Method for quickly connecting a steam generator
    1.
    发明授权
    Method for quickly connecting a steam generator 有权
    快速连接蒸汽发生器的方法

    公开(公告)号:US08813506B2

    公开(公告)日:2014-08-26

    申请号:US13701893

    申请日:2012-03-07

    IPC分类号: F02C6/00 F02C7/26 F01K13/00

    摘要: A method is provided for connecting at least one further steam generator to a first steam generator in a power plant. The power plant includes at least two steam generators and a steam turbine, in which a fluid used to drive the steam turbine is conveyed in a fluid circuit having a plurality of steam systems. The steam systems are assigned individual steam generators and are able to be separated from one another by shut-off valves. The fluid of at least the first steam generator is connected to the steam turbine. The method involves opening the shut-off valve of at least one first steam system of the at least one further steam generator before the steam of the at least one further steam generator has reached approximately the same steam parameters as the steam of the first steam generator, so that steam can flow into the further steam generator.

    摘要翻译: 提供了一种用于将至少一个另外的蒸汽发生器连接到发电厂中的第一蒸汽发生器的方法。 发电厂包括至少两个蒸汽发生器和汽轮机,其中用于驱动蒸汽轮机的流体在具有多个蒸汽系统的流体回路中输送。 蒸汽系统分配有各自的蒸汽发生器,并且能够通过截止阀彼此分离。 至少第一蒸汽发生器的流体连接到蒸汽轮机。 该方法包括在至少一个另外的蒸汽发生器的蒸汽已经达到与第一蒸汽发生器的蒸汽大致相同的蒸汽参数之前打开至少一个另外的蒸汽发生器的至少一个第一蒸汽系统的截止阀 ,使得蒸汽可以流入另外的蒸汽发生器。

    METHOD FOR QUICKLY CONNECTING A STEAM GENERATOR
    2.
    发明申请
    METHOD FOR QUICKLY CONNECTING A STEAM GENERATOR 有权
    快速连接蒸汽发生器的方法

    公开(公告)号:US20140000259A1

    公开(公告)日:2014-01-02

    申请号:US13701893

    申请日:2012-03-07

    IPC分类号: F01K3/24 F01K13/02

    摘要: A method is provided for connecting at least one further steam generator to a first steam generator in a power plant. The power plant includes at least two steam generators and a steam turbine, in which a fluid used to drive the steam turbine is conveyed in a fluid circuit having a plurality of steam systems. The steam systems are assigned individual steam generators and are able to be separated from one another by shut-off valves. The fluid of at least the first steam generator is connected to the steam turbine. The method involves opening the shut-off valve of at least one first steam system of the at least one further steam generator before the steam of the at least one further steam generator has reached approximately the same steam parameters as the steam of the first steam generator, so that steam can flow into the further steam generator.

    摘要翻译: 提供了一种用于将至少一个另外的蒸汽发生器连接到发电厂中的第一蒸汽发生器的方法。 发电厂包括至少两个蒸汽发生器和汽轮机,其中用于驱动蒸汽轮机的流体在具有多个蒸汽系统的流体回路中输送。 蒸汽系统分配有各自的蒸汽发生器,并且能够通过截止阀彼此分离。 至少第一蒸汽发生器的流体连接到蒸汽轮机。 该方法包括在至少一个另外的蒸汽发生器的蒸汽已经达到与第一蒸汽发生器的蒸汽大致相同的蒸汽参数之前打开至少一个另外的蒸汽发生器的至少一个第一蒸汽系统的截止阀 ,使得蒸汽可以流入另外的蒸汽发生器。