摘要:
Distributed storage resources having multiple storage units are managed based on data collected from online monitoring of workloads on the storage units and performance characteristics of the storage units. The collected data is sampled at discrete time intervals over a time period of interest, such as a congested time period. Normalized load metrics are computed for each storage unit based on time-correlated sums of the workloads running on the storage unit over the time period of interest and the performance characteristic of the storage unit. Workloads that are migration candidates and storage units that are migration destinations are determined from a representative value of the computed normalized load metrics, which may be the 90th percentile value or a weighted sum of two or more different percentile values.
摘要:
Distributed storage resources are managed based on data collected from online monitoring of workloads on the storage resources and performance characteristics of the storage resources. Load metrics are calculated from the collected data and used to identify workloads that are migration candidates and storage units that are migration destinations, so that load balancing across the distributed storage resources can be achieved.
摘要:
Distributed storage resources are managed based on data collected from online monitoring of workloads on the storage resources and performance characteristics of the storage resources. Load metrics are calculated from the collected data and used to identify workloads that are migration candidates and storage units that are migration destinations, so that load balancing across the distributed storage resources can be achieved.
摘要:
A software controlled mechanism causing a test equipment to place the edges of test signals accurately. The mechanism determines expected time of occurrence of an edge of a signal in relation to a tester cycle time. The mechanism sends commands to the test equipment to receive back the signal (of interest) in multiple cycles and provides the time points corresponding to the edge in the multiple cycles. The software controlled mechanism computes an error based on the time points and the expected time, and adjusts the timing of the edges of the signal according to the error. Such computation and adjustment are performed until the error is within an acceptable range.