Rotary displacement piling equipment
    41.
    发明申请
    Rotary displacement piling equipment 失效
    旋转位移打桩设备

    公开(公告)号:US20010009204A1

    公开(公告)日:2001-07-26

    申请号:US09764184

    申请日:2001-01-17

    发明人: Lewis Stansfield

    IPC分类号: E02D005/18 E21B011/02

    CPC分类号: E02D7/20 E02D5/385

    摘要: A rotary displacement piling equipment for boring a hole within the soil comprising: a rotary displacement bit; driving rod means connected to the bit; a casing surrounding the driving rod means; a casing adapter having a lower end provided with a cylindrical collar for co-operating with the upper part of the casing for keeping in line the casing with respect to the driving rod means and with an horizontal thrust face for applying a thrust at the upper end of the casing, the driving means passing through the casing adapter; a rotary drive box co-operating with the driving rod means for rotating said driving rod means and provided with connecting means to be connected to the upper end of the casing adapter; and vertical supporting and guiding means for supporting and vertically guiding the rotary drive box.

    摘要翻译: 一种用于在土壤中钻孔的旋转位移打桩设备,包括:旋转位移钻头; 驱动杆装置连接到钻头; 围绕所述驱动杆装置的壳体; 壳体适配器具有下端,其具有圆柱形套环,用于与壳体的上部配合,用于保持壳体相对于驱动杆装置的排列,并具有用于在上端施加推力的水平推力面 所述驱动装置通过所述壳体适配器; 与所述驱动杆装置配合的旋转驱动箱,用于旋转所述驱动杆装置并设置有连接到所述壳体适配器的上端的连接装置; 以及用于支撑和垂直引导旋转驱动箱的垂直支撑和引导装置。

    Method and apparatus for forming enlarged pile heads
    42.
    发明授权
    Method and apparatus for forming enlarged pile heads 失效
    用于形成放大桩头的方法和装置

    公开(公告)号:US06168350A

    公开(公告)日:2001-01-02

    申请号:US09255728

    申请日:1999-02-23

    IPC分类号: E02D538

    摘要: A method of forming a cast-in-situ pile with an enlarged head, wherein a collar (1,13) is releasably affixed to the lower end of a piling tool (10) and the piling tool (10) and the collar (1,13) are driven to a first depth and the collar (1,13) is released from the piling tool (10). The piling tool (10) is then driven to a second depth, the piling tool (10) passing freely through a central aperture (2,14) of the collar (1,13), which remains at the first depth. The piling tool (10) is then withdrawn, and concrete or grout (20) is supplied to the lower end of the piling tool so as to form a cast-in-situ pile (22). When the lower end of the piling tool (10) again reaches the first depth, the collar (1,13) is lifted from the ground and concrete or grout (20) is supplied into the void left thereby so as to form a pile (22) with an enlarged head (23).

    摘要翻译: 一种形成具有扩大头部的原位桩的方法,其中,将套环(1,13)可释放地固定到打桩工具(10)的下端和打桩工具(10)和套环(1) ,13)被驱动到第一深度并且所述套环(13,13)从所述打桩工具(10)释放。 打桩工具(10)然后被驱动到第二深度,打桩工具(10)自由地穿过保持在第一深度的套环(1,13)的中心孔(2,14)。 然后抽出打桩工具(10),并将混凝土或灌浆(20)供应到打桩工具的下端,以便形成浇注桩(22)。 当打桩工具(10)的下端再次达到第一深度时,将套环(1,13)从地面提起,并将混凝土或浆料(20)供给到左边的空隙中,以便形成桩 22)具有扩大的头部(23)。

    Drilled, cast-in-place shell pile and method of constructing same
    43.
    发明授权
    Drilled, cast-in-place shell pile and method of constructing same 失效
    钻孔,现浇贝壳及其构造方法

    公开(公告)号:US6048137A

    公开(公告)日:2000-04-11

    申请号:US743980

    申请日:1996-10-31

    IPC分类号: E02D5/38 E02D19/18 F02D5/34

    CPC分类号: E02D19/18 E02D5/385

    摘要: A drilled, cast-in-place shell pile in the form of a cementacious pipe surrounding an earthen core. The pile is cast in an annular kerf drilled in the soil with a rotating hollow cylindrical core barrel. The earthen core within the annular kerf remains in place to form the core of the shell pile and act as a form. The cylindrical shell of the pile transfers load from above to the soil mass below through skin friction, and may be reinforced against tension loads by a plurality of reinforcing bars. The earthen core has end bearing capabilities to assist in transferring loads from above. Soil excavated from the annular kerf may be mixed with cement to form a cementitious soil/cement mixture to be pumped into the annular kerf to form the cylindrical shell. This cementitious mixture, while in a fluid state, is pumped into the excavation as the core barrel is removed. A mixing/circulating unit is provided for on-site mixing of dry cement with the cuttings and other materials to form the cylindrical shell. The shell pile may be used in soil solidification or soil improvement applications, or a plurality of such shell piles may be constructed as secant wall shell piles to form a cementitious barrier against lateral migration of moisture, soil contaminants, or other substances.

    摘要翻译: 一个钻孔的,现浇的贝壳,其形式是围绕着一个土层的水泥管。 该桩被浇注在一个环形切口中,该环形切口在土壤中钻出一个旋转的中空圆柱形核心筒。 环形切口内的土芯保持在适当位置,以形成壳层的核心并作为一种形式。 桩的圆柱形外壳通过皮肤摩擦将载荷从上方传递到下面的土体,并且可以通过多个钢筋来抵抗拉伸载荷。 土层具有终端承载能力,可帮助从上方转移载荷。 从环形切口挖出的土壤可以与水泥混合,以形成水泥土/水泥混合物,以将其泵入环形切口以形成圆柱形壳体。 当胶体混合物处于流体状态时,随着芯筒被移除而被泵送到挖掘中。 提供混合/循环单元,用于将干性水泥与切屑和其他材料进行现场混合以形成圆柱形壳体。 壳体桩可以用于土壤固化或土壤改良应用中,或者可以将多个这样的壳层构造成切割壁壳,以形成水泥屏障,防止水分,土壤污染物或其他物质的横向迁移。

    Apparatus for forming in-ground concrete pilings
    44.
    发明授权
    Apparatus for forming in-ground concrete pilings 失效
    用于形成地面混凝土桩的设备

    公开(公告)号:US4992002A

    公开(公告)日:1991-02-12

    申请号:US529486

    申请日:1990-05-29

    申请人: Wayne DeWitt

    发明人: Wayne DeWitt

    摘要: An apparatus for forming an in-ground concrete piling includes an elongate hollow mandrel which can be driven into the ground with a pile driver. A cupped foot, having a larger cross-sectional area than the mandrel, is placed beneath the mandrel before it is driven into the ground, and openings located near the bottom of the mandrel permit grout placed in the mandrel to flow into the space between the mandrel and the foot. A hollow sheath which slidably fits over the foot is attached to the bottom of an annular collar which slidably fits over the mandrel, forming a seal to prevent escape of grout from the openings while the mandrel is being filled. In use the mandrel is filled with grout before it is driven into the ground. Thereafter, during driving, the grout flows out of the openings in the bottom of the mandrel into the space around the mandrel, which is created by the foot. The column of grout in the mandrel acts as a static pressure head which forces the grout out of the mandrel into the surrounding space with a high volumetric flow rate as fast as the space is created.

    摘要翻译: 用于形成地面混凝土桩的装置包括细长的中空心轴,其可以用打桩机驱动到地面中。 具有比心轴更大的横截面面积的杯形脚在其被驱动进入地面之前被放置在心轴下方,并且位于心轴底部附近的开口允许放置在心轴中的灌浆流入到心轴之间的空间中 心轴和脚。 可滑动地装配在脚上的空心护套连接到可滑动地装配在心轴上的环形套环的底部,形成密封件以防止在心轴被填充时水泥浆从开口脱出。 在使用中,心轴在被驱动到地面之前被灌浆。 此后,在驱动期间,浆料从心轴的底部的开口流出到由心轴产生的心轴周围的空间中。 心轴中的灌浆柱用作静压头,其将浆料从心轴挤出到周围空间中,其具有与产生空间一样快的高体积流量。

    Ground treatment
    45.
    发明授权
    Ground treatment 失效
    地面处理

    公开(公告)号:US4730954A

    公开(公告)日:1988-03-15

    申请号:US914378

    申请日:1986-10-02

    摘要: Apparatus for forming a stone column in the ground is disclosed. The apparatus comprises a pair of concentric tubes (2,3) the inner one (2) of which is open at both ends, and at or near its lower end may be connected to the outer tube (3) by an outwardly extending wall portion (4). A driving plate (14) is attached at or close to the upper end of one of said inner and outer tubes, so as to extend around said one tube, so that the apparatus may be driven into or against the ground. In a preferred embodiment, the lower portion of the inner tube (2), the outwardly extending wall portion (4) and the lower portion of the outer tube (3) together define a cavity comprising an upper, relatively narrow portion (7) and a lower, relatively wide portion (9). A method of forming a stone column using the apparatus is also disclosed. After driving the apparatus into the ground, it is withdrawn in stages, after each of which a compacting force is applied in order to consolidate the stone column. By accentuating these compaction forces or their duration, it is possible to produce localized bulges along the stone column.In a modification, the method of the invention is used to form cast-in-place piles without the use of a pile shoe.

    摘要翻译: 公开了一种在地面上形成石柱的装置。 该装置包括一对同心管(2,3),其内部的一个(2)在两端敞开,并且其下端处或其附近可以通过向外延伸的壁部分连接到外管(3) (4)。 驱动板(14)附接在所述内管和外管中的一个的上端处或其附近,以便围绕所述一个管延伸,使得该装置可以被驱动进入或抵靠地面。 在优选实施例中,内管(2)的下部,向外延伸的壁部分(4)和外管(3)的下部一起限定了包括上部相对较窄部分(7)和 较低的较宽的部分(9)。 还公开了使用该装置形成石柱的方法。 在将设备驱动到地面之后,分阶段撤出,在每一个施加压实力以便整合石柱之后。 通过强化这些压实力或其持续时间,可以沿石柱产生局部隆起。 在修改中,本发明的方法用于在不使用绒毛鞋的情况下形成现浇桩。

    Apparatus for producing in-situ concreted piles with enlarged bases
    46.
    发明授权
    Apparatus for producing in-situ concreted piles with enlarged bases 失效
    用于生产具有扩大基座的原位混凝土桩的装置

    公开(公告)号:US4619558A

    公开(公告)日:1986-10-28

    申请号:US763816

    申请日:1985-08-08

    申请人: Ian H. Braatvedt

    发明人: Ian H. Braatvedt

    IPC分类号: E02D5/38 E02D5/44

    CPC分类号: E02D5/385 E02D5/44

    摘要: An apparatus for producing a concrete pile in the ground with an enlarged base, including a tube having a diameter, and an upper and a lower end, a shoe provided at the lower end of the tube and having a larger diameter than the tube so as to form a gap between the tube and the ground, a longitudinal outer casing having a diameter substantially equal to the shoe diameter so as to define a space between the tube and the outer casing, the casing also having a lower end attached to the shoe, and an open upper end so as to allow a free flow of concrete into the space between the tube and the outer casing, a sliding joint provided so as to slidably attach the outer casing to the tube so that a predetermined length of sliding exists between the tube and the outer casing, a pile having a free-falling hammer, the tube, with the outer casing attached, being drivable into the ground by the pile to a depth greater than the length of the outer casing so as to form an opening in the ground and define the gap between the tube and the ground, means for supplying concrete to the gap and the space so that the gap and the space are filled with concrete as the tube with the attached outer casing is driven into the ground, means for expelling the shoe from the lower end of the tube and the outer casing, along with some of the concrete, so as to form the enlarged base, and a traction cable attached to the upper end of the tube so that the tube is raiseable from the shoe after the enlarged base is formed so as to cause the tube to slide upwardly with respect to the outer casing, thereby allowing concrete from the space to enter the volume of space previously occupied by the lower end of the tube, the tube being raised to a point where both the tube and the outer casing are removed from the ground so that the concrete from the gap and the space fills the resulting opening.

    摘要翻译: 一种用于在地面中生产具有扩大的基部的混凝土桩的装置,包括具有直径的管,以及上端和下端,设置在管的下端并具有比管更大的直径的靴,以便 在管和地面之间形成间隙,纵向外壳具有基本上等于鞋直径的直径,以便限定管与外壳之间的空间,壳体还具有连接到鞋的下端, 和敞开的上端,以允许混凝土自由流入管和外壳之间的空间;滑动接头,设置成可滑动地将外壳附接到管上,使得预定长度的滑动存在于 管和外壳,具有自由落体锤的桩,具有附接的外壳的管可由桩驱动到地面中的深度大于外壳的长度,以形成开口 地面和defi 管和地面之间的间隙,用于将混凝土供应到间隙和空间的装置,使得当具有附接的外壳的管被驱动到地面中时,间隙和空间充满混凝土,用于排出鞋的装置 从管的下端和外壳连同一些混凝土,以便形成扩大的基部,以及连接到管的上端的牵引绳,使得管可以在鞋之后从鞋中抬起 形成扩大的基部以使管相对于外壳向上滑动,从而允许来自空间的混凝土进入先前由管的下端占据的空间的体积,管被升高到 管和外壳两者都从地面上取下,使得来自间隙和空间的混凝土填满所得到的开口。

    Device and process for making unclad concrete piles
    47.
    发明授权
    Device and process for making unclad concrete piles 失效
    不包括混凝土桩的装置和工艺

    公开(公告)号:US4575283A

    公开(公告)日:1986-03-11

    申请号:US558555

    申请日:1983-12-05

    IPC分类号: E02D5/38 E02D5/42 E02D5/34

    CPC分类号: E02D5/42 E02D5/385

    摘要: The device comprises:a beating cap (1) provided with a conduit (2) for introduction of the concrete under pressure;a pipe form (3) to be sunk and pulled out gradually as the concrete is introduced, the pipe form having a fastening (4) connected to a pressure gauge (4') for reading of the pressures acting on the concrete;a chuck (5) located between the pipe form (3) and having a conduit for passage of the concrete (2) under pressure and a cylindrical sheath (6) for reducing volume;two expandable tubular rings (7,7') to make a seal for the air under pressure in the air chamber (8) between the pipe form (3) and the chuck (5) to achieve locking between the chuck (5), the pipe form (3) and the beating cap (1);a one-time bottom (9) to prevent penetration of dirt in the pipe form during sinking;The raising of the pipe form (3) gradually as the concrete is introduced being facilitated by the pressure that is exerted in air chamber (8) by the effect of the introduction of the concrete.

    摘要翻译: 该装置包括:打浆盖(1),设有用于在压力下引入混凝土的导管(2); 管道形式(3)随着混凝土被引入而逐渐沉没并拉出,管形式具有连接到压力表(4')的紧固件(4),用于读取作用在混凝土上的压力; 位于管形式(3)之间并且具有用于在压力下通过混凝土(2)的导管和用于减小体积的圆柱形护套(6)的卡盘(5) 两个可膨胀的管状环(7,7'),以在管形式(3)和卡盘(5)之间的空气室(8)内为压缩空气进行密封,以实现卡盘(5)之间的锁定 管形式(3)和打浆帽(1); 一次性底部(9),用于防止下沉期间管道中的污物渗透; 通过引入混凝土的作用,在空气室(8)中施加的压力促进了引入混凝土的管形式(3)逐渐升高。

    Method for producing in-situ concreted piles with enlarged bases
    48.
    发明授权
    Method for producing in-situ concreted piles with enlarged bases 失效
    生产现浇混凝土桩的方法

    公开(公告)号:US4544515A

    公开(公告)日:1985-10-01

    申请号:US545948

    申请日:1983-10-27

    申请人: Ian H. Braatvedt

    发明人: Ian H. Braatvedt

    IPC分类号: E02D5/38 E02D5/44 E04B1/16

    CPC分类号: E02D5/385 E02D5/44

    摘要: A method and apparatus for producing in-situ concrete piles with enlarged bases. The method includes the steps of: driving into the ground a tube provided at its lower end with a shoe which is larger than the diameter of the tube, and with an outer casing attached around its lower portion; filling fresh concrete into the gap between the tube and the soil as fast as the opening in the soil is formed; expelling the shoe and a plug of concrete to form the enlarged base; and extracting the tube together with the outer casing.

    摘要翻译: 一种用于生产现场混凝土桩的方法和装置。 该方法包括以下步骤:将设置在其下端的管子驱动到地面上,该导管的尺寸大于管的直径,外壳围绕其下部安装; 将新拌混凝土填充到管和土壤之间的间隙中,与土壤中的开口形成一样快; 排出鞋和混凝土塞,形成扩大的基地; 并与外壳一起取出管。

    Geothermal heating system and method of installing the same
    49.
    发明授权
    Geothermal heating system and method of installing the same 失效
    地热采暖系统及其安装方法

    公开(公告)号:US4286651A

    公开(公告)日:1981-09-01

    申请号:US144257

    申请日:1980-04-28

    摘要: A geothermal system and method of installing the same comprises the steps successively driving a drive pipe structure vertically into the ground at a plurality of locations so that a major portion of the length of the drive pipe structure is located below the frost line. An elongate geothermal pipe having closed ends is inserted into the drive pipe structure and its lower end is interlocked with a drive point device located at the lower end of the drive pipe structure. Thereafter, when the drive pipe is removed, the geothermal pipe remains anchored to the drive point. The geothermal pipes are connected together by conduits and connected to a heat pump so that a heat exchange liquid will be circulated through the system.

    摘要翻译: 地热系统及其安装方法包括以下步骤:在多个位置上将驱动管结构垂直地驱动到地面中,使得驱动管结构的长度的主要部分位于霜冻线下方。 具有闭合端的细长地热管被插入驱动管结构中,其下端与位于驱动管结构的下端的驱动点装置互锁。 此后,当驱动管被移除时,地热管保持锚定到驱动点。 地热管通过管道连接在一起并连接到热泵,使得热交换液体将循环通过系统。

    Method and installation for producing cast-in-situ piles
    50.
    发明授权
    Method and installation for producing cast-in-situ piles 失效
    生产现浇桩的方法和安装

    公开(公告)号:US4230425A

    公开(公告)日:1980-10-28

    申请号:US21490

    申请日:1979-03-19

    CPC分类号: E02D5/385

    摘要: According to the invention, a casing pipe is set on the ground and filled with a fluid, whereupon electric pulses are passed through the fluid to produce a series of electric discharges. The casing pipe is driven into the ground due to the resultant electrohydraulic effect. While the casing pipe is being pulled from the ground, it is filled with concrete mix which is compacted by passing electric pulses therethrough to produce electric discharges. The installation for effecting this method comprises a pile puller, a pile driver and a concrete feeder, all connected to the casing pipe. The pile driver incorporates a fluid feed system communicating with the casing pipe, and a pulse device with electrodes installed at the lower portion of the casing pipe, which is intended to produce electric discharges in the fluid fed into the casing pipe by the fluid feed system.

    摘要翻译: 根据本发明,将套管设置在地面上并填充有流体,由此电脉冲通过流体以产生一系列放电。 由于所得到的电液效应,套管被驱动进入地面。 当套管被从地面拉出时,它充满混凝土混合物,该混凝土混合物通过使电脉冲通过而压实以产生放电。 用于实施该方法的安装包括打桩机,打桩机和混凝土供料器,全部连接到套管。 打桩机包括与套管连通的流体供给系统,以及具有安装在套管的下部的电极的脉冲装置,其用于在通过流体供给系统供给到套管中的流体中产生放电 。