Method for enhancing the compatibility of a zinc-brine completion fluid
with a fracturing fluid
    3.
    发明授权
    Method for enhancing the compatibility of a zinc-brine completion fluid with a fracturing fluid 失效
    提高锌盐水完井液与压裂液的相容性的方法

    公开(公告)号:US06138755A

    公开(公告)日:2000-10-31

    申请号:US80993

    申请日:1998-05-19

    申请人: Rosa Swartwout

    发明人: Rosa Swartwout

    IPC分类号: C09K8/66 E21B43/26

    CPC分类号: C09K8/665

    摘要: In a method for enhancing the compatibility of a zinc-brine completion fluid with a fracturing fluid, test samples of selected completion fluids are combined with test samples of selected fracturing fluids to form an admixture. The parameters of incompatibility between the completion fluid and the fracturing fluid are analyzed and identified. The parameters or indicia of incompatibility identified can be precipitation, emulsification and/or an increase in viscosity. The zinc brine completion fluid is then blended with additives to remove these parameters of incompatibility. The additives can be selected from a group comprising hydrochloric acid, hydrobromic acid, acetate salts, citrate salts, and surfactants. At the well site, the altered zinc brine completion fluid is pumped in to displace drilling fluids in the wellbore before pumping in fracturing fluid. Additional altered brine completion can follow the fracturing fluid into the wellbore. Commingling of the altered zinc brine completion fluid with fracturing fluid in the wellbore or the formation can occur without substantial damage to the formation.

    摘要翻译: 在提高锌盐水完井液与压裂液的相容性的方法中,将所选择的完井液的测试样品与选定的压裂液的测试样品组合以形成混合物。 分析确定完井液与压裂液之间的不相容参数。 识别的不相容性的参数或标记可以是沉淀,乳化和/或粘度增加。 然后将锌盐完成液与添加剂混合以除去这些不相容的参数。 添加剂可以选自盐酸,氢溴酸,乙酸盐,柠檬酸盐和表面活性剂。 在井场,在泵送压裂液之前,将改变的锌盐完井液泵入以置换井眼中的钻井液。 额外改变的盐水完成可以跟随压裂液进入井眼。 改变的锌盐水完井液与井筒或地层中​​的压裂液混合可能会对地层造成实质的损害。

    In-situ rheology behavior characterization using data analytics techniques

    公开(公告)号:US11352883B2

    公开(公告)日:2022-06-07

    申请号:US15600100

    申请日:2017-05-19

    IPC分类号: E21B49/08 E21B47/26

    摘要: Examples of techniques for performing a wellbore construction operation in a wellbore are disclosed. In one example implementation according to aspects of the present disclosure, a computer-implemented method includes: performing a rheology test on a test fluid, the test fluid being representative of a fluid pumped through the wellbore, to generate test fluid data; performing, by the processing device, a data analysis on the test fluid data to generate at least one parameterized correlation; measuring a first property of the fluid to generate measured data; calculating, by the processing device, a second property of the fluid in the wellbore by using the parameterized correlations and the measured data to generate calculated data; and changing a parameter of the wellbore construction operation based at least in part on the calculated data.