Abstract:
The invention relates to a method for regulation of operational parameters of the core of a pressurised water nuclear reactor comprising: a step of acquisition of values (FH, FB, TBC, TBF, Q) which are representative of the conditions of operating of the core of the reactor; a step of evaluation of the actual values (Tmoye, AOe, {circumflex over (P)} maxe) of the operational parameters at least according to the values acquired (FH, FB, TBC, TBF, Q); a step of selection of a control law for the concentration of a neutron-absorbent component ([B]) and for the positions of insertion (Z1 to Z5) of the groups (P1 to P5) of rods selected from at least the first and second control laws which are different from one another; and a step of regulation of the operational parameters by means of the control law selected, according to set points (Tmoyc, AOc, {circumflex over (P)} maxc) relative to the said parameters and to the actual values (Tmoye, AOe, {circumflex over (P)} maxe) evaluated.
Abstract:
The present invention relates to a method for controlling a pressurized water reactor (100) comprising the steps that involve measuring the effective power (Pe) of the nuclear reactor; acquiring a reference value for the desired power (Pc); acquiring an estimated duration (DURATION) for the increase in power in order to achieve said reference value of the target power (Pc) desired, said estimated duration (DURATION) corresponding to the time taken for the power to increase from said effective power (Pe) to said reference value for the target power (Pc); determining the reference position (Z) of at least one control rod cluster among said plurality of control rod clusters (40) in order to achieve said reference value for said target power (Pc) desired as a function of said estimated duration (DURATION), of said measured effective power (Pe) and of said reference value for said target power (Pc); monitoring the position of said at least one control rod cluster so as to position it in its reference position (Z).
Abstract:
The present invention relates to a method for controlling a pressurized water reactor (100) comprising the steps that involve measuring the effective power (Pe) of the nuclear reactor; acquiring a reference value for the desired power (Pc); acquiring an estimated duration (DURATION) for the increase in power in order to achieve said reference value of the target power (Pc) desired, said estimated duration (DURATION) corresponding to the time taken for the power to increase from said effective power (Pe) to said reference value for the target power (Pc); determining the reference position (Z) of at least one control rod cluster among said plurality of control rod clusters (40) in order to achieve said reference value for said target power (Pc) desired as a function of said estimated duration (DURATION), of said measured effective power (Pe) and of said reference value for said target power (Pc); monitoring the position of said at least one control rod cluster so as to position it in its reference position (Z).
Abstract:
The invention relates to a method for regulation of operational parameters of the core of a pressurised water nuclear reactor comprising: a step of acquisition of values (FH, FB, TBC, TBF, Q) which are representative of the conditions of operating of the core of the reactor; a step of evaluation of the actual values (Tmoye, AOe, {circumflex over (P)} maxe) of the operational parameters at least according to the values acquired (FH, FB, TBC, TBF, Q); a step of selection of a control law for the concentration of a neutron-absorbent component ([B]) and for the positions of insertion (Z1 to Z5) of the groups (P1 to P5) of rods selected from at least the first and second control laws which are different from one another; and a step of regulation of the operational parameters by means of the control law selected, according to set points (Tmoyc, AOc, {circumflex over (P)} maxc) relative to the said parameters and to the actual values (Tmoye, AOe, {circumflex over (P)} maxe) evaluated.