Fluid chuck device and method
    1.
    发明授权
    Fluid chuck device and method 有权
    流体卡盘装置及方法

    公开(公告)号:US07144207B2

    公开(公告)日:2006-12-05

    申请号:US10628232

    申请日:2003-07-29

    Abstract: In a valve disposed between a fluid supply and a socket of a chuck and configured to regulate the flow of the fluid to the socket. There is a seal screw for modulating a preload tension. This seal screw has a first sealing surface. The valve further includes a second sealing surface in opposing relation to the first sealing surface and an elastomer seal ring disposed between the first sealing surface and the second sealing surface. The valve is configured to form a seal between the first sealing surface, the second sealing surface, and the elastomer seal in response to a force less than or equal to the preload tension being exerted in line with the seal screw. In this manner, the valve is configured to allow the flow of the fluid between the first sealing surface and the second sealing surface in response to a force exceeding the preload tension being exerted in line with the seal screw.

    Abstract translation: 在设置在流体供应器和卡盘的插座之间并被配置为调节流体到套筒的流动的阀中。 有一个用于调节预紧张力的密封螺丝。 该密封螺钉具有第一密封面。 阀还包括与第一密封表面相对的第二密封表面和设置在第一密封表面和第二密封表面之间的弹性体密封环。 该阀构造成响应于小于或等于与密封螺钉一致地施加的预加载张力的力而在第一密封表面,第二密封表面和弹性体密封件之间形成密封。 以这种方式,阀被构造成响应于超过预加载张力的力与密封螺钉一致地施加流体在第一密封表面和第二密封表面之间的流动。

    INTEGRAL ILLUMINATED OPTICAL CENTER FINDER AND MARKING TOOL
    2.
    发明申请
    INTEGRAL ILLUMINATED OPTICAL CENTER FINDER AND MARKING TOOL 有权
    集成照明光学中心查找器和标记工具

    公开(公告)号:US20100170100A1

    公开(公告)日:2010-07-08

    申请号:US12350153

    申请日:2009-01-07

    CPC classification number: B25D5/00 B25D5/02 B25H7/04 Y10T29/49826

    Abstract: Apparatus and methods associated with a center finder and marking tool are disclosed. A center finder and marking tool device includes a base that is configured to be positioned on a work piece surface. The base includes a bore hole. A body is disposed inside the bore hole and rotationally coupled to the base, wherein the body includes a first bore tunnel and a second bore tunnel. An optical center finder is disposed inside the first bore tunnel, and a marking tool is disposed inside the second bore tunnel.

    Abstract translation: 公开了与中心取景器和标记工具相关联的装置和方法。 中心取景器和标记工具装置包括被配置为定位在工件表面上的基座。 底座包括钻孔。 主体设置在钻孔内部并且旋转地联接到基座,其中主体包括第一孔洞和第二孔洞。 光学中心取景器设置在第一孔洞内,并且标记工具设置在第二孔洞内。

    Method and apparatus for removing blind fasteners
    3.
    发明授权
    Method and apparatus for removing blind fasteners 有权
    去除盲链扣件的方法和装置

    公开(公告)号:US08387226B2

    公开(公告)日:2013-03-05

    申请号:US12330249

    申请日:2008-12-08

    Abstract: A method and apparatus are present for removing a blind fastener from a structure. A first hole is drilled in a guide located around a center of a head of a core bolt in a body of the blind fastener to form a pilot hole. A second hole is drilled in the pilot hole in the head of the core bolt. The head of the core bolt is separated from the shaft of the core bolt. The core bolt is separated from the body. The core bolt is moved out of the body after the core bolt has been separated from the body. A head of the body is separated from a shaft of the body. The shaft of the body is moved out of the structure.

    Abstract translation: 存在用于从结构上移除盲卡扣的方法和装置。 在位于盲紧固件的主体中的芯螺栓的头部的中心周围的引导件中钻出第一孔,以形成导向孔。 在螺栓头部的导向孔中钻出第二个孔。 芯螺栓的头部与铁芯螺栓的轴分离。 铁芯螺栓与车身分离。 铁芯螺栓已经从机体分离后,将芯螺栓移出体外。 身体的头部与身体的轴分离。 身体的轴移出结构。

    Integral illuminated optical center finder and marking tool
    4.
    发明授权
    Integral illuminated optical center finder and marking tool 有权
    积分照明光学中心取景器和标记工具

    公开(公告)号:US07984564B2

    公开(公告)日:2011-07-26

    申请号:US12350153

    申请日:2009-01-07

    CPC classification number: B25D5/00 B25D5/02 B25H7/04 Y10T29/49826

    Abstract: Apparatus and methods associated with a center finder and marking tool are disclosed. A center finder and marking tool device includes a base that is configured to be positioned on a work piece surface. The base includes a bore hole. A body is disposed inside the bore hole and rotationally coupled to the base, wherein the body includes a first bore tunnel and a second bore tunnel. An optical center finder is disposed inside the first bore tunnel, and a marking tool is disposed inside the second bore tunnel.

    Abstract translation: 公开了与中心取景器和标记工具相关联的装置和方法。 中心取景器和标记工具装置包括被配置为定位在工件表面上的基座。 底座包括钻孔。 主体设置在钻孔内部并且旋转地联接到基座,其中主体包括第一孔洞和第二孔洞。 光学中心取景器设置在第一孔洞内,并且标记工具设置在第二孔洞内。

    METHOD AND APPARATUS FOR REMOVING BLIND FASTENERS
    5.
    发明申请
    METHOD AND APPARATUS FOR REMOVING BLIND FASTENERS 有权
    用于去除盲孔的方法和装置

    公开(公告)号:US20110000064A1

    公开(公告)日:2011-01-06

    申请号:US12330249

    申请日:2008-12-08

    Abstract: A method and apparatus are present for removing a blind fastener from a structure. A first hole is drilled in a guide located around a center of a head of a core bolt in a body of the blind fastener to form a pilot hole. A second hole is drilled in the pilot hole in the head of the core bolt. The head of the core bolt is separated from the shaft of the core bolt. The core bolt is separated from the body. The core bolt is moved out of the body after the core bolt has been separated from the body. A head of the body is separated from a shaft of the body. The shaft of the body is moved out of the structure.

    Abstract translation: 存在用于从结构上移除盲卡扣的方法和装置。 在位于盲紧固件的主体中的芯螺栓的头部的中心周围的引导件中钻出第一孔,以形成导向孔。 在螺栓头部的导向孔中钻出第二个孔。 芯螺栓的头部与铁芯螺栓的轴分离。 铁芯螺栓与车身分离。 铁芯螺栓已经从机体分离后,将芯螺栓移出体外。 身体的头部与身体的轴分离。 身体的轴移出结构。

    Fluid inducer evaluation device and method
    6.
    发明授权
    Fluid inducer evaluation device and method 有权
    流体诱导剂评估装置及方法

    公开(公告)号:US06962072B2

    公开(公告)日:2005-11-08

    申请号:US10628233

    申请日:2003-07-29

    CPC classification number: F16K37/00

    Abstract: A fluid inducer having an inducer valve operable to open in response to a load is evaluated by an evaluation device. This device includes a fluid conduit for pressurizing the fluid inducer with a fluid and a pressure sensor that senses the pressure in the fluid conduit. In addition, the device includes an actuator for applying the load to the fluid inducer and a load sensor that determines the load in response to the sensed pressure.

    Abstract translation: 具有可操作以响应于负载打开的诱导阀的流体诱导器由评估装置评估。 该装置包括用于利用流体和用于感测流体导管中的压力的​​压力传感器来加压流体诱导器的流体导管。 此外,该装置包括用于将负载施加到流体诱导器的致动器和负载传感器,该负载传感器响应于感测到的压力来确定负载。

    Pneumatic-hydraulic drill unit
    7.
    发明授权
    Pneumatic-hydraulic drill unit 失效
    气动液压钻机

    公开(公告)号:US4594030A

    公开(公告)日:1986-06-10

    申请号:US574900

    申请日:1984-01-30

    Abstract: A hand-held pneumatic-hydraulic drill unit employs modular drilling and clamp-up assemblies to perform a complete drilling cycle. The drilling cycle consists of: (1) clamping the drill unit to a work piece and/or a template that positions the drill unit relative to the workpiece; (2) advancing a rotating tool bit to perform the desired machining operation; (3) withdrawing the tool bit from the machined opening; and (4) releasing the clamping mechanism that secures the drill unit to the workpiece. The drill unit includes a pneumatic motor subassembly that is advanced toward and retracted from a workpiece by a hydraulically actuated feed cylinder. The motor subassembly and feed cylinder are axially aligned with one another. The clamp-up assembly of the drill unit also includes a clamp cylinder that is activated solely by hydraulic pressure. A modular, pneumatically actuated hydraulic pump is mounted on the drill unit and supplies pressurized hydraulic fluid to the feed and clamp cylinders. Variations in drilling depths, drilling speeds, feed rates, drilling thrusts, and clamp-up forces can be effected by changing modular components of the drill unit.

    Abstract translation: 手持式气动液压钻机采用模块化钻孔和夹紧组件来执行完整的钻孔循环。 钻孔周期包括:(1)将钻机单元夹紧到将钻孔单元相对于工件定位的工件和/或模板; (2)推进旋转刀头进行所需的加工操作; (3)从加工开口取出工具头; 和(4)释放将钻孔单元固定到工件上的夹持机构。 钻机单元包括气动马达子组件,该气动马达子组件通过液压致动的进料圆筒向工件前进和退出。 马达子组件和进料圆筒彼此轴向对准。 钻机单元的夹紧组件还包括仅通过液压激活的夹紧缸。 模块化的气动液压泵安装在钻机上,并将加压的液压流体供应到进给和夹紧缸。 可以通过改变钻机单元的模块化部件来实现钻削深度,钻削速度,进给速度,钻削推力和夹紧力的变化。

Patent Agency Ranking