-
公开(公告)号:US20040103535A1
公开(公告)日:2004-06-03
申请号:US10717651
申请日:2003-11-21
申请人: BEHR GmbH & Co.
发明人: Walter Demuth , Wolfgang Geiger , Martin Kotsch , Hans-Joachim Krauss , Hagen Mittelstrass , Harald Raiser , Michael Sickelmann , Karl-Heinz Staffa , Christoph Walter
IPC分类号: B23P015/26
CPC分类号: F28F9/18 , B21D28/28 , F28F9/0202 , F28F9/0214 , F28F9/16 , F28F2265/32 , Y10T29/49373 , Y10T29/49389 , Y10T29/49391 , Y10T29/49995 , Y10T29/49996
摘要: The invention relates to a method for forming at least one flat-tube insertion slot in a header tube. A sawcut is introduced into the header tube during a sawing step, and the slot is configured, during a subsequent punching step, by means of a slot punch, which punches into the region of the sawcut. A rimmed opening can be configured during the punching step by using a slot punch with a larger width and/or length relative to the sawcut. The sawcut is preferably introduced to a depth less that the wall thickness of the header tube. The respective web region(s) between chamber of a multi-chamber header tube can be compressed during the punching operation to a level lower than that of a header-tube wall region functioning as a flat-tube insertion stop, in order to form a chamber-connecting duct.
-
公开(公告)号:US20020112849A1
公开(公告)日:2002-08-22
申请号:US10060085
申请日:2002-01-31
申请人: BEHR GmbH & Co.
发明人: Walter Demuth , Martin Kotsch , Hans-Joachim Krauss , Hagen Mittelstrass , Harald Raiser , Jochen Schumm , Michael Sickelmann , Karl-Heinz Staffa , Christoph Walter
IPC分类号: F28D001/00 , F28D001/02
CPC分类号: F28F9/18 , F28D1/0478 , F28F9/0214 , F28F9/0243 , F28F2220/00
摘要: A heat-exchanger tube block is disclosed having at least two header tubes (6, 7), which are C-shaped in cross section and each of which has a continuous longitudinal slot (10, 11). Flat tubes (2a, 2b) are inserted into the header-tube longitudinal slots. A cover-plate element (12) is provided which has a plurality of C-shaped openings and is fitted over one end of the at least two header tubes, so that the header tubes respectively fit into one of the openings and are secured in a fluid-tight manner. The tube-block can be used, for example, in an evaporator of CO2 air-conditioning installations for a motor vehicle.
-
公开(公告)号:US20020095789A1
公开(公告)日:2002-07-25
申请号:US10051374
申请日:2002-01-22
申请人: BEHR GmbH & Co.
发明人: Walter Demuth , Wolfgang Geiger , Martin Kotsch , Hans-Joachim Krauss , Hagen Mittelstrass , Harald Raiser , Michael Sickelmann , Karl-Heinz Staffa , Christoph Walter
IPC分类号: B23P015/26
CPC分类号: F28F9/18 , B21D28/28 , F28F9/0202 , F28F9/0214 , F28F9/16 , F28F2265/32 , Y10T29/49373 , Y10T29/49389 , Y10T29/49391 , Y10T29/49995 , Y10T29/49996
摘要: The invention relates to a method for forming at least one flat-tube insertion slot in a header tube. A sawcut is introduced into the header tube during a sawing step, and the slot is configured, during a subsequent punching step, by means of a slot punch, which punches into the region of the sawcut. A rimmed opening can be configured during the punching step by using a slot punch with a larger width and/or length relative to the sawcut. The sawcut is preferably introduced to a depth less that the wall thickness of the header tube. The respective web region(s) between chamber of a multi-chamber header tube can be compressed during the punching operation to a level lower than that of a header-tube wall region functioning as a flat-tube insertion stop, in order to form a chamber-connecting duct.
摘要翻译: 本发明涉及一种用于在集管中形成至少一个扁平管插入槽的方法。 在锯切步骤期间,锯切被引入到管头管中,并且在随后的冲压步骤期间,槽被构造成通过冲压入锯切区域的槽冲头。 通过使用相对于锯切具有较大宽度和/或长度的狭槽冲孔机,可以在冲压步骤期间配置边框开口。 锯切优选地被引入到小于集管的壁厚的深度。 多孔集管的腔室之间的相应腹板区域可以在冲压操作期间被压缩到比用作平管插入止动件的头管壁壁区域的水平低的水平面,以便形成 室连接管道。
-
公开(公告)号:US20040159114A1
公开(公告)日:2004-08-19
申请号:US10774509
申请日:2004-02-10
申请人: BEHR GmbH & CO.
发明人: Walter Demuth , Rainer Heilig , Volker Kirschner , Martin Kotsch , Hans-Joachim Krauss , Hagen Mittelstrass , Harald Raiser , Michael Sickelmann , Karl-Heinz Staffa , Christoph Walter
IPC分类号: G01K013/00
CPC分类号: B60H1/00978 , B60H1/3225 , F25B9/008 , F25B45/00 , F25B49/005 , F25B2309/061 , F25B2500/222 , F25B2600/17 , F25B2700/04 , F25B2700/1931 , F25B2700/2106 , F25B2700/21161 , F25B2700/21173 , F25B2700/21174 , F25B2700/21175
摘要: The invention relates to a method of refrigerant level monitoring in a refrigerant circuit of an air-conditioning or heat-pump system having a compressor and a refrigerant which may, depending on the operating point, be operated in the supercritical range. The method includes standstill level monitoring with the compressor switched off and/or in-operation level monitoring with the compressor switched on. In the case of in-operation level monitoring, the refrigerant overheat (dTnull) at the evaporator is registered and, in the event of excessive overheat, it is concluded that there is underfilling. At a standstill, the pressure and temperature of the refrigerant are registered, and it is concluded that there is an improper refrigerant filling level if the pressure (pKM) lies below a minimum pressure value (pmin) or the temperature (TKM) lies above a maximum saturation temperature value (Ts) with the pressure being outside a predefinable intended pressure range (nullpu,ponull).
摘要翻译: 本发明涉及一种具有压缩机和制冷剂的空调或热泵系统的制冷剂回路中的制冷剂液位监测方法,该方法可根据工作点在超临界范围内运行。 该方法包括在压缩机接通的情况下关闭压缩机和/或在操作水平监控的停止液位监控。 在运行状态监控的情况下,蒸发器中的制冷剂过热(dTü)被注册,如果发生过热过热,则认为是处于不足的状态。 在停止状态下,记录制冷剂的压力和温度,并且如果压力(pKM)低于最小压力值(pmin)或温度(TKM)位于上方 最大饱和温度值(Ts),其压力超出预定的预期压力范围([pu,po])。
-
-
-