US09816353B2
公开(公告)日:2017-11-14
申请号:US13830376
申请日:2013-03-14
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Kashif Rashid , William J. Bailey , Benoit Couet , Terry Wayne Stone
Abstract: A method and an apparatus for managing a subterranean formation including collecting information about a flow control valve in a wellbore traversing the formation, adjusting the valve in response to the information wherein the adjusting includes a Newton method, a pattern search method, or a proxy-optimization method. In some embodiments, adjusting comprises changing the effective cross sectional area of the valve. A method and an apparatus for managing a subterranean formation including collecting information about an inflow control valve in a wellbore traversing the reservoir and controlling the valve, wherein the control includes a direct-continuous approach or a pseudo-index approach.
-
公开(公告)号:US20250020501A1
公开(公告)日:2025-01-16
申请号:US18706764
申请日:2022-11-15
Applicant: Schlumberger Technology Corporation
Inventor: Agustin Gambaretto , Kashif Rashid , Michael John Williams
Abstract: A method can include calibrating a model using pressure and flow rate data to generate a calibrated model; receiving an upstream pressure value and a downstream pressure value that define a pressure differential across a flow device; and computing a flow rate through the flow device using the upstream pressure value, the downstream pressure value and the calibrated model.
-
公开(公告)号:US11773700B2
公开(公告)日:2023-10-03
申请号:US16727718
申请日:2019-12-26
Applicant: Schlumberger Technology Corporation
Inventor: Terizhandur S. Ramakrishnan , William J. Bailey , Kashif Rashid
CPC classification number: E21B43/122 , G01F1/78 , G01F1/74
Abstract: Methods and systems are provided for controlling gas lift in at least one production well, which determine a quadratic function that relates flow rate or value of oil produced from a production well to gas flow rate for gas injected into the production well based on flow rate measurements for gas injected into the production well and corresponding flow rate measurements of oil produced from the production well. The quadratic function is used to determine an optimal flow rate for gas injected into the production well. The optimal flow rate for gas injected into the production well is used to control the flow rate of gas injected into the production well, and an oil flow rate produced from the production well is measured at the optimal gas flow rate for iterative processing to refine the quadratic function and determination of optimal gas flow rate if need be.
-
公开(公告)号:US20230049394A1
公开(公告)日:2023-02-16
申请号:US17759052
申请日:2021-01-19
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , Sandeep Verma
IPC: E21B43/12
Abstract: A method can include receiving production fluid flow rate data from a well in a field that includes a plurality of wells; generating a gas lift profile for the well using the production fluid flow rate data; solving a system of equations representing at least two gas lift profiles for at least two of the plurality of wells to generate results; and issuing an instruction based at least in part on the results to control gas lift for production of fluid by the well.
-
公开(公告)号:US10435995B2
公开(公告)日:2019-10-08
申请号:US15109681
申请日:2015-01-06
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , Benoit Couet , William J. Bailey , Xing Li
IPC: E21B41/00 , G06F17/50 , E21B43/00 , G06Q10/06 , E21B43/26 , E21B43/267 , E21B47/00 , E21B49/00 , G05B13/04 , G06Q50/02 , G06N3/04 , H04W16/12
Abstract: Oilfield management includes obtaining a binary variable array describing configurable elements of an oilfield design, partitioning the binary variable array into subgroups, and applying a transformation function to each subgroup to obtain an integer variable for each subgroup. An optimization problem is solved on the binary variable array by treating the integer variable as a continuous variable to obtain a solution, and the transformation function of each subgroup is applied to the solution to obtain a design pattern. Based on the design pattern, the oilfield design is generated.
-
10.
公开(公告)号:US20160053753A1
公开(公告)日:2016-02-25
申请号:US14466750
申请日:2014-08-22
Applicant: Schlumberger Technology Corporation
Inventor: Kashif Rashid , David John Rossi
CPC classification number: E21B47/0007 , E21B43/121 , E21B43/122
Abstract: A method, apparatus, and program product perform lift optimization in a field with a plurality of wells, with each well including an artificial lift mechanism controlled by an associated well controller. In a central controller, a network simulation model functioning as a proxy of the field is accessed to determine an optimal allocation solution for the field, and a well-specific control signal is generated for each of the plurality of wells based upon the determined optimal allocation solution. The well-specific control signal for each of the plurality of wells is communicated to the associated well controller to cause the associated well controller to control a lift parameter associated with the artificial lift mechanism for the well.
Abstract translation: 一种方法,装置和程序产品在具有多个井的现场中执行升降机优化,其中每个井包括由关联井控制器控制的人造举升机构。 在中央控制器中,访问用作该场的代理的网络模拟模型以确定用于该场的最佳分配解决方案,并且基于所确定的最佳分配为多个井中的每一个产生特定于井的控制信号 解。 用于多个井中的每一个井的特定良好的控制信号被传送到相关联的井控制器,以使相关联的油井控制器控制与井的人工举升机构相关联的提升参数。
-
-
-
-
-
-
-
-
-