Mould core for casting concrete elements
    1.
    发明授权
    Mould core for casting concrete elements 失效
    用于铸造混凝土元件的模芯

    公开(公告)号:US4471936A

    公开(公告)日:1984-09-18

    申请号:US347613

    申请日:1982-02-10

    申请人: Per-Erik Bondpers

    发明人: Per-Erik Bondpers

    IPC分类号: B28B7/30 B22C9/24

    CPC分类号: B28B7/30

    摘要: In the casting of a concrete element, such as a column support block, in which there is used a mould core designed to produce one or more recesses or grooves in the element, the mould core is provided with one or more apertures or slots, in each of which there is arranged a recess-forming mould part which can be moved in said aperture or slot by means of a ram. Prior to a casting operation, the moveable mould part is moved to an outwardly projecting active position and, subsequent to the cast element hardening, is withdrawn by means of the ram, thereby to enable the cast element and the mould core to be separated from one another. All of the moveable core parts on one side surface of the mould core can be arranged on a plate extending parallel to the corresponding side surface of the mould core and arranged to be acted upon by the ram.The invention also relates to a mould core provided with apertures or slots for moveable mould parts, the mould parts being arranged for movement by means of a ram between an active, casting position and an inactive position in which the cast element can be removed from the mould core.

    摘要翻译: 在铸造诸如柱支撑块的混凝土元件中,其中使用设计成在该元件中产生一个或多个凹槽或凹槽的模芯,模芯设置有一个或多个孔或槽, 其中每个都布置有凹部形成模具部件,其可以通过冲头在所述孔或槽中移动。 在铸造操作之前,可移动模具部件移动到向外突出的活动位置,并且在铸件元件硬化之后,借助于冲头被拉出,从而使得铸造元件和模芯能够与一个 另一个。 模芯的一个侧表面上的所有可移动的芯部件可以布置在平行于模芯的相应侧表面延伸的板上并且被布置成被压头作用。 本发明还涉及一种具有用于可运动的模具部件的孔或槽的模芯,模具部件被布置成通过活塞,铸造位置和非活动位置之间的压头移动,其中铸件可从 模芯。

    Method of manufacturing prestressed construction elements in a long
mould bed
    2.
    发明授权
    Method of manufacturing prestressed construction elements in a long mould bed 失效
    在长模床中制造预应力结构件的方法

    公开(公告)号:US4201711A

    公开(公告)日:1980-05-06

    申请号:US900624

    申请日:1978-04-27

    IPC分类号: B28B23/04 B28B23/06

    CPC分类号: B28B23/06

    摘要: In a method of manufacturing consecutive pre-tensioned concrete elements, e.g. concrete sleepers, in a long mould bed, reinforcement ropes are tensioned and closure members are placed between different elements. Prior to casting closure members which are so formed that two or more cast elements are joined together via bridges or shoulders projecting outwardly fron the elements and surrounding the reinforcement ropes are placed in the mould bed at predetermined intervals. The string of cast elements is advanced to an element-separating station at one end of the bed where the elements are successively cut by means of a diamond saw or the like. The bridges between the elements are formed in a manner such that the reinforcement ropes are protected and a small, preferably the smallest possible section of concrete between the elements is severed when the elements are separated from the string of elements. The cast elements may be removed from the mould bed by lowering said moulds and carrying the string of elements on movable conveying means. Alternatively the moulds may be turned after the casting operation. The string of elements is then removed from the mould bed by pressing the string of elements down therefrom or by lifting the moulds.The invention also concerns a mould bed for casting a string of consecutive elements of the abovementioned kind, said mould bed comprising conveying means for advancing the string of elements to a severing station at one end of the bed.

    摘要翻译: 在制造连续的预张紧混凝土构件的方法中,例如, 混凝土轨枕在长模床中,加强绳被拉紧,封闭构件放置在不同的元件之间。 在铸造封闭构件之前,使得两个或多个铸造元件通过跨过元件并向外突出的桥或肩部连接在一起,并且以预定的间隔放置在模具床中。 一串铸造元件前进到床的一端的元件分离工位,其中元件通过金刚石锯等连续切割。 元件之间的桥梁以这样的方式形成,使得加强绳索被保护,并且当元件与元件串分离时,元件之间的小的,优选地,最小可能的混凝土部分被切断。 可以通过降低所述模具并将可移动的输送装置上的元件串来将铸造元件从模具床移除。 或者,模具可以在铸造操作之后转动。 然后通过从其中向下挤压元件串或通过提升模具将元件串从模具床中移除。 本发明还涉及用于铸造上述类型的连续元件串的模具床,所述模具床包括用于将所述元件串推进到床的一端处的切割站的输送装置。

    Method of casting thin-walled, hollow concrete posts
    3.
    发明授权
    Method of casting thin-walled, hollow concrete posts 失效
    铸造薄壁,空心混凝土柱的方法

    公开(公告)号:US4178338A

    公开(公告)日:1979-12-11

    申请号:US875724

    申请日:1978-02-07

    摘要: In a method of casting in a horizontal mould a hollow, reinforced tapering concrete post having a thin wall and particularly a length exceeding 10 to 15 m, there is placed in the mould a tapering reinforcing cage or basket in which a core, e.g. a steel core, is inserted to form a substantially annular mould chamber. Said mould chamber is closed with the exception of an upper filling slot. A readily pourable concrete mass is charged to the mould from above through said filling slot. The mould is then vibrated without being rotated such that concrete fills the annular mould chamber. Hardening of the concrete is accelerated by heating, and the core is withdrawn from the formed post before the concrete has completely hardened. The finished post is then removed from the mould. The concrete mixture used shall have a settling or slump measurement of between 1 and 5 cm prior to charging a flow-promoting agent, and a settling or slump measurement of between 12 and 14 cm subsequent to charging said flow-promoting agent. The concrete mixture has a stone size of at the most 8 mm. The core is preferably withdrawn 1.5 to 4 hours after completion of the casting operation.The invention also concerns a mould for casting concrete posts of the above mentioned kind.

    摘要翻译: 在水平模具中铸造具有薄壁并且特别是超过10至15μm的长度的中空加强的锥形混凝土柱的方法中,在模具中放置有锥形的加强笼或篮,其中, 插入钢芯以形成大致环形的模腔。 除了上部填充槽之外,所述模具室是关闭的。 通过所述填充槽将容易倾倒的混凝土块从上方装入模具。 然后,模具不会旋转而振动,使得混凝土填充环形模具室。 混凝土的硬化通过加热加速,并且在混凝土完全硬化之前将芯从成型的柱中取出。 然后将完成的柱从模具中取出。 使用的混凝土混合物在充入流动促进剂之前应具有1至5cm之间的沉降或坍落度测量,以及在充入所述流动促进剂之后的12至14cm之间的沉降或坍落度测量。 混凝土混合物的石头尺寸最大为8毫米。 核心优选在铸造操作完成后1.5至4小时内取出。 本发明还涉及一种用于铸造上述类型的混凝土柱的模具。

    Method of manufacturing a reinforcing cage for a concrete post, and a
fixture for carrying out the method
    4.
    发明授权
    Method of manufacturing a reinforcing cage for a concrete post, and a fixture for carrying out the method 失效
    制造用于混凝土柱的加强笼的方法和用于实施该方法的夹具

    公开(公告)号:US4150475A

    公开(公告)日:1979-04-24

    申请号:US875725

    申请日:1978-02-07

    摘要: In a method of manufacturing a reinforcing unit in the form of a cage or basket for a concrete post, the reinforcing rods are placed on pivotable, concave support arms in a fixture so as to form two separate concave parts of the finished unit. Support rings are then secured along said parts perpendicularly to the axis of the finished unit. The parts are brought together, and the support rings of one part are joined to the reinforcing rods of a corresponding part. The said parts are preferably brought together by swinging the support arms upwards in a manner such that the axis of the cage falls in a vertical longitudinal medium plane through the fixture. The support arms are pivoted downwards, whereupon a helical reinforcing element is threaded onto the unit from one end thereof and joined thereto.In this method use is made of a plurality of fixture units each comprising a frame, and two concave support arms pivotally arranged around horizontal shafts.

    摘要翻译: 在制造用于混凝土柱的保持架或篮的形式的加强单元的方法中,加强杆被放置在固定装置中的可枢转的凹形支撑臂上,以便形成成品单元的两个分离的凹部。 然后,支撑环沿着所述零件垂直于成品单元的轴线固定。 将部件组合在一起,并且一部分的支撑环连接到相应部件的加强杆。 优选地,所述部件通过以使得保持架的轴线落入穿过固定装置的垂直纵向中间平面的方式向上摆动支撑臂而被集合在一起。 支撑臂向下枢转,于是螺旋加强元件从其一端被螺纹连接到单元上并与之连接。