-
公开(公告)号:US07331388B2
公开(公告)日:2008-02-19
申请号:US11348275
申请日:2006-02-06
IPC分类号: E21B43/04
CPC分类号: E21B43/04 , E21B37/08 , E21B43/045 , E21B43/25
摘要: A method for completing a well in a single trip is described, which includes inserting a completion tool assembly into the wellbore. The completion tool assembly includes a gravel packing assembly having a central channel substantially therethrough and a service tool assembly slidably positioned within the central channel. The service tool includes a pressure pulsating rotating jetting tool, connectable to a washpipe via a differential valve. By selectively dropping a plurality of plugging devices into the completion tool, multiple operations may be selectively performed in the wellbore in a single trip. In this way, the gravel packing and stimulating operations may be performed by a single completion tool assembly in a single trip into the wellbore, thus reducing the cost and time for performing the gravel packing and stimulating operations.
摘要翻译: 描述了在单次行程中完成井的方法,其包括将完井工具组件插入井眼。 完井工具组件包括一个具有基本穿过的中心通道的砾石充填组件和可滑动地定位在中心通道内的维修工具组件。 维修工具包括压力脉动旋转喷射工具,可通过差动阀连接到洗涤水管。 通过选择性地将多个插入装置放入完井工具中,可以在单次行程中在井眼中选择性地执行多个操作。 以这种方式,砾石填充和刺激操作可以通过单次完井工具组件在单次进入井眼中进行,从而降低了执行砾石填充和刺激操作的成本和时间。
-
2.
公开(公告)号:US07210527B2
公开(公告)日:2007-05-01
申请号:US11390226
申请日:2006-03-27
IPC分类号: E21B43/04
摘要: A method for completing a well in a single trip, including: inserting a completion tool assembly into the well, the completion tool assembly having a gravel packing assembly and a service tool assembly slidably positioned substantially within an interior cavity in the gravel packing assembly; removably coupling the service tool assembly and the gravel packing assembly; plugging at a first location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the first location through a first fluid flow path to an exterior of the completion tool assembly; circulating a gravel pack slurry through the completion tool assembly; plugging at a second location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the second location through a second flow path that reenters the interior channel at a location distal of the first and second plugging locations; and circulating a filter cake stimulating fluid through the well completion assembly.
摘要翻译: 一种用于在单次行程中完成井的方法,包括:将完井工具组件插入井中,完井工具组件具有砾石包装组件和可滑动地定位在砾石填料组件内的内腔内的维修工具组件; 可拆卸地联接维修工具组件和砾石包装组件; 堵塞在第一位置,由此阻止流体流过内部通道; 通过第一流体流动路径在第一位置处的堵塞阻塞的转向流体到完成工具组件的外部; 使砾石充填浆液循环通过完井工具组件; 堵塞在第二位置,由此阻止流体流过内部通道; 通过在第一和第二堵塞位置的远端的位置处重新输入内部通道的第二流动路径在第二位置处堵塞堵塞的分流流体; 并且将滤饼刺激流体循环通过完井组件。
-
公开(公告)号:US07017664B2
公开(公告)日:2006-03-28
申请号:US10095182
申请日:2002-03-11
IPC分类号: E21B43/04
摘要: A method for completing a well in a single trip, including: inserting a completion tool assembly into the well, the completion tool assembly having a gravel packing assembly and a service tool assembly slidably positioned substantially within an interior cavity in the gravel packing assembly; removably coupling the service tool assembly and the gravel packing assembly; plugging at a first location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the first location through a first fluid flow path to an exterior of the completion tool assembly; circulating a gravel pack slurry through the completion tool assembly; plugging at a second location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the second location through a second flow path that reenters the interior channel at a location distal of the first and second plugging locations; and circulating a filter cake stimulating fluid through the well completion assembly.
-
公开(公告)号:US20060162927A1
公开(公告)日:2006-07-27
申请号:US11390226
申请日:2006-03-27
申请人: David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
发明人: David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
IPC分类号: E21B43/04
摘要: A method for completing a well in a single trip, including: inserting a completion tool assembly into the well, the completion tool assembly having a gravel packing assembly and a service tool assembly slidably positioned substantially within an interior cavity in the gravel packing assembly; removably coupling the service tool assembly and the gravel packing assembly; plugging at a first location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the first location through a first fluid flow path to an exterior of the completion tool assembly; circulating a gravel pack slurry through the completion tool assembly; plugging at a second location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the second location through a second flow path that reenters the interior channel at a location distal of the first and second plugging locations; and circulating a filter cake stimulating fluid through the well completion assembly.
-
公开(公告)号:US20060231253A1
公开(公告)日:2006-10-19
申请号:US11348275
申请日:2006-02-06
申请人: Alvaro Vilela , David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
发明人: Alvaro Vilela , David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
IPC分类号: E21B43/04
CPC分类号: E21B43/04 , E21B37/08 , E21B43/045 , E21B43/25
摘要: A method for completing a well in a single trip is described, which includes inserting a completion tool assembly into the wellbore. The completion tool assembly includes a gravel packing assembly having a central channel substantially therethrough and a service tool assembly slidably positioned within the central channel. The service tool includes a pressure pulsating rotating jetting tool, connectable to a washpipe via a differential valve. By selectively dropping a plurality of plugging devices into the completion tool, multiple operations may be selectively performed in the wellbore in a single trip. In this way, the gravel packing and stimulating operations may be performed by a single completion tool assembly in a single trip into the wellbore, thus reducing the cost and time for performing the gravel packing and stimulating operations.
摘要翻译: 描述了在单次行程中完成井的方法,其包括将完井工具组件插入井眼。 完井工具组件包括一个具有基本穿过的中心通道的砾石充填组件和可滑动地定位在中心通道内的维修工具组件。 维修工具包括压力脉动旋转喷射工具,可通过差动阀连接到洗涤水管。 通过选择性地将多个插入装置放入完井工具中,可以在单次行程中在井眼中选择性地执行多个操作。 以这种方式,砾石填充和刺激操作可以通过单次完井工具组件在单次进入井眼中进行,从而降低了执行砾石填充和刺激操作的成本和时间。
-
6.
公开(公告)号:US20070187095A1
公开(公告)日:2007-08-16
申请号:US11691831
申请日:2007-03-27
申请人: David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
发明人: David Walker , Wade Rebardi , Marvin Traweek , Floyd Bishop
IPC分类号: E21B43/04
摘要: A method for completing a well in a single trip, including: inserting a completion tool assembly into the well, the completion tool assembly having a gravel packing assembly and a service tool assembly slidably positioned substantially within an interior cavity in the gravel packing assembly; removably coupling the service tool assembly and the gravel packing assembly; plugging at a first location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the first location through a first fluid flow path to an exterior of the completion tool assembly; circulating a gravel pack slurry through the completion tool assembly; plugging at a second location, whereby fluid is blocked from flowing through the interior channel; diverting fluid blocked by the plugging at the second location through a second flow path that reenters the interior channel at a location distal of the first and second plugging locations; and circulating a filter cake stimulating fluid through the well completion assembly.
摘要翻译: 一种用于在单次行程中完成井的方法,包括:将完井工具组件插入井中,完井工具组件具有砾石包装组件和可滑动地定位在砾石填料组件内的内腔内的维修工具组件; 可拆卸地联接维修工具组件和砾石包装组件; 堵塞在第一位置,由此阻止流体流过内部通道; 通过第一流体流动路径在第一位置处的堵塞阻塞的转向流体到完成工具组件的外部; 使砾石充填浆液循环通过完井工具组件; 堵塞在第二位置,由此阻止流体流过内部通道; 通过在第一和第二堵塞位置的远端的位置处重新输入内部通道的第二流动路径在第二位置处堵塞堵塞的分流流体; 并且将滤饼刺激流体循环通过完井组件。
-
公开(公告)号:US20060213670A1
公开(公告)日:2006-09-28
申请号:US11390230
申请日:2006-03-27
申请人: Floyd Bishop , Marvin Traweek , Richard Ross , David Walker , Dewayne Turner
发明人: Floyd Bishop , Marvin Traweek , Richard Ross , David Walker , Dewayne Turner
IPC分类号: E21B34/00
摘要: The present invention provides a bi-directional ball seat and method of use. In at least one embodiment, the present invention provides a fluid control system that includes a radial protrusion that can be selectively engaged and disengaged upstream and/or from a ball seat. For example, a ball can be placed in a passageway, engaged with a downstream ball seat, and the radial protrusion radially extended into the passageway distally from the seat relative to the ball. A reverse movement of the ball is restricted by the active radial movement of the radial protrusion into the passageway. The control system can be used to control a variety of tools associated with the well. Without limitation, the tools can include crossover tools, sleeves, packers, safety valves, separators, gravel packers, perforating guns, decoupling tools, valves, and other tools know to those with ordinary skills in the art.
-
公开(公告)号:US20060169462A1
公开(公告)日:2006-08-03
申请号:US11049126
申请日:2005-02-02
申请人: Floyd Bishop , Richard Ross , Marvin Traweek
发明人: Floyd Bishop , Richard Ross , Marvin Traweek
CPC分类号: E21B23/006 , E21B23/00 , E21B23/04 , E21B41/00 , E21B2034/002
摘要: An interventionless actuator for oil well tools is described wherein the actuator comprises at least one floating piston adapted to equalize a pressure differential and lock onto an actuating member. An interventionless actuator is described that is charged to an initial energy level less than the expected at-depth well pressure and then recharged down hole to approximately the at-depth well pressure by a floating piston. At the time of desired interventionless actuation, the actuator is overcharged to a pressure greater than the at-depth well pressure, which pressure is reacted by an actuating piston to generate an actuating movement.
摘要翻译: 描述了一种用于油井工具的无干涉式致动器,其中致动器包括至少一个浮动活塞,其适于均衡压力差并锁定在致动构件上。 描述了一种无干扰的致动器,其被加载到小于预期的深度井压力的初始能量水平,然后通过浮动活塞将井下再充电到大约深度井的压力。 在期望的无干扰致动时,致动器被过度充电到大于深度井压力的压力,该压力由致动活塞反应以产生致动运动。
-
公开(公告)号:US20060030208A1
公开(公告)日:2006-02-09
申请号:US10913680
申请日:2004-08-05
申请人: Paul Cassanego , Tan Khim , Michael Powers , Floyd Bishop , Kenneth Wong , Matthew Richter , Jon James
发明人: Paul Cassanego , Tan Khim , Michael Powers , Floyd Bishop , Kenneth Wong , Matthew Richter , Jon James
IPC分类号: H01R9/05
CPC分类号: H01R24/44 , H01R2103/00 , Y10S439/935
摘要: A coaxial connector including an outer conductor, a glass to metal seal (GMS) assembly, and a center conductor, is disclosed. The outer conductor has a tubular shape and defines longitudinal axis. Here, the center conductor and the GMS assembly are coupled before they are placed within the outer conductor. When the GMS assembly is coaxially placed within the outer conductor, the GMS assembly and the outer conductor define a variable gap enclosure. Fusing agent such as solder is placed within the variable gap enclosure. A bead is inserted into the outer conductor surrounding the center conductor and engaging the center conductor at a circumferential slot. The slide-on dielectric bead provides support for the center conductor and maintains the center conductor's position within the outer conductor and its characteristic impedance throughout.
摘要翻译: 公开了一种包括外导体,玻璃 - 金属密封(GMS)组件和中心导体的同轴连接器。 外导体具有管状形状并且限定纵向轴线。 这里,中心导体和GMS组件在被放置在外导体之前被耦合。 当GMS组件同轴放置在外部导体内时,GMS组件和外部导体限定了可变的间隙封闭。 诸如焊料的熔合剂置于可变间隙外壳内。 将一个珠子插入到围绕中心导体的外导体中,并在圆周槽处与中心导体接合。 滑动式电介质磁珠为中心导体提供支撑,并保持中心导体在外导体内的位置及其特征阻抗。
-
-
-
-
-
-
-
-