Compliant buoyancy can guide
    1.
    发明授权
    Compliant buoyancy can guide 有权
    符合浮力可引导

    公开(公告)号:US06679331B2

    公开(公告)日:2004-01-20

    申请号:US09850599

    申请日:2001-05-07

    IPC分类号: E21B2912

    CPC分类号: B63B59/02

    摘要: A guide for a buoyancy can on a floating offshore platform. The platform includes at least one support structure adjacent the buoyancy can. The guide comprises at least one compression pad supported by the support structure and adjacent the exterior surface of the buoyancy can. Lateral movement of the buoyancy can toward the support structure compresses the compression pad so as to absorb the force generated by the buoyancy can movement, and so as to protect the buoyancy can and components of the floating offshore platform from damage.

    摘要翻译: 一个漂浮的指南可以在一个浮动的海上平台上。 平台包括与浮力罐相邻的至少一个支撑结构。 引导件包括由支撑结构支撑并且邻近浮力罐的外表面的至少一个压缩垫。 浮力的横向移动可以朝向支撑结构压缩压缩垫,以吸收由浮力罐运动产生的力,并且保护浮动海洋平台的浮力罐和部件免受损坏。

    System and Method for Coupling a Topside to a Floating Substructure
    2.
    发明申请
    System and Method for Coupling a Topside to a Floating Substructure 审中-公开
    将顶部耦合到浮动子结构的系统和方法

    公开(公告)号:US20090016822A1

    公开(公告)日:2009-01-15

    申请号:US12163176

    申请日:2008-06-27

    IPC分类号: E02D23/02

    CPC分类号: E02B17/04

    摘要: Systems and methods for coupling a topside to a fixed or floating substructure during float-over installation of the topside are disclosed. Some system embodiments include a first plate coupled to a leg of the substructure and a retaining wall coupled to the first plate and extending substantially normally therefrom, wherein the retaining wall and the first plate form a recess. The system embodiments further include a second plate disposed at an end of a leg of the topside, the second plate received within the recess and engaging the first plate, and a plurality of shims disposed between the second plate and the retaining wall, wherein the plurality of shims are configured to inhibit translational movement of the second plate relative to the first plate.

    摘要翻译: 公开了在顶部浮起安装期间将顶边耦合到固定或浮动子结构的系统和方法。 一些系统实施例包括联接到子结构的腿部的第一板和联接到第一板并且基本正常地从其延伸的保持壁,其中保持壁和第一板形成凹部。 系统实施例还包括设置在顶侧腿的端部的第二板,容纳在凹槽内并接合第一板的第二板和设置在第二板和挡土墙之间的多个垫片,其中多个 垫片被构造成禁止第二板相对于第一板的平移运动。

    Offshore tower for drilling and/or production
    3.
    发明授权
    Offshore tower for drilling and/or production 有权
    用于钻井和/或生产的海上塔

    公开(公告)号:US08899881B2

    公开(公告)日:2014-12-02

    申请号:US13288426

    申请日:2011-11-03

    IPC分类号: B63B35/44 B63B21/50

    摘要: An offshore structure comprises a hull having a longitudinal axis and including a first column and a second column moveably coupled to the first column. Each column has a longitudinal axis, a first end, and a second end opposite the first end. In addition, the offshore structure comprises an anchor coupled to the second end of the second column and configured to secure the hull to the sea floor. The first column includes a variable ballast chamber and a first buoyant chamber positioned between the variable ballast chamber and the first end of the first column. The first buoyant chamber is filled with a gas and sealed from the surrounding environment. The second column includes a variable ballast chamber. Further, the offshore structure comprises a topside mounted to the hull.

    摘要翻译: 海上结构包括具有纵向轴线并包括可移动地联接到第一列的第一柱和第二柱的船体。 每列具有纵向轴线,第一端部和与第一端部相对的第二端部。 此外,海上结构包括锚固件,其联接到第二塔的第二端并且构造成将船体固定到海底。 第一列包括可变镇流器室和位于可变压载室与第一列的第一端之间的第一浮力室。 第一个浮力室充满了气体,并与周围环境密封。 第二列包括可变镇流器室。 此外,海上结构包括安装在船体上的顶面。

    Methods for development of an offshore oil and gas field
    4.
    发明授权
    Methods for development of an offshore oil and gas field 有权
    近海油气田开发方法

    公开(公告)号:US08122965B2

    公开(公告)日:2012-02-28

    申请号:US11754851

    申请日:2007-05-29

    IPC分类号: E21B43/01

    摘要: Methods for developing an offshore field comprising deploying a lead drilling and production vessel to a offshore field to drill and complete at least one well. Production from the at least one well is initiated and evaluated. A secondary production vessel is selected based upon the evaluated production and is deployed to the offshore field to replace the lead drilling and production vessel and support production of the at least one well.

    摘要翻译: 开发海上油田的方法,包括将钻井和生产船舶部署到海上油田以钻取和完成至少一个油井。 开始和评估来自至少一个井的生产。 基于评估的生产选择次生产船,并且部署到海上油田以替代主钻井和生产船并支持至少一井的生产。

    Dual density mud return system
    5.
    发明授权
    Dual density mud return system 有权
    双密度泥浆返回系统

    公开(公告)号:US08453758B2

    公开(公告)日:2013-06-04

    申请号:US13555407

    申请日:2012-07-23

    IPC分类号: E21B15/02 E21B19/00

    CPC分类号: E21B21/001 E21B21/08

    摘要: Systems and methods for lifting drilling fluid from a well bore in a subsea formation are disclosed. Some system embodiments include a drill string suspended within a drilling riser to form the well bore, and a drilling fluid source for supplying drilling fluid through the drill string during drilling. A diverter is coupled between the drilling riser and a return line, while a power riser coupled to the return line at an interface. A lift fluid source supplies lift fluid through the power riser into the return line. The lift fluid is intermittently injected from the power riser through the interface into the return line to form one or more slugs of lift fluid positioned between slugs of drilling fluid, such that the combined density of lift fluid and drilling fluid in the return line is less than the density of the drilling fluid alone.

    摘要翻译: 公开了用于从海底地层中的井眼提升钻井液的系统和方法。 一些系统实施例包括悬挂在钻井立管中以形成井眼的钻柱,以及用于在钻井期间通过钻柱提供钻井液的钻井液源。 分流器连接在钻井立管和返回管路之间,而功率提升器在界面处耦合到返回管线。 提升流体源将提升流体通过电力提升管提供到回流管线中。 提升液体从供电立管通过界面间歇地注入返回管线,以形成一个或多个位于钻井液的lug塞之间的提升流体段,使得回流管路中的提升液和钻井液的组合密度较小 比单独钻井液的密度要高。

    OFFSHORE TOWER FOR DRILLING AND/OR PRODUCTION
    7.
    发明申请
    OFFSHORE TOWER FOR DRILLING AND/OR PRODUCTION 有权
    海水塔用于钻孔和/或生产

    公开(公告)号:US20120093587A1

    公开(公告)日:2012-04-19

    申请号:US13275648

    申请日:2011-10-18

    IPC分类号: E02B17/08 B63B35/44

    摘要: An offshore structure comprises a hull having a longitudinal axis, a first end, and a second end opposite the first end. In addition, the structure comprises an anchor coupled to the lower end of the hull and configured to secure the hull to the sea floor. The anchor has an aspect ratio less than 3:1. The hull includes a variable ballast chamber positioned axially between the first end and the second end of the hull and a first buoyant chamber positioned between the variable ballast chamber and the first end of the hull. The first buoyant chamber is filled with a gas and sealed from the surrounding environment. Further, the structure comprises a ballast control conduit in fluid communication with the variable ballast chamber and configured to supply a gas to the variable ballast chamber. The structure also comprises a topside mounted to the first end of the hull.

    摘要翻译: 海上结构包括具有纵向轴线,第一端和与第一端相对的第二端的船体。 此外,该结构包括锚固件,其联接到船体的下端并且被构造成将船体固定到海底。 锚点的纵横比小于3:1。 船体包括轴向定位在船体的第一端和第二端之间的可变镇流器室,以及位于可变镇流器室和船体的第一端之间的第一浮力室。 第一个浮力室充满了气体,并与周围环境密封。 此外,该结构包括与可变镇流器流体连通并且被配置为向可变镇流器室供应气体的镇流器控制导管。 该结构还包括安装到船体的第一端的顶面。

    Method for making a floating offshore drilling/producing structure
    8.
    发明授权
    Method for making a floating offshore drilling/producing structure 有权
    浮式海上钻井/生产结构的方法

    公开(公告)号:US07553106B2

    公开(公告)日:2009-06-30

    申请号:US11504475

    申请日:2006-09-05

    IPC分类号: B63B35/44

    摘要: A method for making a deep draft semi-submersible drilling/production vessel having a center of gravity below its center of buoyancy by constructing a plurality of buoyant individual columns. The method connects a pair of columns with at least a first top truss and a first bottom truss. The method additionally floats a connected first and second columns horizontally in water. The method floats the semi-submersible structure to a location for installation. The method concludes by deballasting the semi-submersible structure with connected deck forming a semi submersible drilling/production vessel having a center of gravity below its center of buoyancy with a draft between 300 and 500 feet.

    摘要翻译: 一种通过构造多个浮力的单柱来制造具有重心低于浮力中心的深冲程半潜式钻井/生产船的方法。 该方法将一对列与至少第一顶部桁架和第一底部桁架连接。 该方法另外在水中水平地漂浮连接的第一和第二列。 该方法将半潜式结构浮动到一个安装位置。 该方法的结论是将连接甲板的半潜式结构卸下,形成一个半潜式钻井/生产船,重心低于其浮力中心,牵引力在300到500英尺之间。

    METHOD OF DRILLING AND COMPLETING A WELL
    10.
    发明申请

    公开(公告)号:US20190368300A1

    公开(公告)日:2019-12-05

    申请号:US15993162

    申请日:2018-05-30

    申请人: James V. Maher

    发明人: James V. Maher

    IPC分类号: E21B33/064

    摘要: For completing a well, and for performing workover or intervention operations with the well, a surface BOP stack is coupled to the subsea wellhead or a subsea tree via a high pressure riser. The well is completed or the workover or intervention operations are performed through the surface BOP stack.