-
公开(公告)号:US6125901A
公开(公告)日:2000-10-03
申请号:US28531
申请日:1998-02-24
申请人: Hans-Joachim Englisch , Carsten Henkenjohann , Klaus Rudiger Lampe , Thomas Lucking , Ali Mansuroglu , Wolfgang Melies , Hubertus Ritzenhofen
发明人: Hans-Joachim Englisch , Carsten Henkenjohann , Klaus Rudiger Lampe , Thomas Lucking , Ali Mansuroglu , Wolfgang Melies , Hubertus Ritzenhofen
CPC分类号: B32B39/00 , B27M1/08 , B27M3/18 , B27N3/18 , B27N3/22 , Y10S269/905 , Y10T156/1322 , Y10T156/1751 , Y10T156/1768
摘要: A door is made from a rigid core plate, two side bars, two end bars, a pair of face panels, and a pair of cover sheets. The core plate and bars are cut to respective sizes, and then the bars are manually fitted around the core plate, are pressed against edges of the core plate to form a door core, and are secured together at corners of the core. This core is displaced on an upstream core conveyor to a core-holding station. One of the face panels is loaded manually onto a face-panel conveyor and fed thereby through a glue applicator to a face-panel holding station and one of the cover sheets is manually set in a cover-sheet holding station. The one cover sheet is picked up and laid in a stacking station, then the one face panel is picked up and set atop the one cover sheet, and then the core is picked up and set atop the face panel. The other face panel is manually loaded onto the face-panel conveyor and is fed thereby through the glue applicator to the face-panel holding station and the other cover sheet is manually set in the cover-sheet holding station. Then the other face panel is picked up and laid in the stacking station atop the core plate and the other cover sheet is picked up and laid atop the other face panel. Finally the stack in the transfer station is transferred into a press.
摘要翻译: 门由刚性芯板,两个侧杆,两个端杆,一对面板和一对盖片制成。 将芯板和棒切割成各自的尺寸,然后将杆手动地装配在芯板周围,压靠在芯板的边缘上以形成门芯,并且在芯的角部固定在一起。 该芯在上游芯输送机上移动到芯保持站。 其中一个面板手动加载到面板输送机上,并通过涂胶器进给到面板保持站,并且其中一个盖板被手动地设置在盖板保持站中。 将一张盖片拾取放置在堆放站中,然后拾取一个面板并将其放置在一个盖板的顶部,然后将芯体拾起并放置在面板顶部。 将另一个面板手动装载到面板输送机上,并通过涂胶器将其供给到面板保持站,另一个盖板被手动地设置在盖板保持站中。 然后将另一个面板拾起并放置在堆芯站顶部的核心板上,另一个盖板被拾起并放置在另一个面板的顶部。 最后将转运站中的堆叠转移到压机中。