Abstract:
A predictive power control system includes a battery configured to store and discharge electric power, a battery power inverter configured to control an amount of the electric power stored or discharged from the battery, and a controller. The controller is configured to predict a power output of a photovoltaic field and use the predicted power output of the photovoltaic field to determine a setpoint for the battery power inverter.
Abstract:
A power control system includes a battery, a battery power inverter configured to control an amount of the electric power stored or discharged from the battery, a photovoltaic power inverter configured to control a power output of a photovoltaic field, and a controller. The power outputs of the battery power inverter and the photovoltaic power inverter combine at a point of interconnection. The controller adjusts a setpoint for the photovoltaic power inverter in response to a determination that the total power at the point of interconnection exceeds a point of interconnection power limit.
Abstract:
A building control system uses an empirical technique to determine the uncertainty in parameters of an energy use model. The energy use model is used to predict energy consumption of a building site as a function of the model parameters and one or more predictor variables. The empirical technique includes obtaining a set of data points, each of the data points including a value for the one or more predictor variables and an associated energy consumption value for the building site. Multiple samples are generated from the set of data points, each of the multiple samples including a plurality of data points selected from the set of data points. For each of the multiple samples, the model parameters are estimated using the plurality of data points included in the sample. The uncertainty in the model parameters is determined using the multiple estimates of the model parameters.
Abstract:
Systems and methods for determining an appropriate parameter order for a building energy use model are provided. A described method includes receiving an energy use model for a building site, obtaining a plurality of data points, calculating a first regression statistic indicating a fit of the energy use model to the plurality of data points under a null hypothesis and a second regression statistic indicating a fit of the energy use model to the plurality of data points under an alternative hypothesis, and comparing a test statistic to a threshold value. The test statistic is a function of the first regression statistic and the second regression statistic. The method further includes determining an appropriate parameter order for the energy use model based on a result of the comparison.
Abstract:
Systems and methods for determining an appropriate parameter order for a building energy use model are provided. A described method includes receiving an energy use model for a building site, obtaining a plurality of data points, calculating a first regression statistic indicating a fit of the energy use model to the plurality of data points under a null hypothesis and a second regression statistic indicating a fit of the energy use model to the plurality of data points under an alternative hypothesis, and comparing a test statistic to a threshold value. The test statistic is a function of the first regression statistic and the second regression statistic. The method further includes determining an appropriate parameter order for the energy use model based on a result of the comparison.