摘要:
A system is provided for the preparation of a cyclic maintenance work schedule table. The system includes a display unit which can show boxes defined by dates in a desired period and the names of individual workers. The system also has a worker data memory for storing scheduled work information of the individual workers during the period and work qualifications of the individual workers; a building data memory for storing the names, work details, last working dates, and contracted frequencies of maintenance work of buildings to be worked with during the period; a processor for deciding working dates in the period for the buildings stored in the building data memory; and another processor for allocating the names of the buildings in the descending order of the difficulty of work items on the basis of data - which have been obtained from the worker data memory, building data memory and working date deciding means - and, after one of the boxes has been filled with a predetermined working time, moving to another one of the boxes.
摘要:
A computing-device management device capable of easily carrying out load distribution is provided. The computing-device management device has: a future load prediction unit that calculates a load prediction value, which is a value of a future load in each of computing devices, on the basis of load information of the computing device informed by the computing device and that determines whether the load prediction value exceeds a predetermined threshold value or not; a software allocation unit that detects, as a target computing device to be in an overloaded state in future, the computing device determined by the future load prediction unit to have the load prediction value exceeding the predetermined threshold value and that determines which computing device is to be an allocation destination of at least one software component operating in the target computing device on the basis of a CPU load, a memory used volume, and a data communication volume of the computing device; and an informing unit that informs the target computing device and the allocation-destination computing device of information of the allocated software component.
摘要:
A computing-device management device includes a future load prediction unit that calculates a load prediction value based on load information of the computing device informed by the computing device and determines whether the load prediction value exceeds a predetermined threshold value. A software allocation unit detects, as a target computing device to be in an overloaded state in future, the computing device determined by the future load prediction unit to have the load prediction value exceeding the predetermined threshold value and determines which computing device is to be an allocation destination of at least one software component operating in the target computing device based on a CPU load, a used memory volume, and a data communication volume of the computing device. An informing unit informs the target computing device and the allocation-destination computing device of information of the allocated software component.