Method for deslagging a cyclone furnace
    1.
    发明授权
    Method for deslagging a cyclone furnace 失效
    用于消除圆柱形炉的方法

    公开(公告)号:US5196648A

    公开(公告)日:1993-03-23

    申请号:US707711

    申请日:1991-05-30

    申请人: Linza J. Jones

    发明人: Linza J. Jones

    摘要: A method and apparatus for deslagging a cyclone furnace in which a series of flexible hollow tubes are inserted into the combustion chamber and the explosive charges in each hollow tube are detonated sequentially. Each of the hollow tubes is biased outwardly against the accumulated slag and ash in the combustion chamber. The hollow tubes may be formed in arcs or rings in planes perpendicular to the longitudinal axis of the combustion chamber, and spacer rings may be positioned between each ring.

    Method for deslagging a boiler
    2.
    发明授权
    Method for deslagging a boiler 失效
    锅炉除渣方法

    公开(公告)号:US5056587A

    公开(公告)日:1991-10-15

    申请号:US637961

    申请日:1991-01-09

    IPC分类号: B08B9/027 F28G7/00

    CPC分类号: F28G7/00 F28G7/005

    摘要: A method for removing accumulated ash from the heat exchangers within a steam generator includes introducing a series of high-energy shocks to the tubing panels of the heat exchangers. Explosive cords are attached to the tubing panels at preselected, spaced-apart locations and separately detonated at preselected intervals to establish a vibratory pattern in the tubing panels and thereby separate the ash from the tubing panels.

    摘要翻译: 一种用于从蒸汽发生器内的热交换器中除去积聚灰尘的方法包括将一系列高能冲击引入到热交换器的管板上。 爆炸索在预选的间隔位置处连接到管板上,并以预先选定的间隔独立地引爆,以在管板中建立振动模式,从而将灰分与管板分开。

    Apparatus for deslagging a cyclone furnace
    3.
    发明授权
    Apparatus for deslagging a cyclone furnace 失效
    用于除气旋风炉的设备

    公开(公告)号:US5307743A

    公开(公告)日:1994-05-03

    申请号:US995094

    申请日:1992-12-22

    申请人: Linza J. Jones

    发明人: Linza J. Jones

    摘要: A method and apparatus for deslagging a cyclone furnace in which a series of flexible hollow tubes are inserted into the combustion chamber and the explosive charges in each hollow tube are detonated sequentially. Each of the hollow tubes is biased outwardly against the accumulated slag and ash in the combustion chamber. The hollow tubes may be formed in arcs or rings in planes perpendicular to the longitudinal axis of the combustion chamber, and spacer rings may be positioned between each ring.

    摘要翻译: 一种用于脱气旋风炉的方法和装置,其中一系列柔性中空管被插入到燃烧室中,并且每个中空管中的炸药装置依次被引爆。 每个中空管向外偏压在燃烧室内积聚的炉渣和灰尘。 中空管可以在与燃烧室的纵向轴线垂直的平面中形成为圆弧或环,并且间隔环可以位于每个环之间。