Abstract:
A fuel cell system for powering a work load includes a fuel cell stack and a shunt regulator having a threshold detection; transistorized power switching element, and a dump load. The threshold detection element identifies when an abnormally high voltage rises. The power switching element routes power from the high voltage buss to the dump load. The dump load acts as an electrical energy sink, and may provide dissipated energy to the fuel cell stack in the form of heat. The switching element can also shunt power to the dump load when a digital control signal is set, for example at startup or during cold start conditions.
Abstract:
A method for embossing expanded graphite sheet material comprises removing at least a portion of the gas from within the material by exposing the material to a pressure less than atmospheric pressure, and then embossing the material. The pressure to which the material is exposed is preferably no greater than about 400 torr. An apparatus for embossing expanded graphite sheet material at a pressure less than atmospheric pressure comprises: an embossing device, a compression device adapted to urge the embossing device against the material, an embossing chamber comprising the at least one embossing device and adapted to receive the material and to be substantially gas-tight at least when the embossing device is urged against the material by the pressing device, and an evacuation device for reducing the pressure within the embossing chamber.
Abstract:
Certain fuel cells (e.g., solid polymer electrolyte fuel cells) may temporarily exhibit below normal performance after initial manufacture or after prolonged storage. While normal performance levels may be obtained after operating such fuel cells for a suitable time period, this process can take of order of days to fully complete. However, various conditioning and/or maintenance techniques are disclosed that provide for normal performance levels without the need for a lengthy initial operating period.