Wellbore Method and Apparatus for Completion, Production and Injection
    1.
    发明申请
    Wellbore Method and Apparatus for Completion, Production and Injection 有权
    井眼完井,生产和注射的方法和装置

    公开(公告)号:US20100032158A1

    公开(公告)日:2010-02-11

    申请号:US12086577

    申请日:2006-12-15

    IPC分类号: E21B43/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 该方法包括在邻近地下储层的井筒内设置多个具有主流路和次流径的防砂装置。 具有主要和次要流动路径的封隔器然后被联接在两个防砂装置之间,使得封隔器的主要和次要流动路径与沙子控制装置的主要和次要流动路径流体连通。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 封隔器上方的间隔可以在封隔器之前的间隔之前包装。 然后可以通过封隔器和防砂控制装置的二次流动路径将处理流体注入井眼。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。

    Wellbore Method and Apparatus for Completion, Production and Injection
    2.
    发明申请
    Wellbore Method and Apparatus for Completion, Production and Injection 有权
    井眼完井,生产和注射的方法和装置

    公开(公告)号:US20090294128A1

    公开(公告)日:2009-12-03

    申请号:US12086572

    申请日:2006-12-15

    IPC分类号: E21B43/16 E21B33/122

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid. The conditioned drilling fluid may be displaced adjacent to the sand control devices by a carrier fluid. Again, once the packer is set, the gravel packing the intervals with the carrier fluid having gravel may be performed.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 一种装置包括围绕初级和次级流动路径的可膨胀的封隔器元件,其中所述封隔器构造成阻挡在井筒环的一部分中的流动。 一种方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。 此外,该方法还可以包括将调砂装置和封隔器设置在调节钻井液中的井眼中。 调节钻井液可以通过载体流体邻近防砂装置移动。 再次,一旦封隔器被固定,则可以执行与具有砾石的载体流体间隔填充的砾石。

    Wellbore method and apparatus for completion, production and injection
    3.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08517098B2

    公开(公告)日:2013-08-27

    申请号:US12086577

    申请日:2006-12-15

    IPC分类号: E21B43/04 E21B43/08

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. The method includes disposing a plurality of sand control devices having a primary flow path and a secondary flowpath within a wellbore adjacent to a subsurface reservoir. A packer having primary and secondary flow paths is then coupled between two of the sand control devices such that the primary and secondary flow paths of the packer are in fluid flow communication with the primary and secondary flowpaths of the sand control devices. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. The interval above the packer may be packed before the interval below the packer. A treatment fluid may then be injected into the wellbore via the secondary flow paths of the packer and sand control devices. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 该方法包括在邻近地下储层的井筒内设置多个具有主流路和次流径的防砂装置。 具有主要和次要流动路径的封隔器然后被联接在两个防砂装置之间,使得封隔器的主要和次要流动路径与沙子控制装置的主要和次要流动路径流体连通。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 封隔器上方的间隔可以在封隔器之前的间隔之前包装。 然后可以通过封隔器和防砂控制装置的二次流动路径将处理流体注入井眼。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。

    Wellbore method and apparatus for completion, production and injection
    4.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08403062B2

    公开(公告)日:2013-03-26

    申请号:US13485571

    申请日:2012-05-31

    IPC分类号: E21B47/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: Method, system and apparatus to produce hydrocarbons includes a packer apparatus with a swellable packer element around primary and secondary flow paths, the packer is configured to block flow in a portion of a wellbore annulus. The method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore, and gravel packing the sand control devices in different intervals. Hydrocarbons are produced by passing hydrocarbons through the sand control devices with different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed.

    摘要翻译: 用于生产碳氢化合物的方法,系统和设备包括具有围绕主要和次要流动路径的可膨胀封隔器元件的封隔器装置,封隔器构造成阻挡在井筒环的一部分中的流动。 该方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 然后将封隔器设置在间隔内,其可以是井眼的露天部分,并且以不同的间隔将砂控制装置砾石包装。 碳氢化合物是通过使不同间隔的碳氢化合物通过防砂装置产生的,可提供区域隔离。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。

    Wellbore Method and Apparatus For Completion, Production and Injection
    5.
    发明申请
    Wellbore Method and Apparatus For Completion, Production and Injection 有权
    井眼方法和装置完成,生产和注射

    公开(公告)号:US20120234555A1

    公开(公告)日:2012-09-20

    申请号:US13485571

    申请日:2012-05-31

    IPC分类号: E21B33/122 E21B43/00

    CPC分类号: E21B43/04 E21B33/127

    摘要: Method, system and apparatus to produce hydrocarbons includes a packer apparatus with a swellable packer element around primary and secondary flow paths, the packer is configured to block flow in a portion of a wellbore annulus. The method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore, and gravel packing the sand control devices in different intervals. Hydrocarbons are produced by passing hydrocarbons through the sand control devices with different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed.

    摘要翻译: 用于生产碳氢化合物的方法,系统和设备包括具有围绕主要和次要流动路径的可膨胀封隔器元件的封隔器装置,封隔器构造成阻挡在井筒环的一部分中的流动。 该方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 然后将封隔器设置在间隔内,其可以是井眼的露天部分,并且以不同的间隔将砂控制装置砾石包装。 碳氢化合物是通过使不同间隔的碳氢化合物通过防砂装置产生的,可提供区域隔离。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。

    Wellbore method and apparatus for completion, production and injection
    6.
    发明授权
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US08215406B2

    公开(公告)日:2012-07-10

    申请号:US12086572

    申请日:2006-12-15

    IPC分类号: E21B47/04

    CPC分类号: E21B43/04 E21B33/127

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. One apparatus includes a swellable packer element around a primary and a secondary flow path, wherein the packer is configured to block flow in a portion of a wellbore annulus. One method includes disposing sand control devices having shunt tubes and a packer within a wellbore adjacent to a subsurface reservoir. The packer is then set within an interval, which may be an open-hole section of the wellbore. With the packer set, gravel packing of the sand control devices in different intervals may be performed. Then, hydrocarbons are produced from the wellbore by passing hydrocarbons through the sand control devices with the different intervals providing zonal isolation. In some embodiments, intervals may be alternatively packed and plugged, wherein the plugged intervals are not packed. In addition, the method may also include disposing the sand control devices and packer into the wellbore in conditioned drilling fluid. The conditioned drilling fluid may be displaced adjacent to the sand control devices by a carrier fluid. Again, once the packer is set, the gravel packing the intervals with the carrier fluid having gravel may be performed.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 一种装置包括围绕初级和次级流动路径的可膨胀的封隔器元件,其中所述封隔器构造成阻挡在井筒环的一部分中的流动。 一种方法包括将具有分流管和封隔器的防砂装置设置在邻近地下储层的井筒内。 封隔器然后设置在间隔内,其可以是井眼的露天部分。 使用封隔器,可以执行不同间隔的砂控制装置的砾石包装。 然后,通过使烃通过防砂装置以不同的间隔提供区带隔离从井筒产生烃。 在一些实施例中,间隔可以替代地包装和堵塞,其中堵塞的间隔不被包装。 此外,该方法还可以包括将调砂装置和封隔器设置在调节钻井液中的井眼中。 调节钻井液可以通过载体流体邻近防砂装置移动。 再次,一旦封隔器被固定,则可以执行与具有砾石的载体流体间隔填充的砾石。

    Wellbore method and apparatus for completion, production and injection
    8.
    发明申请
    Wellbore method and apparatus for completion, production and injection 有权
    Wellbore方法和装置完成,生产和注入

    公开(公告)号:US20080142227A1

    公开(公告)日:2008-06-19

    申请号:US11983447

    申请日:2007-11-09

    IPC分类号: E21B43/00 E21B17/02

    CPC分类号: E21B43/04 E21B17/02 E21B43/08

    摘要: A method, system and apparatus associated with the production of hydrocarbons are described. The apparatus comprising a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end. The load sleeve may include at least one transport conduit and at least one packing conduit. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection. The coupling assembly may also include a torque spacer to help control fluid flow relationships. Embodiments of the present invention eliminate or reduce timed connections, improving efficiency in hydrocarbon drilling, production, and monitoring operations.

    摘要翻译: 描述了与烃的生产相关的方法,系统和装置。 该装置包括接头组件,该接头组件包括主体部分,该主体部分具有初级和次级流体流动通道,其中主体部分在一端连接到负载套筒组件,在另一端附接到扭矩套筒组件。 负载套筒可以包括至少一个输送管道和至少一个填料管道。 主体部分可以包括用于在井下环境中使用的砂控制装置,封隔器或其它井工具。 接头组件还包括联接组件,其具有与主体部分的第二流体流动路径流体连通的歧管区域,并且有助于通过单个连接件组装第一和第二接头组件。 联接组件还可以包括用于控制流体流动关系的扭矩间隔件。 本发明的实施例消除或减少定时连接,提高碳氢化合物钻探,生产和监测操作的效率。